Loading...
HomeMy WebLinkAboutRes 2014-02-03 Updated Capital Improvement Plan for Water and Wastewater Impact FeesCITY OF ANNA, TEXAS RESOLUTION NO. 2014-02-03 A RESOLUTION OF THE CITY OF ANNA, TEXAS ADOPTING UPDATED LAND USE ASSUMPTIONS AND UPDATED CAPITAL IMPROVEMENT PLAN FOR PROPOSED ADOPTION OF WATER AND WASTEWATER IMPACT FEES. WHEREAS, The City has adopted Water and Wastewater Impact Fees in the Past; and WHEREAS, The City wishes to adopt updated Land Use Assumptions and Capital Improvements Plan and amendments to the Water and Wastewater Impact Fees, and WHEREAS, The State of Texas Local Government Code Section 395 has outlined the procedures for Updating Impact Fees, and WHEREAS, the Impact Advisory Committee has review the Land Use Assumptions and Capital Improvements Plan and made recommendations; now therefore NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Land Use Assumptions. The Updated Land Use Assumptions are adopted Section 3. Capital Improvements. The Capital Improvement Plans for Water and Wastewater are adopted. Section 4. Water and Wastewater Rates Set The City Council set the Water Impact Fee per service unit equivalent at $2,000. The City Council set the Wastewater Impact Fee per service unit equivalent at $2,000. PASSED AND APPROVED by the City Council of the City of Anna, Texas, on this 25th day of February, 2014. ATTEST: APPROVED: N ha Wilkison, City Secretary Mayor, Mike Crist Res. 2014-02-03 Update Land Use Assumptions & C-ap4aelmp em t Plap 1 02-25-14 r d luI l III l Ni! WATER AND WASTEWATER IMPACT FEE UPDATE 4 2024 Prepared For ww CITY OF ANNA, TEXAS i -OFF, HENDRICKS & CARTER, PROFESSIONAL O ENGINEERS IVALLAS, TEXAS January 2014 Texas Firm F526 BI OFF, HENDRICKS & CARTER, L.L.P. PROFESSIONAL ENGINEERS 11910 Greenville Ave., Suite 600 JOHN W. BIRKHOFF, P,E, GARY C. HENDRICKS, P,E. JOE R. CARTER, RE, PAUL A, CARLINE, P,E, MATT HICKEY, P.R. ANDREW MATA, JR., RE. JOSEPH T, GRAJEWSKI, III, P.E. DEREK B. CHANEY, P,E. Mr. Philip Sanders City Manager City of Anna, Texas 11 I North Powell Parkway Anna, Texas 75094 Dallas, Texas 75243 Fax (214) 461-8390 Re: Water and Wastewater Impact Fee Update 2014-2024 Dear Mr. Sanders: January 24, 2014 Phone(214)361-7900 This report study presents the results of the City of Anna Water and Wastewater Impact Fee Update for the planning years 2014 through 2024. This report includes discussions on land use assumptions (prepared by the City), the impact fee Capital Improvements Plan, and Calculated Maximum Impact Fees by meter size. The calculated maximum fees per service unit (for a 3/4 -inch water meter) are as follows: Maximum Water Impact Fee per Service Unit .................................. $4,674 Maximum Wastewater Impact Fee per Service Unit ........................ $4,610 We have enjoyed working with the City on this important study and are available to discuss the fmdings and conclusions of this impact fee update further at your convenience. We look forward to our continued working relationship with you and the City of Anna. oil 0 00 Ap OR GARY C. HENDRICKS pc65226�a wwOf $ik?/O®AL- :, CRAIG M. KERKHOFF ,.... .... l n 106102 2r N $c,��`'r4' Sincerely yours, C. Craig M. Kerkhof£, P.E. Torras A►nerican Public Works Association 2012 AWardee Environmental Project of the Year $2 Million — Fyke Road Lift Station Replacement j:\c1er1ca1\aaaa\2012.152 w&ww impact fee update 2012\reports\02-1e1ter doex Texas Firm F526 CITY OF ANNA WATER AND WASTEWATER IMPACT FEE UPDATE TABLE OF CONTENTS Patze No. I. INTRODUCTION ................... ................. .................... ...................... .............. 1 H. GLOSSARY .......... ..................................................... .......... 3 III. LAND USE ASSUMPTIONS (Provided by City of Anna) ................ ............ ..............I........1 7 IV. DEFINITION OF A SERVICE UNIT — WATER AND WASTEWATER ............................... 7 • Table No. 2 — LUE for Various Types & Sizes of Water Meter V. CALCULATION OF WATER & WASTEWATER —LIVING UNIT EQUIVALENTS ,.......... 9 • Table No. 3 — 2014-2024 Water Living Unit Equivalents by Meter Size • Table No. 4 — 2014-2024 Wastewater Living Unit Equivalents by Meter Size VI. WATER DISTRIBUTION SYSTEM ......... .................................................... I......................... 10 A. Existing Pump Stations, Ground Storage Reservoirs & Elevated Storage Tanks ............. 11 • Table No. 5 — Water Distribution System — Existing Facilities B. Distribution Lines.............................................................................................................. 11 C. Water Supply................................................................................... ............. ........ ..... 