Loading...
HomeMy WebLinkAboutRes 2020-11-817 Task Order with Biggs & Matthews, Incorporated for Collin Pump Station ExpansionCITY OF ANNA, TEXAS RESOLUTION NO. 2020-I1 - 81q A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE TASK ORDER BY AND BETWEEN THE CITY OF ANNA, TEXAS AND BIGGS & MATTHEWS, INCORPORATED, IN AN AMOUNT NOT TO EXCEED TWO HUNDRED FIVE THOUSAND DOLLARS AND ZERO CENTS ($2053000.00) AS SHOWN IN EXHIBIT "A" ATTACHED HERETO, AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Collin Pump Station Expansion is shown in the City of Anna Water Master Plan as a critical Capital Improvement Project, and; WHEREAS, expansion of the pump station will increase water supply for the City of Anna and the neighbors served by the system, and; WHEREAS, Biggs &Matthews, Inc. has provided a task order for engineering analysis and design services, and; WHEREAS, the project shall be funded through Water Impact Fees, and; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 'I. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Authorization. The City Council hereby authorizes the City Manager to execute the task order agreement as shown in Exhibit "A" attached hereto. PASSED AND APPROVED by the City Council of the City of Anna, November, 2020. �., ATTEST: Carrie Land, City Secretary w�UuuUuurrr,b A% . fV 7%E',(,� ate Pike, Mayor Texas, on this tiday of EXHIBIT "/A BIGGS & MATHEWS INC. Consulting Engineers August 12, 2020 Steven Smith Assistant Director of Public Works City of Anna P.O. Box 776 Amia, Texas RE: Revised Letter of Proposal for Engineering Sendces Collin Ptunp Station Expansion Dear Mr. Smith: Thank you for allowing me the opportunity to suUmit an engineering proposal relating to the development of additional groundwater supplies for the City of Anna. Having visited the site on Wednesday, November 6, 2019, it is readily apparent that the rapid growth within the Anna service area will require water supply, pressure maintenance, and distribution system improvements in order to provide for continuous and adequate service. It is my understanding that the City of Arora has contracted with Kirnley-Hone Engineers to develop a hydraulic water model and provide for an updated water plan. As a part of that effort, it is anticipated that Kirnley-Horn will make recommendations to Alma relative to pressure maintenance and distribution system improvements. By letter dated November 13, 2019, we submitted a letter of proposal to you for the design and development of five (5) additional wells. However, atter due consideration, the City has requested that we revise our proposal for the design and development of two (2) additional wells. As requested, this proposal only includes Well No. 10 &Well No. 11 (Collin Pump Station Expansion) to be designed a11d developed at the existing pump station site located near the intersection of Highway 5 and the Collin County Outer Loop. (See Attached). Well No. 10 would be designed to produce from the Woodbine Formation and Well No. 11 would be designed to produce from the Twin Mountains Formation, as generally described below: lristin� Site near the N.E. Corner of Colli» Co. Loop & High»ay S — if ells Nn. 10 & ]I ➢ Drill &Complete YYell in Woodbine Formation ➢ Anticipated Depth - 1,350' to 1, 550' ➢ Anticipated Capacity —150 gpm to 200 gpm. ➢ Estimated Construction Costs - $650, 000 to $675, 000 ➢ Drill &Complete Well in Tivin Mountains Formation ➢ Anticipated Depth — 2300' to 2600' ➢ Anticipnted Capacity — 375 gpm to 450 gpm ➢ Estimated Constnrdion Costs - $1,200,000 to $1,300,000 2500 BROOK AVENUE • WICHTI'A FALLS,1'EXAS 76301-6105 • (940) 766-0156 •FAX: (940) 766-3383 2019-045 . S�� PROPOSED PROFESSIONAL ENGINIIIIRINC SER1r/CIIS: ➢ Lump San - SI85,000: Poepontion ofplans & specificallonsfor botlnveils No. 10 & No. Ilan/ subndsslon to TCEQjorapproml to construcNrlevelop each of ilia proposed svells includMis general over efte and consulting services durIng consOrnction of eaclnsell. (Oimler to provide copy ofsite bounday sunVs) ➢ Lunp Sion-$15,000; Applimthrnto North Teras Gratndwafet•Comservation Dish•icl(NTGCD) for approval to construct and develop both of the proposed wells, omul prelmratia+ of flie regoirerl Hydrageological ReparlIStudy far the proposed wrllsdsrll site to comply with the Ioasl NTGCD requirentents. D Gaup San - $5,000: Final subnmtasiot ojnil well completion documents, es required by TCEQ and NTGCDjorflnaI approval and in oj0e proposed wells as a public unter supply. D Tsro (Z) Well Professiaml Services Package -Lump Stan 5205,000 ➢ 80%lee Due Upon Completion & Approval to Conshstel By TCEQ & NTGCD ➢ 10%Fee Due Upon Constnetion Completion & Final Approval By TCEQ & NIVCD D Design Plans &Speciflcalion Submitted to TCEQ— 45 DaysAflerNodce to Proceed D NTGCD Application& HydrogeologicalReport— 30 Days After Notice to Proceed Please review the above infomsalion, and contact me with arty questions or cotnmenls. Regards, DIGGS & MATHEWS, INC. (A434) KesryD� �P.E'� YresWent Approved'&_ /ounce to Proceed By: City ofAuna, Texas Sig/n.��atJureei Title: Dafe: ]019 015