Loading...
HomeMy WebLinkAboutOrd 891-2021 Amending Code Article 12.04, Sec 12.04.009 Sewer InspectionsCITY OF ANNA, TEXAS AN ORDINANCE OF THE CITY OF ANNA, TEXAS AMENDING THE ANNA CITY CODE OF ORDINANCES BY AMENDING ARTICLE 12.04, SECTION 12.04.009 REGARDING SEWER INSPECTIONS; PROVIDING FOR AN EFFECTIVE DATE; PROVIDING FOR A PENALTY CLAUSE NOT TO EXCEED $2,000 OR THE HIGHEST PENALTY AMOUNT ALLOWED BY LAW, WHICHEVER IS LESS; AND, PROVIDING FOR THE PUBLICATION OF THE CAPTION HEREOF. WHEREAS, the City of Anna, Texas ("City") has previously adopted ordinances, rules and regulations governing sewer inspections; and WHEREAS, the City Council of the City of Anna ("City Council") has investigated and determined that it would be advantageous and beneficial to the City and its citizens to amend Section 12.04.009 (Building/yard line sewer inspections) of Article 12.04 (Sewers) of The Anna City Code of Ordinances ("Anna Code") as set forth below; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS THAT: Section 1. Recitals Incorporated The above recitals are incorporated herein by reference for all purposes. Section 2. Amendment In accordance with Article 1.01 of the Anna Code the following amendments are made to Section 12.04.009 (Building/yard line sewer inspections) of Article 12.04 (Sewers): ARTICLE 12.04 SEWERS Sec. 12.04.009 Building/yard line sewer inspections Each building sewer shall be inspected by video camera-, including the he private segment and the public segment of the building sewer. The segment from the building cleanout to the public right-of-way or public easement shall be considered the private building sewer. The segment from the public right-of- way or public easement to the city's public sewer main shall be considered the public building sewer. Video inspections inspeGfieRS shall be conducted on all new construction projects and building sewers that are being replaced. Inspections shall be conducted by the Gity pubk weicks department a qualified third party selected by the contractor and all inspections shall be performed at no cost to the city. This -An inspection w4 -shall be ss#ed6iled-completed after the rough plumbing inspection when all test plugs have been removed and the CITY OF ANNA, TEXAS ORDINANCE NO. � building sewer trench has been backfilled. The contractor or owner shall submit to the public works department the following for review and approval or rejection: (1) a full and complete digital copy of the video; and U a fully executed and notarized "Building Sewer Video Inspection Affidavit" in a form provided by the city. The building sewer camera inspection must be performed prior to issuance of a green tag for bw siding sewers that are heir" replaGed Th�e-,s the permit, or a certificate of occupancy for the building. All damage, debris, and defects identified during the video inspection shall be remedied by the contractor or owner, and confirmed with a follow-up video inspection and set forth ini cnheduIe iR Fe iRSPeGtIGR A6.010of the are seetion ee appendix A of this „��o prior to city approval. The buildinq_permit applicant of record assumes sole responsibility for any debris removal or major repair required to the public segment of the building sewer for a period of 12 months from the inspection date listed below. It shall be a criminal misdemeanor punishable by a fine not to exceed $2,000 or the highest amount allowed by applicable law (whichever is less) for any person to edit or otherwise alter any video or other information related to an inspection required under this section in a manner that omits, disguises or otherwise removes, diminishes, or obscures any damage, debris or defect. (Ordinance 232-2005 adopted 10/25/05; Ordinance 476-2009 adopted 11/10/09; 2008 Code, pt. II, art. 49, sec. 4.26; Ordinance adopted Section 3. Savings, Repealing and Severability Clauses Itis hereby declared to be the intention of the City Council that the words, sentences, paragraphs, subdivisions, clauses, phrases, and provisions of this ordinance are severable and, if any phrase, sentence, paragraph, subdivision, clause, or provision of this ordinance shall be declared unconstitutional or otherwise invalid or inapplicable by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality, invalidity