12 D. Water Distribution System Capital Improvement Projects ................................................ 12 • Figure No. 1 • Table No. 6 — 10 -Year Capital Improvement Plan E. Utility Capacity............................................................................................................... 15 • Table No. 7 — Sununary of Eligible Capital Cost & Utilized Capacity Cost • Table No. 8 — Existing Water Lines • Table No. 9 — Proposed Water Line • Table No. 10 —Proposed Facilities jAcWcahanua\2012-152 w&ww impact Fee update 2012\rcports\03-iudcx docz - T - Pie. No. VII. WASTEWATER COLLECTION SYSTEM A. General .............................................................................................................................. 23 B. Collection Lines ............................................................................................................... 23 C, Capital Improvement Program....................................................<....,..,......,...............,..,...,. 25 • Figure No. 2 • Table No. 1 I — 10 -Year C-apital Improvcment'Plan D. Utility Capacity..............................<...........................I................ ............................. 28 • Table No. 12 — Summary of Eligible Capital Cost & Utilized Capacity Cost • Table No. 13 —:Existing Wastewater Facilities • "fable No. 14 — Proposed CIP — Wastewater Collection Limes • Table No. 15 — Proposed CIP — Wastewater Facilities VIII. CALCULATION OF MAXIMUM IMPACT FEES — WATER AND WASTEWATER SYSTEM............................................................................. 34 • Table No. 16 —.Allowable. Maximum Fee Per LU:E and Per Meter Size &Type APPENDIX A: CITY OF ANNA'S LAND USE ASSUMPTIONS FOR IMPACT FEES jt1,daia &,wu 1(J 11-152 wftw Smjmci fee updmo - U - Birkhoff, Hendricks & Carter, L.L,P, CITY OF ANNA WATER AND WASTEWATER IMPACT FEE UPDATE I. INTRODUCTION The City of Arora retained the services of Birkhoff, Hendricks and Carter, L,L.P for the purpose of updating the impact fees for the water distribution system and the wastewater collection system. These impact fees are required for funding the construction of specific capital improvement projects to serve new development. The table below shows the previous impact fees and impact fee updates calculated and imposed by the City: Since the 2008 update of the Impact Fee, the City of Anna has expanded its water and sewer service. The Water Distribution System Master Plan and Wastewater Collection Master Plan were further prepared in September 2013 by Birkhoff, Hendricks & Carter, L.L.P. and are now consistent with the City's Comprehensive Plan. In accordance with the requirements of Chapter 395.052 of the Local Government Code, this report updates the City of Anna's Land Use Assumptions, Water Capital Improvement Plan and Wastewater Capital Improvement Plan. Chapter 395, of the Local Govermnent Code is an act that provides guidelines for financing capital improvements required by new development in municipalities, counties, and certain other local governments. Based on the most current Master Plan documents for the Water Distribution and Wastewater Collection Systems; 10 -year Capital Improvement Plans were developed to reflect the infrastructure needs in that time period. The accompanying land use plan (Exhibit A) and associated population growth assumptions were also documented based on work by the City Planning Department. From these documents a maximum impact fee is calculated. jAclerickanna\2012-152 w&m, impact Pee update 2012\reports\04-report,docx - 1 - W&WW Impact Fee Update 2014-2024 2008 Calculated Maximum Fee Fees Imposed Water $2,712.50 $2,000 Wastewater $2,643.50 $2,000 Since the 2008 update of the Impact Fee, the City of Anna has expanded its water and sewer service. The Water Distribution System Master Plan and Wastewater Collection Master Plan were further prepared in September 2013 by Birkhoff, Hendricks & Carter, L.L.P. and are now consistent with the City's Comprehensive Plan. In accordance with the requirements of Chapter 395.052 of the Local Government Code, this report updates the City of Anna's Land Use Assumptions, Water Capital Improvement Plan and Wastewater Capital Improvement Plan. Chapter 395, of the Local Govermnent Code is an act that provides guidelines for financing capital improvements required by new development in municipalities, counties, and certain other local governments. Based on the most current Master Plan documents for the Water Distribution and Wastewater Collection Systems; 10 -year Capital Improvement Plans were developed to reflect the infrastructure needs in that time period. The accompanying land use plan (Exhibit A) and associated population growth assumptions were also documented based on work by the City Planning Department. From these