HomeMy WebLinkAboutRes 2025-07-1796 Change Order with Red River Construction for the Collin Pump Station ProjectCITY OF ANNA, TEXAS
RESOLUTION NO. aa�S -07- 179(
A RESOLUTION OF THE CITY OF ANNA, TEXAS, AUTHORIZING THE CITY
MANAGER TO CHANGE ORDER TO THE CONTRACT WITH RED RIVER
CONSTRUCTION FOR THE COLLIN PUMP STATION GROUND STORAGE TANK
NO.2 PROJECT, IN THE AMOUNT NOT TO EXCEED EIGHTY-SEVEN THOUSAND,
FOUR HUNDRED THIRTEEN AND NINETY-SIX CENTS. ($87,413.96); AND
PROVIDING FOR AN EFFECTIVE DATE
WHEREAS, the Collin Pump station Ground Storage Tank NO.2 is a project listed as a
capital improvement project in the City of Anna's Capital Improvement Plan; and,
WHEREAS, the continued growth of the City of Anna requires continuous improvements
to the City's public water system, including increased water supply, water storage,
resiliency, and redundancy to protect the health, safety, and welfare of the public; and,
WHEREAS, the project is immediately adjacent to an existing Atmos high pressure gas
main located in a 50-foot easement; and,
WHEREAS, upon further review and discussion, the City and Atmos have mutually
agreed that it is in the best interest of long-term safety for both entities for the underground
piping to be relocated to locations further away from the Atmos gas main, and due to this
relocation the chemical injection points has to be relocated to feed both lines, also adding
a new 8" Well line; and,
WHEREAS, Water Impact Fee funds shall be used to fund the contract in an amount not
to exceed $87,413.96.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ANNA, TEXAS THAT:
Section 1. Recitals Incorporated
The recitals above are incorporated herein as if set forth in full for all purposes.
Section 2. Authorization of Payment and Funding.
That the City Council of the City of Anna authorizes the City Manager to execute change
orders for the Collin Pump Station Ground Storage Tank No. 2 project in an amount not
to exceed $87,413.96 to Red River Constriction for for the Collin Pump Station Ground
Storage Tank No.2 project.
The funding for the project shall come from the Water Impact fee and shall not exceed
$87,413.96.
PASSED AND APPROVED by the City Council of the City of Anna, Texas on this
day of July 2025.
ATTEST:
City Secretary, Carrie Land THE CITY OF
manna
TtWAS w
1 1911)
ji *
APPROVED:
Mayor, Pete Cain
DESCRIPTION OF CONTRACTOR'S PRICE FOR PROPOSED MODIFICATION
PROJECT Collin Pump Station Ground Storage Tank No. 2 _
OWNER City of Anna, Texas —
CONTRACTOR RED RIVER CONSTRUCTION CO.
ENGINEER. Quiddity
REFERENCE: New 8" Well Line from new well to existing existing water
line including relocation of chemical injection points
PO Number: P007918
Requistion #: REQ08040
370
Date' Jul. 15, 2025
The Contractor proposes to make the following additions, modifications, or deletions to
the Work described in the Contract Documents:
As per the the City's request, we have priced the labor, materials, and equipment to provide a nvew 8"
Well Line from new well to existing water line including relocation of chemical injection points. The cost of
this change will be as follows:
1 ea 12x8 Cross
1875.34
$1,875.34
2 ea 8" Gate Valves
1781,92
$3,563.84
260 ft 8" DI Pipe and Fittings
69.85
$18,161.00
2 ea 1" Chemical Injection Quill
1895.77
$3,791.54
2 ea Tapping Saddles
1131.00
$2,262.00
1 ea Excavator
$2,800.00
1 ea Loader
$1,500.00
1 ea Pickup
$500.00
1 ea Fuel Oil Grease
$3,500.00
1 ea Small Tools
$3,480.00
320 hrs Labor
35.00
$11,200.00
240 hrs Equipment Operator
40.00
$9,600.00
48 hrs Supervision
50.00
$2,400.00
45% Labor Burden
$10,440.00
SUBTOTAL: _
$75,073.72
Contractor's Profit
$11,261.06
Bond
$1,079.18
TOTAL:
$87,413.96
Prepared by: Red River Construction Co.
y ---
Dean Porter, President
..i �.� � Z6
C.?
I z �
W Q
Q
1
�S
I
i
J.
i
(l
I
:�
--I
r
r
I
I
\i
a
.n
J
p
0
W
?s
�d
Q I
I
z
(�
5
I
i
I