or inapplicability shall not affect any of the remaining words, sentences, paragraphs, subdivisions, clauses, phrases, or provisions of this ordinance, since the same would have been enacted by the City Council without the incorporation in this ordinance of any such unconstitutional, invalid or inapplicable words, sentences, paragraphs, subdivisions, clauses, phrases, or provisions. Further, all ordinances or parts of ordinances in force when the provisions of this ordinance become effective that are consistent and do not conflict with the terms and provisions of this ordinance are hereby ratified to the extent of such consistency and lack of conflict, and all ordinances or parts of ordinances in force when the provisions of this ordinance become effective that are inconsistent or in conflict with the terms and provisions contained in this ordinance are hereby repealed only to the extent of any such conflict. CITY OF ANNA, TEXAS ORDINANCE NO. 2 Section 4. Penalty Any violation of any of the terms of this ordinance, whether denominated in this ordinance as unlawful or not, shall be deemed a misdemeanor. Any person convicted of any such violation shall be fined in an amount not to exceed the lesser of $2,000 or the highest amount allowed by applicable law for each incidence of violation. Each day a violation exists is considered a separate offense and will be punished separately. Section 5. Publication of the Caption and Effective Date This ordinance shall be effective upon its passage by the City Council and posting and/or publication, if required by law, of its caption. The City Secretary is hereby authorized and directed to implement such posting and/or publication. PASSED by the City Council of the City of Anna, Texas this 12th day of January 2021. ATTESTED: Carrie L. Land, City Secreta `��atiuiiuurrrrrrii APPROVED: 'v fete Pike, ayor CITY OF ANNA, TEXAS ORDINANCE NO. 3 THE CITY OF Anifta BUILDING SEWER VIDEO INSPECTION AFFIDAVIT STATE OF TEXAS § COUNTY OF COLLIN § PUBLIC WORKS DEPARTMENT 1. BEFORE ME, the undersigned authority, on this day personally appeared, known by me to be a credible person and competent in all respects to make this Affidavit, and, who, being by me duly sworn, upon their oath stated: 2. "My name is I am over twenty-one years of age and am fully competent to make this affidavit, which is true and correct, and based on my personal knowledge of the facts stated herein. 3. device for the following segments ;+k The address of the sewer construction that is the subject of this affidavit is 4. The building sewer line at the address listed above has been fully inspected using an industry standard camera/video sewer line: (check all that apply) Private: from the building cleanout to the public right-of-way line or public easement Public: from the public right-of-way line or public easement to the City public sewer main 5. The building sewer line was found to be: (check all that apply) In working order with no visible defects or other problems No blockage or debris present No visible damage to the pipe, including breaks, cracks, deformation or deflection 6. The video of the inspection being submitted to the City of Anna with this affidavit was not edited or otherwise altered in in a manner that omits, disguises or otherwise removes, diminishes, or obscures any damage, debris or defect. Signed on the day of SIGNED (printed name) STATE OF TEXAS § COUNTY OF COLLIN § 20 Before me, a Notary Public, on this day personally appeared known to me to be the person whose name is subscribed to the foregoing document and, being by me first duly sworn, declared that the statements contained therein are true and correct. SIGNED before me on this _day of 20 Notary Public, State of Texas 1 Provide this completed affidavit with a digital copy of the video footage to the Public Works Department. The Building Permit Applicant of Record assumes responsibility for any debris removal or major repair required to the public segment of the building sewer for a period of 12 months from the inspection date listed below. s R r,, Fza,a� EUNlogip a 8# RX ka?l:vil all, _ I I �WrEn o=a CSI -t till- , \ ��. /.' F g Col Jr al alkl,p,a, TN lklmsw lb r oz S` it ' ` a • i -� � , i � - pep � 5 Y � u' iL Leila t ad pp all zu '14 6w i _- SSS - Sy:12 P31 LL ii RMD ail hra 'a i i r`I J u g. _ Sic z s I —\� oHaiti r I'll law or ,. � II ata - isa� 1 sr LL, PFF J'�!