documents a maximum impact fee is calculated. jAclerickanna\2012-152 w&m, impact Pee update 2012\reports\04-report,docx - 1 - W&WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P. The Act allows the maximum impact fee to be charged if revenues from future ad valorem taxes, and water and sewer bills are included as a credit in the analysis. If not, the Act allows the maximum fee to be set at 50% of the calculated maximum fee. The following items were included in the impact fee calculation: A. The cost of the new infrastructure that is to be paid by the City, including engineering, property acquisition and construction cost. B. Existing excess capacity in lines and facilities that will serve future growth and which were paid for in whole or part by the City. C. Engineering and quality control fees for construction projects. D. Interest and other finance charges on bonds issued by the City to cover its portion of the cost. E. Planning Cost. The engineering analysis portion of the Water and Wastewater Impact Fee review determines utilized capacity cost of the major water distribution and wastewater collection facilities between the year 2014 and the year 2024. Facilities in this analysis include, water pump stations, water storage tanks, water transmission lines, water distribution lines, wastewater lift stations, wastewater collection lines, the Slayter Creel-, wastewater treatment plant and the regional wastewater systems. The study period is a ten-year period with 2014 as the base year. The impact fee calculation for the water and wastewater systems is based on land uses provided by the City's Planning Department. The equivalency factors utilized in this analysis conform to the latest American Water Works Association Standards (C700 - C703). jAc1cdcah=a\2012-152 w&vnv impact fee update 2012\repor1s104-repert,docx - 2- W& WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, II. GLOSSARY 1. Advisory Cominittee means the capital improvements advisory committee established by the City for purposes of reviewing and making recommendations to the City Council on adoption and amendment of the City's impact fee program, 2. Area -related facility means a capital improvement or facility expansion which is designated in the impact fee capital improvements plan and which is not a site -related facility. Area -related facility may include a capital improvement which is located off-site, or within or on the perimeter of the development site. 3. Assessment means the determination of the amount of the maximum impact fee per service unit which can be imposed on new development. 4. Capital improvement means either a water facility or a wastewater facility, with a life expectancy of three or more years, to be owned and operated by or on behalf of the City. 5. City means the City of Anna, Texas. 6. Credit means the amount of the reduction of an impact fee due, determined under this ordinance or pursuant to administrative guidelines, that is equal to the value of area - related facilities provided by a property owner pursuant to the City's subdivision or zoning regulations or requirements, for the same type of facility. 7. Facility expansion means either a water facility expansion or a sewer facility expansion. 8. Final plat approval means the point at which the applicant has complied with all conditions of approval in accordance with the City's subdivision regulations, and the plat has been approved for filing with Collin County. 9. Impact fee means either a fee for water facilities or a fee for wastewater facilities, imposed on new development by the City pursuant to Chapter 395 of the Texas Local Government Code in order to generate revenue to fund or recoup the costs of capital improvements or facility expansion necessitated by and attributable to such new development. Impact fees do not include the dedication of rights-of-way or easements for such facilities, or the construction of such improvements, imposed pursuant to the City's zoning or subdivision regulations. jAcledcd,anna\2012-152 w&m impact fee update 2012Uepods\04-report,docx - 3 - W&WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, 10. Impact fee capital improvements plan means either a water capital improvements plan or a wastewater capital improvements plan, adopted or revised pursuant to the impact fee regulations. 11. Land use assumptions means the projections of population and growth, and associated changes in land uses, densities and intensities over at least a ten-year period, as adopted by the City and as may be amended from time to time, upon which the capital improvements plans are based. 