�—iii �7 • a - z w LLJ Q� Z'` U� in U) Y CL o uri¢w� z w d zrLLCD 1 ii o a r w w n o p U w z w Cn C7 of W cn '� W' — = W Q W F CL LL Q a. cv) N u' AM)Id Nosnmi33 fM Q W d ` � 4 5. m =m� I w _ Q 2 GA18 NODJOAN3MJHl CD via CnD wooCDE 0 ti M • U -' ,Z'rl LU LL a W Jaz o :3 r z O Y U O v � J z O w aWr U Q X U CL Q I Nty7d ,�3�I 1�IydW1 ?J311yM - 81I8/HX3 I- - •. � i Nty7d ,�3�I 1�IydW1 ?J311yM - 81I8/HX3 � i a �VriMr wv o wow Q J�Wid NosnmjE d K p MM I P GA"'10 NOI�JOANOMNi ING& wzw WW w0WcoWW WALL <W WW Z (n ieZD 7i CV U J Z CO ZD F- Z O r 0 LU U)0 ' Z0 - w X I U i O w a a U) ¢ ¢ ¢ M: d F o�:tAwo01rlr�Al 611CIS V" oil Nt�7d 33�11!) VdW121�M3S n u� wom �o z P �opjpmVV�(}}m o� �r� A .lM�1d NOSf1J2i�.� • Q b O w m w O y w � o � O N N .Jr LLI Q IQU�. Q LU I- O IW- M ak wOoQ wzw O W o w Z w R U) UA 0 Www; Q =ooa =�o W p Q LL t O a O Z U. O ao? J Q o N CQ� U _ W �- ngN��ALU W W Z Uj J O Q 2 anI8 NOi2JOV >13MJH1 Nh�7d 3�d 1�t�dW1 a1�0?J - d 1►S/HX� vJ X W Q z z Q W�� W Womp mala _ <oPtm � LL a ngN��ALU W W Z Nh�7d 3�d 1�t�dW1 a1�0?J - d 1►S/HX� vJ X W Q z z Q W�� W Womp mala _ <oPtm � LL a W W Z Uj J O w ate. a The Woods at Lindsey Place Project Summary Prepared by Bohler with notes for assumptions BE JN: TD202021 Location: Anna, Texas Lot Count Acreage Date 951 76.69 1/4/20: SUMMARY Onsite Public Improvements COST Phase 1 $4,731,026 Phase 2A $1,990,351 Phase 213 $2,786,898 Phase 3 $3,225,579 Phase 4 $3,485,461 Phase 5 SUBTOTAL $2,168,971 DESIGN AND ENGINEERING 10% $1,838,828.60 CONTINGENCIES 15% $2358.242.90 Summary - 1 The Woods at LindseyPlace Phase 1 Prepared by Bohler with notes for assumptions Location: Location: Lot Count 218 Anna, Texas Anna, Texas Acreage 1 11.25 Date 1 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 11.25 $22,500 UNCLASSIFIED EXCAVATION $3.50 CY 32,000 $112,000 MISC. DEMOLITION $101000 LS 2 $20,000 GEOTECH TESTING $0.25 CY 32,0001$8,000 SILT FENCE $1.25 LF 19,600 $24,500 INLET PROTECTION $30,000 LS 1 $30,000 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 SITE PREP/GRADING • 0• SANITARY SEWER UNIT $ UNIT QUANTITY TOTAL CONNECTION TO EXISTING $1,500 EA 1 $1,500 8" SDR -35 (< 12' DEEP) $37 LF 61750 $249,750 12" SDR -35 (< 12' DEEP) $45 LF 750 $33,750 15" SDR -35 (< 12' DEEP) $60 LF 500 $30,000 4' DIA. MANHOLE $4,000 EA 26 $104,000 5' DIA. MANHOLE $5,000 EA 7 $35,000 4" SEWER SERVICE $1,200 EA 218 $261,600 TRENCH SAFETY $1.50 LF 8,000 $12,000 TESTING (INCLUDING GEOTECH) $5.00 LF 81000 $40,000 MISCELLANEOUS $767,600 PERCENT 10% $76,760 BONDS $767,600 PERCENT 2% $15,352 INSPECTION FEE $767,600 PERCENT 3% $23,028 TOTALSANITARY SEWER 40 Phase 1 - 2 The Woods at LindseyPlace Phase 1 Prepared by Bohler with notes for assumptions Location: Location: Anna, Texas Anna) Texas Lot Count Acreage Date 218 11.25 1/4/2021 $1,963,099 PERCENT 45% $883,395 TESTING DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECT TO EXISTING $1,500 EA 2 $3,000 6" PVC (WITH FITTINGS) $24 LF 440 $10560 8" PVC (WITH FITTINGS) $28 LF 9,800 $274,400 8" GATE VALVE AND BOX $1,200 EA 50 $60,000 FIRE HYDRANT ASSEMBLY $3,500 EA 22 $77,000 1" WATER SERVICE (W/METER) $600 EA 218 $130,800 1.5" IRRIGATION SERVICE (W/METER) $800 EA 2 $1,600 TRENCH SAFETY $1.00 LF 101240 $10,240 TESTING (INCLUDING GEOTECH) $5.00 LF 10,240 $51,200 MISCELLANEOUS $618,800 PERCENT 10% $61,880 BONDS $618,800 PERCENT 2% $12,376 INSPECTION FEE $618,800 PERCENT 3% $18,564 $1,500 EA 20 $30,000 MISCELLANEOUS Phase 1 - 3 STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $1,963,099 PERCENT 45% $883,395 TESTING $883,395 PERCENT 3% $26,502 BONDS $883,395 PERCENT 2% $17,668 INSPECTION FEE $883,395 1 PERCENT 1 3% $26,502 ISTORM SEWER TOTALi. PAVING UNIT $ UNIT QUANTITY TOTAL 6" REINFORCED CONC. PAVING (W/CURB) $36 SY 33,756 $1,215,200 6" SUBGRADE PREPARATION $4.50 SY 35,781 $161,014 HYDRATED LIME (36#/SY) $180 TON 644 $115,930 4" THICK SIDEWALK (5' WIDE) $5.00 SF 3500 $17,500 4" THICK TRAIL (8' WIDE) $5.00 SF 81800 $44,000 BARRIER FREE RAMP $2,500 EA 30 $75,000 TRAFFIC CONTROL $5,000 LS 1 $5,000 SIGNS (STREET BLADES / STOP) $1,500 EA 20 $30,000 MISCELLANEOUS $1,663,644 PERCENT 10% $166,364 TESTING $1,663,644 PERCENT 3% $49,909 BONDS $1,663,644 PERCENT 2% $33,273 INSPECTION FEE $116631644 PERCENT 3% $49,909 TOTALPAVING 0• Phase 1 - 3 The Woods at Lindsey Place Phase 1 Prepared by Bohler with notes for assumptions BE JN: Location: Lot Count 218 TD202021 Anna, Texas Acreage 11.25 Date 1 SUMMARY SECTION COST SITE PREP/GRADING $219,500 SANITARY SEWER $882,740 DOMESTIC WATER $711,620 STORM SEWER $954,067 PAVING $1,963,099 DESIGN AND ENGINEERING CONTINGENCIES 10 % $473,102.60 15% $709,653.90 Phase 1 - 4 The Woods at Lindsey Place Phase 1 CIP - Rosamond Paving & Drainage, Water, Offsite Sewer Rosamond Offsite BEJN: Location: TD202021 Anna, Texas Lot Count Acreage Date 0 1 19.14 1 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 19.14 $38,280 UNCLASSIFIED EXCAVATION $3.50 CY 491143 $172,000 MISC. DEMOLITION $70,000 LS 1 $70,000 SEED AND WATER $0.20 SF 298,500 $59,700 SOD AND WATER $0.50 SF 361,800 $180,900 SILT FENCE $1.25 LF 31,960 $39,950 INLET PROTECTION $30,000 LS 1 $30,000 CONSTRUCTION ENTRANCE $2,500 EA 3 $7,500 TESTING $476,195 PRECENT 3% $14,286 TOTALSITE PREP/GRADING SANITARY SEWER UNIT $ UNIT QUANTITY TOTAL CONNECTION TO EXISTING $1,500 EA 1 $1,500 12" SDR -35 (< 12' DEEP) $45 LF 680 $30,600 15" SDR -35 (< 12' DEEP) $60 LF 11860 $111,600 5' DIA. MANHOLE $5,000 EA 8 $40,000 TRENCH SAFETY $1.50 LF 21540 $3,810 TESTING (INCLUDING GEOTECH) $5.00 LF 21540 $12,700 MISCELLANEOUS $200,210 PERCENT 10% $20,021 BONDS $200,210 PERCENT 2% $4,004 INSPECTION FEE $200,210 PERCENT 3% $6,006 Phase 1 CIP - 5 The Woods at LindseyPlace Phase 1 CIP - Rosamond Paving & Drainage, Rosamond Offsite Water, Offsite Sewer Location: Anna, Texas Location: Anna, Texas Lot Count Acreage Date 0 19A4 1/4/2021 DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECT TO EXISTING $1,500 EA 2 $3,000 6" PVC (WITH FITTINGS) $24 LF 260 $6,240 8" PVC (WITH FITTINGS) $28 LF 360 $10,080 16" PVC (WITH FITTINGS) $60 LF 6,790 $407,400 8" GATE VALVE AND BOX $1,200 EA 4 $4,800 12" GATE VALVE AND BOX $2,000 EA 3 $6,000 16" BUTTERFLY VALVE $6,000 EA 22 $132,000 FIRE HYDRANT ASSEMBLY $3,500 EA 13 $45,500 TRENCH SAFETY $1.00 LF 7,410 $7,410 TESTING (INCLUDING GEOTECH) $5.00 LF 71410 $37,050 MISCELLANEOUS $659,480 PERCENT 10% $65,948 BONDS $659,480 PERCENT 2% $13,190 INSPECTION FEE $659,480 PERCENT 3% $19,784 Phase 1 CIP - 6 The Woods at LindseyPlace Phase 1 CIP - Rosamond Paving & Drainage, Water, Offsite Sewer Rosamond Offsite Location: Location: Lot Count 0 Anna, Texas Anna, Texas Acreage Date 19.14 1/4/2021 STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $1,450,080 PERCENT 45% $652,536 CULVERT CROSSING $200,000 EA 2 $400,000 TESTING $1,052,536 PERCENT 3% $31,576 BONDS $1,052,536 PERCENT 2% $21,051 INSPECTION FEE $1,052,536 PERCENT 3% $31,576 STORM SEWER TOTAL PAVING UNIT $ UNIT QUANTITY TOTAL 8" REINFORCED CONC. PAVING (W/CURB) $50 SY 18,056 $902,778 8" SUBGRADE PREPARATION $5.00 SY 19,139 $95,694 HYDRATED LIME (36#/SY) $180 TON 345 $62,010 4" THICK TRAIL (8' WIDE) $5.00 SF 19,080 $95,400 BARRIER FREE RAMP $2,500 EA 8 $20,000 TRAFFIC CONTROL $20,000 LS 1 $20,000 SIGNS (STREET BLADES / STOP) $1,500 EA 2 $3,000 PAVEMENT MARKINGS $30,000 LS 1 $30,000 MISCELLANEOUS $1,228,882 PERCENT 10% $122,888 TESTING $1,228,882 PERCENT 3% $36,866 BONDS $1,228,882 PERCENT 2% $24,578 INSPECTION FEE $1,228,882 PERCENT 3% $36,866 FAVING TOTAL $1g4501080 SUMMARY SECTION COST SITE PREP/GRADING $612,616 SANITARY SEWER $230,242 DOMESTIC WATER $758,402 STORM SEWER $1,136,739 PAVING $1,450,080 DESIGN AND ENGINEERING CONTINGENCIES 10% $418,807.85 15% $628,211.78 Phase 1 CIP - 7 The Woods at LindseyPlace Phase 2A Prepared by Bohler with notes for assumptions Location: Location: Anna, Texas Anna, Texas Lot Count Acreage Date 75 4.82 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 4.82 $9,640 UNCLASSIFIED EXCAVATION $3.50 CY 14,000 $49,000 MISC. DEMOLITION $10,000 LS 2 $20,000 GEOTECH TESTING $0.25 CY 14,000 $3,500 SILT FENCE $1.25 LF 8,400 $10500 INLET PROTECTION $15,000 LS 1 $15,000 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 PREP/GRADINGSITE • 40 SANITARY SEWER UNIT $ UNIT QUANTITY TOTAL CONNECTION TO EXISTING $1,500 EA 2 $3,000 8" SDR -35 (< 12' DEEP) $37 LF 3,400 $125,800 4' DIA. MANHOLE $4,000 EA 13 $52,000 4" SEWER SERVICE $1,200 EA 75 $90,000 TRENCH SAFETY $1.50 LF 31400 $5,100 