12. Land use equivalency table means a table converting the demands for capital improvements generated by various land uses to numbers of service units, as may be amended from time to time. 13. New development means the subdivision of land; the construction, reconstruction, redevelopment, conversion, structural alteration, relocation, or enlargement of any structure; or any use or extension of the use of land; any of which increases the number of service units. 14. Plat has the meaning given the term in the City's subdivision regulations. Plat includes replat. 15. Plattin has the meaning given the term in the City's subdivision regulations. Platting includes replatting. 16. Property owner has the meaning given the term in the City's subdivision regulations. Property owner includes the developer for a new development. 17. Recoupment means the imposition of an impact fee to reimburse the City for capital improvements which the City had previously oversized to serve new development. 18. Service area means either a water service area or wastewater benefit area within the City, within which impact fees for capital improvements or facility expansion will be collected for new development occurring within such area, and within which fees so collected will be expended for those types of improvements or expansions identified in the type of capital improvements plan applicable to the service area, jAcletical\anna\2012-152 w&vnv impact fee update 2012Veporta\04reporl_docx - 4 - IMWW IMpact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P. 19. Service unit means the applicable standard units of measure shown on the land use equivalency table in the Impact Fees Capital Improvements Plan which can be converted to water meter equivalents, for water or for wastewater facilities, which selves as the standardized measure of consumption, use or generation attributable to the new unit of development. 20. Site -related facility means an improvement or facility which is for the primary use or benefit of a new development, and/or which is for the primary purpose of safe and adequate provision of water or wastewater facilities to serve the new development, and which is not included in the impact fees capital improvements plan and for which the property owner is solely responsible under subdivision or other applicable development regulations. 21. Utility connection means installation of a water meter for connecting a new development to the City's water system, or connection to the City's wastewater system. 22. Wastewater facility means a wastewater interceptor or main, lift station or other facility included within and comprising an integral component of the City's collection system for wastewater, Wastewater facility includes land, easements or structure associated with such facilities. Wastewater facility excludes site -related facilities. 23. Wastewater facility expansion means the expansion of the capacity of any existing wastewater improvement for the purpose of serving new development, but does not include the repair, maintenance, modernization, or expansion of an existing sewer facility to serve existing development. 24. Wastewater capital improvements plan means the adopted plan, as may be amended from time to time, which identifies the wastewater facilities or wastewater expansions and their associated costs which are necessitated by and which are attributable to new development, for a period not to exceed 10 years. 25. Water facility means a water interceptor or main, pump station, storage tank or other facility included within and comprising an integral component of the City's water storage or distribution system. Water facility includes land, easements or structures associated with such facilities. Water facility excludes site -related facilities. j:\c1crica1\atma\2012-152 w&ww impact fee update 2012\reports\04-report.docx - 5 - W&j' bnpact Fee Update 2014-2024 Blrk4pfj, Hendricks & Cutter, G, ,P, 26. Water facility expansion means the expansion of the capacity of any existing water facility for the purpose of serving new development, but does not include the repair, maintenance, modernization, .or expansion of in existing water improvement to serve existing development. 27. Water capital improvements plan means the adopted plan, as may be amended from tin -ie to time, which identifies the water facilities or water expulsions and flied' associated costs which are necessitated by and which are attributable to new development, for a period not to exceed 10 years. 28. Water meter means a device for rneasuring the flow of water to a development, whether for'domestic or for irrigationpurposes. 