TESTING (INCLUDING GEOTECH) $5.00 LF 31400 $17,000 MISCELLANEOUS $292,900 PERCENT 10% $29,290 BONDS $292,900 1 PERCENT 1 2% $5,858 INSPECTION FEE $292,900 1 PERCENT 1 3% $8,787 Phase 2A - 8 The Woods at Lindsey Place Phase 2A Prepared by Bohler with notes for assumptions BE IT TD202021 Location: Anna, Texas Count I Acreage I Date 75 4.82 1/4/2021 DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECTTO EXISTING $1,500 EA 2 $3,000 6" PVC (WITH FITTINGS) $24 LF 160 $3,840 8" PVC (WITH FITTINGS) $28 LF 41200 $117,600 8" GATE VALVE AND BOX $1,200 EA 14 $16,800 FIRE HYDRANT ASSEMBLY $3,500 EA 8 $28,000 1" WATER SERVICE (W/METER) $600 EA 75 $45,000 1.5" IRRIGATION SERVICE (W/METER) $800 EA 1 $800 TRENCH SAFETY $1.00 LF 41360 $4,360 TESTING (INCLUDING GEOTECH) $5.00 LF 4,360 $21,800 MISCELLANEOUS $241,200 PERCENT 10% $24,120 BONDS $241,200 PERCENT 2% $4,824 INSPECTION FEE $241,200 PERCENT 3% $7,236 DOMESTIC WATER TOTAL:0 STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $851,949 PERCENT 45% $383,377 TESTING $383,377 PERCENT 3% $11,501 BONDS $383,377 PERCENT 2% $7,668 INSPECTION FEE $383,377 PERCENT 3% $111501 STORM• 0 - PAVING UNIT $ UNIT QUANTITY TOTAL 6" REINFORCED CONC. PAVING (W/CURB) $36 SY 14,467 $520,800 6" SUBGRADE PREPARATION $4.50 SY 15,335 $69,006 HYDRATED LIME (36#/SY) $180 TON 276 $49,684 4" THICK SIDEWALK (5' WIDE) $5.00 SF 91100 $45,500 BARRIER FREE RAMP $2,500 EA 8 $20,000 TRAFFIC CONTROL $5,000 LS 1 $5,000 SIGNS (STREET BLADES / STOP) $1,500 EA 8 $12,000 MISCELLANEOUS $721,990 PERCENT 10% $72,199 TESTING $721,990 PERCENT 3% $21,660 BONDS $721,990 PERCENT 2% $14,440 INSPECTION FEE $721,990 PERCENT 3% $21,660 Phase 2A - 9 The Woods at Lindsey Place Phase 2A by Bohler with notes for assumptions BE JN: Location: Lot Count 75 TD202021 Anna, Texas Acreage Date 4.82 1 1/4/20; 1 SUMMARY SECTION COST SITE PREP/GRADING $110,140 SANITARY SEWER $336,835 DOMESTIC WATER $277,380 STORM SEWER $414,047 PAVING $851,949 SUBTOTAL•0 DESIGN AND ENGINEERING CONTINGENCIES 10% $199,035.10 15% $298,552.65 Phase 2A - 10 The Woods at Lindsey Place Phase 2B Prepared by Bohler with notes for assumptions BEJN: Location: Lot Count 123 TD202021 Anna, Texas Acreage 6.43 Date 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 6.43 $12,860 UNCLASSIFIED EXCAVATION $3.50 CY 18,000 $63,000 MISC. DEMOLITION $10,000 LS 2 $20,000 GEOTECH TESTING $0.25 CY 18,000 $4,500 SILT FENCE $1.25 LF 111200 $14,000 INLET PROTECTION $20,000 LS 1 $20,000 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 TOTALSITE PREP/GRADING .0 SANITARY SEWER UNIT $ UNIT QUANTITY TOTAL CONNECTION TO EXISTING $1,500 EA 1 $1,500 8" SDR -35 (< 12' DEEP) $37 LF 2,700 $99,900 10" SDR -35 (< 12' DEEP) $42 LF 11600 $67,200 12" SDR -35 (< 12' DEEP) $45 LF 600 $27,000 4' DIA. MANHOLE $4,000 EA 13 $52,000 5' DIA. MANHOLE $5,000 EA 4 $20,000 4" SEWER SERVICE $1,200 EA 123 $147,600 TRENCH SAFETY $1.50 LF 4,900 $7,350 TESTING (INCLUDING GEOTECH) $5.00 LF 41900 $24,500 MISCELLANEOUS $447,050 PERCENT 10% $44,705 BONDS $447,050 PERCENT 2% $8,941 INSPECTION FEE $447,050 PERCENT 3% $13,412 Phase 2B - 11 The Woods at LindseyPlace Phase 213 Prepared by Bohler with notes for assumptions Location: Location: Anna, Texas Anna, Texas Lot Count Acreage Date 123 6.43 1/4/2021 DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECTTO EXISTING $1,500 EA 2 $3,000 6" PVC (WITH FITTINGS) $24 LF 280 $6,720 8" PVC (WITH FITTINGS) $28 LF 51600 $156,800 8" GATE VALVE AND BOX $1,200 EA 35 $42,000 FIRE HYDRANT ASSEMBLY $3,500 EA 14 $49,000 1" WATER SERVICE (W/METER) $600 EA 123 $73,800 1.5" IRRIGATION SERVICE (W/METER) $800 EA 1 $800 TRENCH SAFETY $1.00 LF 5,880 $5,880 TESTING (INCLUDING GEOTECH) $5.00 LF 5,880 $29,400 MISCELLANEOUS $367,400 PERCENT 10% $36,740 BONDS $367,400 PERCENT 2% $7,348 INSPECTION FEE $367,400 PERCENT 3% $11,022 ,DOMESTIC• STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $1,153,042 PERCENT 45% $518,869 TESTING $518,869 PERCENT 3% $15,566 BONDS $518,869 PERCENT 2% $10,377 INSPECTION FEE $518,869 1 PERCENT 1 3% $15,566 STORM• .0 ,378 PAVING UNIT $ UNIT QUANTITY TOTAL 6" REINFORCED CONC. PAVING (W/CURB) $36 SY 191289 $694,400 6" SUBGRADE PREPARATION $4.50 SY 201446 $92,008 HYDRATED LIME (36#/SY) $180 TON 368 $66,246 4" THICK SIDEWALK (5' WIDE) $5.00 SF 800 $4,000 4" THICK TRAIL (8' WIDE) $5.00 SF 51300 $26,500 BARRIER FREE RAMP $2,500 EA 26 $65,000 TRAFFIC CONTROL $5,000 LS 1 $5,000 SIGNS (STREET BLADES / STOP) $1,500 EA 16 $24,000 MISCELLANEOUS $977,154 PERCENT 10% $97,715 TESTING $977,154 PERCENT 3% $29,315 BONDS $977,154 PERCENT 2% $19,543 INSPECTION FEE $977,154 PERCENT 3% $29,315 Phase 2B - 12 IThe Woods at Lindsey Place Phase 213 Prepared by Bohler with notes for assumptions BE JN: Location: Lot Count TD202021 Anna, Texas Acreage Date 6.43 1 /4/2021 SUMMARY SECTION COST SITE PREP/GRADING $136,860 SANITARY SEWER $514,108 DOMESTIC WATER $422,510 STORM SEWER $560,378 PAVING $1,153,042 SUBTOTAL $2o786p898 DESIGN AND ENGINEERING CONTINGENCIES 10% $278,689.80 15% $418,034.70 Phase 2B - 13 The Woods at LindseyPlace Phase 3 Prepared by Bohler with notes for assumptions Location: Location: Anna, Texas Anna, Texas Lot Count Acreage Date 187 7.35 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 7.35 $14,700 UNCLASSIFIED EXCAVATION $3.50 CY 21,000 $73,500 MISC. DEMOLITION $10,000 LS 5 $50,000 GEOTECH TESTING $0.25 CY 21,000 $5,250 SILT FENCE $1.25 LF 12,800 $16,000 INLET PROTECTION $30,000 LS 1 $30,000 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 REP/GRADING SANITARY SEWER UNIT $ UNIT QUANTITY TOTAL CONNECTION TO EXISTING $1,500 EA 4 $6,000 8" SDR -35 (< 12' DEEP) $37 LF 51700 $210,900 4' DIA. MANHOLE $4,000 EA 23 $92,000 4" SEWER SERVICE $1,200 EA 187 $224,400 TRENCH SAFETY $1.50 LF 5,700 $8,550 TESTING (INCLUDING GEOTECH) $5.00 LF 5,700 $28,500 MISCELLANEOUS $570,350 PERCENT 10% $57,035 BONDS $570,350 1 PERCENT 1 2% $11,407 INSPECTION FEE $570,350 PERCENT 3% $17,111 Phase 3 - 14 The Woods at LindseyPlace Phase 3 Prepared by Bohler with notes for assumptions Location: Location: Lot Count 187 Anna, Texas Anna, Texas Acreage 7.35 Date 1/4/2021 DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECT TO EXISTING $1,500 EA 5 $7,500 6" PVC (WITH FITTINGS) $24 LF 280 $6,720 8" PVC (WITH FITTINGS) $28 LF 6,400 $179,200 8" GATE VALVE AND BOX $1,200 EA 32 $38,400 FIRE HYDRANT ASSEMBLY $3500 EA 14 $49,000 1" WATER SERVICE (W/METER) $600 EA 187 $112,200 1.5" IRRIGATION SERVICE (W/METER) $800 EA 0 $0 TRENCH SAFETY $1.00 LF 61680 $6,680 TESTING (INCLUDING GEOTECH) $5.00 LF 61680 $33,400 MISCELLANEOUS $433,100 PERCENT 10% $43,310 BONDS $433,100 PERCENT 2% $8,662 INSPECTION FEE $433,100 PERCENT 3% $12,993 IDOMESTIC WATER TOTAL0. STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $1,264,914 PERCENT 45% $569,211 TESTING $569,211 PERCENT 3% $17,076 BONDS $569,211 PERCENT 2% $11,384 INSPECTION FEE $569,211 1 PERCENT 1 3% $17,076 ISTORM SEWER TOTAL PAVING UNIT $ UNIT QUANTITY TOTAL 6" REINFORCED CONC. PAVING (W/CURB) $36 SY 22,044 $793,600 6" SUBGRADE PREPARATION $4.50 SY 231367 $105,152 HYDRATED LIME (36#/SY) $180 TON 421 $75,709 4" THICK SIDEWALK (5' WIDE) $5.00 SF 11900 $9,500 4" THICK SIDEWALK (EXTRA 12" FOR 6' WALK) $5.00 SF 21300 $11,500 4" THICK TRAIL (8' WIDE) $5.00 SF 11600 $8,000 BARRIER FREE RAMP $2,500 EA 20 $50,000 TRAFFIC CONTROL $5,000 LS 1 $5,000 SIGNS (STREET BLADES/ STOP) $1,500 EA 9 $13,500 MISCELLANEOUS $11071,961 PERCENT 10% $107,196 TESTING $1,071,961 PERCENT 3% $32,159 BONDS $1,071,961 PERCENT 2% $21,439 INSPECTION FEE $1,071,961 PERCENT 3% $32,159 TOTALIPAVING Phase 3 - 15 The Woods at Lindsey Place Phase 3 Prepared by Bohler with notes for assumptions BE JN: Location: Lot Count 187 TD202021 Anna, Texas Acreage Date 7.35 1 1/4/20; 1 SUMMARY SECTION COST SITE PREP/GRADING $191,950 SANITARY SEWER $655,903 DOMESTIC WATER $498,065 STORM SEWER $614,747 PAVING $1,264,914 SUBTOTAL DESIGN AND ENGINEERING CONTINGENCIES 10% $322,557.90 15% $483,836.85 Phase 3 - 16 The Woods at LindseyPlace Phase 3 CIP - Ferguson Water Prepared by Bohler with notes for assumptions Location: Location: Lot count 0 Anna, Texas Anna, Texas Acreage 1 1.04 Date 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $4,000 ACRE 1.04 $4,160 MISC. DEMOLITION $10,000 LS 1 $10,000 SEED AND WATER $0.20 SF 481150 $9,630 SILT FENCE $1.25 LF 13)2101 $4,013 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 SITE PREP/GRADING DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECT TO EXISTING $1,000 EA 1 $1,000 6" PVC (WITH FITTINGS) $24 LF 60 $1,440 8" PVC (WITH FITTINGS) $28 LF 30 $840 12" PVC (WITH FITTINGS) $42 LF 1515 $63,630 8" GATE VALVE AND BOX $1,200 EA 1 $1,200 12" GATE VALVE AND BOX $2,000 EA 4 $8,000 FIRE HYDRANT ASSEMBLY $3,500 EA 3 $10,500 TRENCH SAFETY $1.00 LF 1,605 $1,605 TESTING (INCLUDING GEOTECH) $5.00 LF 1,605 $8,025 MISCELLANEOUS $96,240 PERCENT 10% $9,624 BONDS $96,240 PERCENT 2% $1,925 INSPECTION FEE $96,240 PERCENT 3% $2,887 DOMESTIC WATER TOTAL. SUMMARY SECTION COST SITE PREP/GRADING $30,303 DOMESTIC WATER $110,676 DESIGN AND ENGINEERING CONTINGENCIES 10% $14,097.90 15% $21,146.85 Phase 3 CIP - 17 The Woods at LindseyPlace Phase 4 Prepared by Bohler with notes for assumptions Location: Location: Anna, Texas Anna, Texas Lot Count Acreage Date 20S 8.09 1 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 8.09 $16,180 UNCLASSIFIED EXCAVATION $3.50 CY 23,000 $80,500 MISC. DEMOLITION $10,000 LS 5 $50,000 GEOTECH TESTING $0.25 CY 23,000 $5,750 SILT FENCE $1.25 LF 17,600 $22,000 INLET PROTECTION $30,000 LS 1 $30,000 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 TOTALISITE PREP/GRADING 0. ,9301 SANITARY SEWER UNIT $ UNIT QUANTITY TOTAL CONNECTION TO EXISTING $1,500 EA 2 $3,000 8" SDR -35 (< 12' DEEP) $37 LF 5,650 $209,050 4' DIA. MANHOLE $4,000 EA 27 $108,000 4" SEWER SERVICE $1,200 EA 205 $246,000 TRENCH SAFETY $1.50 LF 51650 $8,475 TESTING (INCLUDING GEOTECH) $5.00 LF 51650 $28,250 MISCELLANEOUS $602,775 PERCENT 10% $60,278 BONDS $602,775 PERCENT 2% $12,056 INSPECTION FEE $602,775 PERCENT 3% $18,083 TOTALISANITARY SEWER Phase 4 - 18 The Woods at LindseyPlace Phase 4 Prepared by Bohler with notes for assumptions Location: Location: Anna, Texas Anna, Texas Lot Count Acreage Date 205 8.09 1/4/2021 DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECT TO EXISTING $1,500 EA 4 $6,000 6" PVC (WITH FITTINGS) $24 LF 280 $6,720 8" PVC (WITH FITTINGS) $28 LF 61900 $193,200 8" GATE VALVE AND BOX $1,200 EA 34 $40,800 FIRE HYDRANT ASSEMBLY $3,500 EA 14 $49,000 1" WATER SERVICE (W/METER) $600 EA 205 $123,000 1.5" IRRIGATION SERVICE (W/METER) $800 EA 2 $1,600 TRENCH SAFETY $1.00 LF 71180 $7,180 TESTING (INCLUDING GEOTECH) $5.00 LF 71180 $35,900 MISCELLANEOUS $463,400 PERCENT 10% $46,340 BONDS $463,400 PERCENT 2% $9,268 INSPECTION FEE $463,400 PERCENT 3% $13,902 IDOMESTIC WATER TOTAL STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $1,381,177 PERCENT 45% $621,530 TESTING $621,530 PERCENT 3% $18,646 BONDS $621,530 PERCENT 2% $12,431 INSPECTION FEE $621,530 PERCENT 3% $18,646 ISTORM SEWER TOTAL PAVING UNIT $ UNIT QUANTITY TOTAL 6" REINFORCED CONC. PAVING (W/CURB) $36 SY 24,211 $871,600 6" SUBGRADE PREPARATION $4.50 SY 25,664 $115,487 HYDRATED LIME (36#/SY) $180 TON 462 $83,151 4" THICK SIDEWALK (5' WIDE) $5.00 SF 31000 $15,000 4" THICK SIDEWALK (EXTRA 12" FOR 6' WALK) $5.00 SF 250 $1,250 BARRIER FREE RAMP $2,500 EA 16 $40,000 TRAFFIC CONTROL $5,000 LS 1 $5,000 SIGNS (STREET BLADES/ STOP) $1,500 EA 26 $39,000 MISCELLANEOUS $1,170,488 PERCENT 10% $117,049 TESTING $11170,488 PERCENT 3% $35,115 BONDS $1,170,488 PERCENT 2% $23,410 INSPECTION FEE $11170,488 PERCENT 3% $35,115 TOTALIPAVING Phase 4 - 19 The Woods at Lindsey Place Phase 4 Prepared by Bohler with notes for assumptions BE JN: Location: Lot Count 205 TD202021 Anna, Texas Acreage 8.09 Date 2021 SUMMARY SECTION COST SITE PREP/GRADING $206,930 SANITARY SEWER $693,191 DOMESTIC WATER $532,910 STORM SEWER $671,253 PAVING $1,381,177 ISUBTOTAL $3,485o461 DESIGN AND ENGINEERING CONTINGENCIES 10% $348,546.10 15% $522,819.15 Phase 4 - 20 The Woods at Lindsey Place Phase 4 CIP - Throckmorton Paving & Drainage, Water Throckmorton BEJN: Location: Lot Count 0 TD202021 Anna, Texas Acreage 13.75 Date 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 13.75 $27,500 UNCLASSIFIED EXCAVATION $3.50 CY 391000 $136,500 MISC. DEMOLITION $20,000 LS 1 $20,000 SOD AND WATER $0.50 SF 299,400 $149,700 SILT FENCE $1.25 LF 11597 $1,996 INLET PROTECTION $30,000 LS 1 $30,000 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 TESTING $368,196PRECENT 3% $11,046 TOTALISITE PREP/GRADING DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECT TO EXISTING $1,000 EA 1 $1,000 6" PVC (WITH FITTINGS) $24 LF 240 $5,760 8" PVC (WITH FITTINGS) $28 LF 90 $2,520 12" PVC (WITH FITTINGS) $42 LF 41990 $209,580 8" GATE VALVE AND BOX $1,200 EA 3 $3,600 12" GATE VALVE AND