1�xkr9cnPruuiyt2tlt2-I5 w& w hnpul tee iiMmc2)12ke}xd'x10d rzpad.dnes - G - 111& Of Impacl J`ee Update 2014-2024 Birkhoff, Hendricks & Carter, L,LY, III. LAND USE ASSUMPTIONS (BY THE CITY OFA TNA) The City of Anna Planning Department prepared the Land Use Assumptions for this impact fee update. The separate impact fee Land Use Assumption report is enclosed in Appendix A for reference. IV. DEFINITION OF A SERVICE UNIT — WATER AND WASTEWATER Chapter 395 of the Local Government Code requires that impact fees be based on a defined service unit. A "service unit" means a standardized measure of consumption, use generation, or discharge attributable to an individual unit of development calculated in accordance with generally accepted engineering or planning standards. This update defines a water and wastewater service unit to be a 3/4 -inch water meter and has referred to this service unit as a Single Family Living Unit Equivalent (SFLUE). The SFLUE is based on the continuous duty capacity of a 3/4 -inch water meter. This is the typical meter used for a single family detached dwelling, and therefore is considered to be equivalent to one "living unit". Other meter sizes can be compared to the 3/4 -inch meter through a ratio of water flows as published by the American Water Works Association as shown in Table No. 2 below. This same ratio is then used to determine the proportional water and wastewater impact fee amount for each water meter size. jAclerical\anna\2012-152 w&ww impact fee update2012\reports\04-report.docx - 7 - W&WImpact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P. TABLE NO. 2 LIVING UNIT EQUIVALENCIES FOR VARIOUS TYPES AND SIZES OF WATER METERS t°) Source: A9,7f'A Standard C700 (1995) - C703 (1996) j:klmical\anna\2012-152 w&%vu impact fee update 2012\reports\04-teport,docs-8- W&WW-Impact Fee Update 2014-2024 Continuous Duty Meter Type Meter Size Maximum Rate (gpm (a) Ratio to 3/" Meter Simple 3/" 15 1.0 Simple 1" 25 1.7 Simple_ 1 %2" 50 3.3 Simple 2" 80 5.3 Compound 2" 80 5.3 Turbine 2" 100 6.7 Compound 3" 160 10.7 Turbine 3" 240 16.0 Compound 4" 250 16.7 Turbine 4" 420 28.0 Compound 6" 500 33.3 Turbine 6" 920 61.3 Compound 8" 800 53.3 Turbine 8" 1,600 106.7 Compound 10" 2,300 153.3 Turbine 10" 2,500 166.7 Turbine 1 12" 3,300 220.0 t°) Source: A9,7f'A Standard C700 (1995) - C703 (1996) j:klmical\anna\2012-152 w&%vu impact fee update 2012\reports\04-teport,docs-8- W&WW-Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, V. CALCULATION OF WATER & WASTEWATER - LIVING UNIT EQUIVALENTS The City of Anna provided the existing water meter count by size category as of January 2014. In total, there are 3,870 water meters serving the existing population of 10,300 residents and business. Table No. 3 shows the number of existing water meters, the living unit equivalent factor and the total number of living unit equivalents for water accounts. Similarly, the City has provided a count of wastewater accounts as of December 2013. Serving the 10,300 residents, there are 3,279 accounts. Table No. 4 illustrates the existing account and SFLUE's. Using the growth rate provided in the Land Use Assumptions prepared by the City's Planning Department, water meters and wastewater accounts were extrapolated to the year 2024. The City's Planning Department projects the residential and non-residential to grow at the same rate. Living unit equivalents were then applied to the water meters and wastewater accounts for 2014 and 2024 resulting in a total number of living units. The difference in the total number of 2014 and 2024 living units results in the new living unit equivalents during the impact fee period. The calculation of living unit equivalents is summarized in Table No. 3 and Table No. 4. 2014 — 2024 WATER LIVING UNIT EQUIVALENTS BY METER SIZE jAcIcHcabarma\2012-152 w&yw impact tee update 2012\reports\04-r"rt.docx .9— W&WW Impact Fee Update 2014-2024 2014 2024 New Meter Size Number of Water Meters Living Unit Equivalent Ratio for 314" Used Total Number of Living Units Number of Water Meters Living Unit Equivalent Ratio for 3(4" Used Total Number of Living Units Living Units During Impact Fee Period '4 3,768 1.0 3,768 7,071 1.0 7,071 3,303 1" 51 1.7 85 96 1.7 160 75 1%" 5 3.3 17 9 3.3 31 15 2" 41 6.7 273 77 6.7 513 240 3" 1 16.0 16 2 16.0 30 14 4" 3 28.0 84 6 28.0 158 74 6" 1 1 61.3 61 2 61.3 115 L 54 Totals:11 3,870 1 1 4,304 7,262 8,077 3,773 jAcIcHcabarma\2012-152 w&yw impact tee update 2012\reports\04-r"rt.docx .9— W&WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter L.L.P, 2014 — 2024 WASTEWATER LIVING UNIT EQUIVALENTS BY WATER METER SIZE VI. WATER DISTRIBUTION SYSTEM Computer models from the 2013 Water Distribution Master Plan were used to determine capacity and utilization of the existing facilities. The land areas follow closely to the construction of major facilities in the system as outlined in Figure No. 1. These facilities include major distribution lines, pump stations, and ground storage reservoirs. The utilized capacity was based on the existing system and ten-year growth system demands included in the 2013 Master Plan Report. j:k1eric;d\mma\2012-152 w&Nwi impact fee update 2012\repmrts\04-repoIt.docx _10- W&W bnpact twee Update 2014-2024 2014 2024 New Meter Size Number of Water Meters LUE Ratio for 3/4" Meter Used Total Number of Living Units Number of Water Meters LUE Ratio for 3/4" Meter Used Total Number of Living Units LUE's During Impact Fee Period 3/" 3,230 1.0 3,230 6,061 1.0. 6,061 2,831 1" 21 1.7 35 39 1.7 66 31 1 %" 4 3.3 13 8 3.3 25 12 2" 20 6.7 133 30 6.7 250 67 3" 1 16.0 16 2 16.0 62 16 4" 3 28.0 84 4 28.0 158 28 Totals 3,279 3,512 6,144 6,496 2,984 VI. WATER DISTRIBUTION SYSTEM Computer models from the 2013 Water Distribution Master Plan were used to determine capacity and utilization of the existing facilities. The land areas follow closely to the construction of major facilities in the system as outlined in Figure No. 1. These facilities include major distribution lines, pump stations, and ground storage reservoirs. The utilized capacity was based on the existing system and ten-year growth system demands included in the 2013 Master Plan Report. j:k1eric;d\mma\2012-152 w&Nwi impact fee update 2012\repmrts\04-repoIt.docx _10- W&W bnpact twee Update 2014-2024 Birkhoff, Hendricks & Carter, G.L.P. A. Existing Pnnip Stations, Ground Storage Reservoirs & Elevated Storage Tanks As of 2014, the City of Anna has constructed the facilities listed in Table No. 5. TABLE NO. 5 WATER DISTRIBUTION SYSTEM — EXISTING FACILITIES Facility Capacity Status West Well Pump Station, Ground Storage Reservoir, & Elevated Storage Tank 0.30 MG On -Line North Well Pump Station & Ground Storage Reservoir 0.30 MG On -Line South Well Pump Station & Ground Storage Reservoir 0,30 MG On -Line South Grayson Ground Water Wells 0.91 MGD On -Line South Take Point 4 MGD Off -Line The pump station and ground storage facilities were analyzed with the maximum daily demand, while elevated storage acts dynamically and therefore was analyzed utilizing the difference between the Maximum Hourly Demand and the Maximum Daily Demand. B. Distribution Lines The distribution lines consist of all lines within the service area planning boundary supplying water to customers in the City of Anna. Lines vary in size from 2 -inch service connections to 18 -inch transmission lines. Normally, a city participates in the construction of water system infrastructure of 12 inches or greater diameter. However, there have been cases in Anna where the City either contracted for new 8 -inch or 10 -inch waterlines to promote development or to support re -development. Careful scrutiny has been given to the distribution system lines that are eligible for capital recovery and in particular, inclusion into the impact fee calculation, jAclerical%mma\2012-152 w&mv bripact fee update 2012\reports\04-report doex - 1 1 - W&WImpact Fee Update 2014-2024 Birkhaf}; Hendricks & Carter, L.L.P. The cost of a waterline includes construction cost, appurtenances (water valves, fire hydrants, taps and the like), utility relocations, purchase of easements and engineering costs. Financing cost over a 20 -year term is included for each project with a 5% annual interest rate. Unit cost for proposed capital improvement water lines 12 inches and larger in diameter were classified as City -initiated water lines and include the full cost of the proposed facility. In some instances, and indicated on the CIP exhibit, water lines will be initiated by the developer. In these cases, the developer will be responsible for the cost of the first 8 -inches and the City will be responsible for the cost associated to construct the line to the size shown on the CIP exhibit. C. Water Supply The City of Anna has 5 ground water wells that produce approximately 2.6 MGD. Additionally, the Collin -Grayson Municipal Alliance (CGMA) supplies treated surface water to the City of Anna, via NTMWD and the City of McKinney. D. Water Distribution System Capital Improvement Projects In order to meet the demands of the anticipated growth over the next 10 -years to 2024, as provided in the Land Use Assumption, certain water distribution system improvements are required. Figure No. 1 shows the recommended system improvements and Table No. 6 itemizes each project and the project cost. These recommended improvements form the basis for the Water System Impact Fee Calculation. Actual capital cost, including construction, engineering and easements of the various elements of the existing water distribution system, was utilized where the information was known. The existing cost of facilities was determined from records provided by the City of Anna. Where actual costs are not known, an average cost in 2014 dollars has been calculated. The average unit cost is from a limited survey of