BOX $2,000 EA 13 $26,000 FIRE HYDRANT ASSEMBLY $3,500 EA 12 $42,000 TRENCH SAFETY $1.00 LF 5,320 $5,320 TESTING (INCLUDING GEOTECH) $5.00 LF 51320 $26,600 MISCELLANEOUS $322,380 PERCENT 10% $32,238 BONDS $322,380 PERCENT 2% $6,448 INSPECTION FEE $322,380 1 PERCENT 3% $9,671 [DOMESTIC• Phase 4 CIP - 21 The Woods at LindseyPlace Phase 4 CIP - Throckmorton Paving & Drainage, Throckmorton Water Anna, Texas Location: Anna, Texas Location: Lot Count Acreage I Date 0 13.75 1 1/4/2021 STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $1,136,463 PERCENT 45% $511,408 TESTING $511,408 PERCENT 3% $15,342 BONDS $511,408 PERCENT 2% $10,228 INSPECTION FEE $511,408 PERCENT 3% $15,342 STORM• PAVING UNIT $ UNIT QUANTITY TOTAL 8" REINFORCED CONC. PAVING (W/CURB) $50 SY 13,861 $693,056 8" SUBGRADE PREPARATION $5.00 SY 14,693 $73,464 HYDRATED LIME (36#/SY) $180 TON 264 $47,605 4" THICK TRAIL (5' WIDE) $5.00 SF 14,850 $74,250 BARRIER FREE RAMP $2,500 EA 8 $20,000 TRAFFIC CONTROL $20,000 LS 1 $20,000 SIGNS (STREET BLADES / STOP) $1,500 EA 4 $6,000 PAVEMENT MARKINGS $30,000 LS 1 $30,000 MISCELLANEOUS $964,375 PERCENT 10% $96,438 TESTING $964,375 PERCENT 3% $28,931 BONDS $934,375 PERCENT 2% $18,688 INSPECTION FEE $934,375 PERCENT 39/c $28,031 TOTALIPAVING SUMMARY SECTION COST SITE PREP/GRADING $379,242 DOMESTIC WATER $370,737 STORM SEWER $552,320 PAVING $1,136,463 DESIGN AND ENGINEERING CONTINGENCIES 10% $243,876.20 15% $365,814.30 Phase 4 CIP - 22 The Woods at Lindsey Place Phase 5 Prepared by Bohler with notes for assumptions BEJN: Location: TD202021 Anna, Texas Lot Count Acreage Date 143 4.82 1/4/2021 SITE PREP/GRADING UNIT $ UNIT QUANTITY TOTAL CLEAR AND GRUB $2,000 ACRE 4.82 $9,640 UNCLASSIFIED EXCAVATION $3.50 CY 14,000 $49,000 MISC. DEMOLITION $10,000 LS 4 $40,000 GEOTECH TESTING $0.25 CY 14,000 $3,500 SILT FENCE $1.25 LF 81400 $10,500 INLET PROTECTION $20,000 LS 1 $20,000 CONSTRUCTION ENTRANCE $2,500 EA 1 $2,500 ISITE PREP/GRADING SANITARY SEWER UNIT $ UNIT QUANTITY TOTAL CONNECTION TO EXISTING $1,500 EA 3 $4,500 8" SDR -35 (< 12' DEEP) $37 LF 3,800 $140,600 4' DIA. MANHOLE $4,000 EA 14 $56,000 4" SEWER SERVICE $1,200 EA 143 $171,600 TRENCH SAFETY $1.50 LF 3,800 $5,700 TESTING (INCLUDING GEOTECH) $5.00 LF 3,800 $19,000 MISCELLANEOUS $397,400 PERCENT 10% $39,740 BONDS $397,400 PERCENT 2% $7,948 INSPECTION FEE $397,400 PERCENT 3% $11,922 Phase 5 - 23 The Woods at Lindsey Place Phase 5 Prepared by Bohler with notes for assumptions BEJN: Location: TD202021 Anna, Texas Lot Count Acreage Date 143 4.82 1/4/2021 DOMESTIC WATER UNIT $ UNIT QUANTITY TOTAL CONNECTTO EXISTING $1,500 EA 4 $6,000 6" PVC (WITH FITTINGS) $24 LF 180 $4,320 8" PVC (WITH FITTINGS) $28 LF 41200 $117,600 8" GATE VALVE AND BOX $1,200 EA 19 $22,800 FIRE HYDRANT ASSEMBLY $3,500 EA 9 $31,500 1" WATER SERVICE (W/METER) $600 EA 143 $85,800 1.5" IRRIGATION SERVICE (W/METER) $800 EA 0 $0 TRENCH SAFETY $1.00 LF 41380 $4,380 TESTING (INCLUDING GEOTECH) $5.00 LF 41380 $21,900 MISCELLANEOUS $294,300 PERCENT 10% $29,430 BONDS $294,300 PERCENT 2% $5,886 INSPECTION FEE $294,300 PERCENT 3% $8,829 IDOMESTIC WATER TOTAL STORM SEWER UNIT $ UNIT QUANTITY TOTAL DRAINAGE AS A PERCENT OF PAVING $833,363 PERCENT 45% $375,013 TESTING $375,013 PERCENT 3% $11,250 BONDS $375,013 PERCENT 2% $7,500 INSPECTION FEE $375,013 PERCENT 3% $11,250 STORM• PAVING UNIT $ UNIT QUANTITY TOTAL 6" REINFORCED CONC. PAVING (W/CURB) $36 SY 14,467 $520,800 6" SUBGRADE PREPARATION $4.50 SY 15,335 $69,006 HYDRATED LIME (36#/SY) $180 TON 276 $49,684 4" THICK SIDEWALK (5' WIDE) $5.00 SF 31800 $19,000 4" THICK SIDEWALK (EXTRA 12" FOR 6' WALK) $5.00 SF 11450 $7,250 BARRIER FREE RAMP $2,500 EA 10 $25,000 TRAFFIC CONTROL $5,000 LS 1 $5,000 SIGNS (STREET BLADES / STOP) $1,500 EA 7 $10,500 MISCELLANEOUS $706,240 PERCENT 10% $70,624 TESTING $706,240 PERCENT 3% $21,187 BONDS $706,240 PERCENT 2% $14,125 INSPECTION FEE $706,240 PERCENT 3% $21,187 Phase 5 - 24 The Woods at Lindsey Place Phase 5 Prepared by Bohler with notes for assumptions BE JN: Location: Lot Count TD202021 Anna, Texas Acreage 4.82 Date SUMMARY SECTION COST SITE PREP/GRADING $135,140 SANITARY SEWER $457,010 DOMESTIC WATER $338,445 STORM SEWER $405,013 PAVING $833,363 SUBTOTAL DESIGN AND ENGINEERING CONTINGENCIES 10% $216,897.10 15% $325,345.65 Phase 5 - 25