projects, which have been bid recently, plus an estimated cost for engineering and easements. j:\clericaltanna\2012-I52 w&ww hnpnct fee update 2012\reports\O4-report,docx - 12 - W&WW bnpact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, FIGURE I WATER DISTRIBUTION SYSTEM jAclerical'ianna\2012-152 %v&%%iv impact fee update 2012\reports\04-report docx - 13 - TUffqVImpact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, TABLE NO. 6 10 -YEAR WATER DISTRIBUTION SYSTEM CAPITAL IMPROVEMENT PLAN Water Lines Year Project Size Total Capital Developer Cost (l) Participation Debt Service (2) Total Project Cost Water Line #1 12" $ 2,344,650 $ 1,230,941 $ 3,575,591 Water Line#2 12" $ 1,521,400 X $ 798,735 $ 2,320,135 Water Line#3 12" $ 828,650 X $ 435,041 $ 1,263,691 Water Line #4 12" $ 632,750 X $ 332,194 $ 964,944 Water Line #5 12" $ 1,618,950 $ 849,949 $ 2,468,899 Water Line#6 24" $ 1,_880,800 $ 987,420 $ 2,868,220 Water Lune #7 12" $ 112,500 X $ 59,063 $ 171,563 Water Line #8 12", 24" $ 1,802,150 X $ 946,129 $ 2,748,279 Water Line #9 12" $ 1,604,950 $ 842,599 $ 2,447,549 Water Line#10 12" $ 170,000 X $ 89,250 $ 259,250 Water Line#11 12" $ 1,338,750 $ 702,844 $ 2,041,594 Water Line#12 12" $ 161,200 $ 84,630 $ 245,830 Water Line #13 12" $ 977,050 $ 512,951 $ 1,490,001 Water Line #14 8", 12", 16" $ 2,149,100 $ 1,128,279 $ 3,277,379 Water Line#15 12" 16" $ 2,105,080 $ 1,105,167 $ 3,210,247 Water Line #16 12" $ 776,800 X $ 407,820 $ 1,184,620 Water Line #17 12" $ 433,400 X $ 227,535 $ 660,935 Water Line #18 12111611 $ 762,730 X $ 400,433 $ 1,163,163 Water Line #19 12" $ 255,000 $ 133,875 $ 388,875 Water Line 820 12" $ 2,623,200 $ 1,377,180 $ 4,000,380 Water Lule#21 12" $ 1,059,800 X $ 556,396 $ 1,616,196 Water Line #22 12" $ 996,000 $ 522,900 $ 1,518,900 Water Lune #23 12" $ 4,209,450 $ 2,209,961 $ 6,419,411 Subtotal: Water Lines $ 30,364,360 $15,941,292 $ 46,305,652 jAc1ericallsnna\2012-152 w&%"v impact fee update 2012\reports\04-repurt.ducx -14- W&W lmpaet Fee Update 2014-2024 Bitkhoff, Hendricks & Carter, L.L.R, TABLE NO. 6 (CONTINUED) 10 -YEAR CAPITAL IMPROVEMENT PLAN Facilities Pl tin w F..xnenses Year Proiect Capacity Total Capital Cost (1) Total Water SysteinMaster Plan$ 50,000 Total Water b act Fee $ 35,000 $ - $ 35,000 Capital Developer Debt Project Year Project Capacity Cost (1) Participation Service (2) Cost CGMA Water Supply 1.0 MGD $ 100,000 $ 52,500 $ 152,500 Hackberry EST 0.75 MG $ 2,280,000 $ 1,197,000 $ 3,477,000 1 MG EST 1.0 MGD $ 2,750,000 $ 1,443,750 $ 4,193,750 Initiate South Pump Station $ 500,000 $ 262,500 $ 762,500 Subtotal: $ 5,630,000 $ 2,955,750 $ 8,585,750 Pl tin w F..xnenses Year Proiect Capacity Total Capital Cost (1) Total De -,,eloper Debt Project Participation Service(2) Cost Water SysteinMaster Plan$ 50,000 $ - $ 50,000 Water b act Fee $ 35,000 $ - $ 35,000 Subtotal, $ —85—,0001 $ 85,000 GRAND TOTAL: $ 36,079,360 1 $18,897,042 $ 54,976,402 E. Utilized Capacity Utilized capacity for the water distribution system was based on the maximum daily demands and maximum hourly demands. Pump station capacity is generally based on the maximum daily system demand while transmission and distribution facilities are sized based on either the maximum hourly demand or the minimum hourly demand, whichever demand is greater for a particular water line. The percent utilized capacity was then calculated for year 2014 based on the build -out capacity. The utilized capacity during the Impact Fee period is the difference between the year 2024 and the year 2014 capacity. Table No. 7 below summarizes the project cost and utilized cost over the impact fee period of 2014 – 2024 for each element of the Water Distribution System. The utilized capacity for each water distribution facility, both existing and proposed, is presented in detail in Impact Fee Capacity Calculation Table No. 8 through Table No. 10. jAdericuMnna\2012-152 w&mv impact Fee update 2012\repnrts\04-report.du" -15- W&Wj bnpaet Fee Update 2014-2024 Birkhoff,' Hendricks & Carter, L.L.P. TABLE NO. 7 SUMMARY OF ELIGIBLE CAPITAL COST & UTILIZED CAPACITY COST Water System Total 20 -Year Project Cost ($) Utilized Capacity Duruig Fee Period ($) Existing Water Facilities $16,572,988 $9,245,510 Planning Expenses $85,000 $85,000 Existing Water System Subtotal: $16,657,988 $9,330,510 Proposed Water Lines $46,305,652 $19,447,871 Proposed Water Facilities $8,585,750 $6,488,875 Proposed Water System Subtotal: $54,891,402 $253936,746 TOTAL: $71,549,390 $35,267,256 jAckTicahanna12012-152 w&ww impact fee update 20121reports104-report,decx -16- PV& WImpact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, TABLE NO. 8 EXISTING - WATER LINE FACILITIES jAclericahamta\2012-152w&wwimpactRe update 2012\reports\04-report,docx -17- W&WWlmpactFee Update 2014-2024 a rn K sv w ,fir ca w rV O CO M N N &9 69 69 69 fA V] b9 69 N C C1 � ti9 b4 W %A HI fn Es9 U C CO np h h H � to a w N N N fY CJ OO OO O U G y 63 t U A d W N N19 O OO O N O >� C t A N Ci .f H b9 w 41 U 4Y !A frit\ 9j V] f�li H�1 6�9 - r L p U 1... .. O o o 't0^ • q V U ti f� n h t� � O o O � Gam+ Oo ry M � ,5 !/} � f--1 Ff3 b9 69 69 Vi fA Vi Vi V3 try faq ro N N r4ad G' C7 o � •i}. '� � o �U o '4 �� _O 'V '�j 0 0 od o`'� 00 oa to F tl bit n� tt C N N N' rl N Cl N N y N N N N W N N (� i✓ a o .n C W to op CA`J o0 A o o o rn � ,u � � � � � v .-• F .- 0 0 w rain a n a a F Y Y e k' e u E '� o Gn jAclericahamta\2012-152w&wwimpactRe update 2012\reports\04-report,docx -17- W&WWlmpactFee Update 2014-2024 Birkhof/,' Hendricks & Carter, L.L.P, j:\cleticahama\2012-152 w&%vw impact fee update 2012\reporls\04-report.docx - 1 S - W&WW Impact Fee Update 2014-2024 u n o n � r H9 o Hi cl � o 64 o in n N c><i o voi m o o o �i o ry o0 .n 00 �1 v o N tl n N M N h V) O O nt U) rt o bO9 M �OJ3 64 to C � Va O O O g o O O O 6 O O 4 O 0 O 0 O 0 O 0 O 0 0 0 a o o o ry O vi O .n o .-, rn rn .n ry v1 vi O G O O O O 0 0 0 0 0 0 o v� Irl •ri', C 69 Vi o n o � c Vj ti9 69 � �^ � N EA �o��� F9 rI' � O FA O 49 �. � H y itn O [� rn r tq c r a to rn 6v rn Fn t�i "` o fa`» c 0 0 4s,: C Cs. F �i iv '� s5 ia. G � q L � � G •i• y.d i=.e C d G:. C •d 1. p -I t!) tf7 �••� o c o FR o0 00 in w oo' c o y o o {/i o0 0 'n +H � i•d ice+ VJ Ei .� o o ry Cl � N n! N N N _..._.,.,........,.._.. N n GL CYC �� O d! `� F •` b C �� C �a! cO.1 � Ot .� � O O � � rC14 A P Cl O O d VOl VIo O o c r� � h u y ✓ y .• P r :c t j:\cleticahama\2012-152 w&%vw impact fee update 2012\reporls\04-report.docx - 1 S - W&WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, Table 9 Proposed WATER — Utilized Capacity jAcIeTicahamm\2012-152 w&Nvw impact fm update 2012\rcpcfIs\04-iepw-t,docx - 19 - WOMI-Impact Fee Update 2014-2024 & & 2 2 2 a t 2 g t; jE _R CT 17� C� 4 5 A 00 aL 01 N �2 I=t N R —L—L—A jAcIeTicahamm\2012-152 w&Nvw impact fm update 2012\rcpcfIs\04-iepw-t,docx - 19 - WOMI-Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, jAcleeicahauna\2012.152 w&ttnv impact Fee update 2012uepmts\04-report,docx -20- w&WImpact Fee Upetate 2014-2024 ti vo d .m p 0 rh o vs ♦7 v! M M n tH V U w es og e` O O O p o 0 0 0 0 o p o o O voi in � m G .• s g, No V'' ro m. dy m M, ri N O� V1 � 69 b m 1 r w K N 'Ir K s9 rNfl 1 U b C L C L C L C L L L L N V 48+ +�+ lH Y i ice+ x x s x 'C V P I fl V O. J a] S•1 ? il .] A A O ? ❑ A 7 Q � jAcleeicahauna\2012.152 w&ttnv impact Fee update 2012uepmts\04-report,docx -20- w&WImpact Fee Upetate 2014-2024 Birkhoff Hendricks & Carler, L.L.P, jAclericaKanna\2012-152 tv&ww unpact fee update 2012\reparts\04-report,docx -21 - M j3 Impact Fee Update 2014-2024 o� u~s n o W o e l o c W cA � H fR 0 0 o 0 n n v w v ,-• v� .� v 0 0 0 0 0 o o a o 0 o w 6 "I o �� .. ; in P rn n VNi o o �i a q _ r in m - r N (A N n N M �-i bt N Vni �N Cj TM GOi pp � M O O (~ w En 0 0 0 a n o C, o h1 0 oo C In o a a a a a ;� a d d 12 v v l a '/. X X v�� N CI N rl MN w vi cit rn rn m vi jAclericaKanna\2012-152 tv&ww unpact fee update 2012\reparts\04-report,docx -21 - M j3 Impact Fee Update 2014-2024 a Table 10 Proposed WATER — Facilities Birkhoff, Hendricks & Carter, L.L.P, j:\c1cdcaRamm\2012-152 w&cxvw impact fee update 2012\rcports\04-report,docx -22- TV&T'VI'V Impact Fee Update 2014-2024 00 C rn o o A � � voi voi o o w x � voi r d 7 vii In n r rn a o] e 00 N t�V b 09 ,a 0 N V, 69 vos 0 ------------ vos 6'� Vi u U A d k" N Q 0 N o m d o 0 O r 0 h 0 O a w � � q w L L V O O O O ...+ N __o - o0 0 0 o 0 0 r 0 0 ai u� o y --. N 4 ? p A U W Gn - F C O t] C Q 9 h V1 O A c Ci h Vt C o t� r O n V1� to V1 tr, 0 u N U (Al CO V) U �„ o N rA r !y M °tAI " 3 En U � O N N O O N N py N O N Q O � cd In ✓ E 0 0 0 0 a 0 ]n XI Birkhoff, Hendricks & Carter, L.L.P, j:\c1cdcaRamm\2012-152 w&cxvw impact fee update 2012\rcports\04-report,docx -22- TV&T'VI'V Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, VII. WASTEWATER COLLECTION SYSTEM A. General At this time, based on the approved Land Use Assumptions for the City of Anna and the expectation for population growth, the City of Anna will approximately double the population in the ten-year period. The most significant growth, that affects the wastewater collection needs of the City, will occur in the Slayter Creek Basin, along the US 75 corridor, and east of SH 5. The wastewater collection system is partially in place to serve the new development. The existing Slayter Creels Wastewater Treatment Plant (WWTP), as well as the Point Of Entry (POE) to the NTWMD system, provide treatment for the sewage. Conveyance from the new developments to these existing facilities will be required. The City of Anna's flow is metered at the WWTP and at two Points of Entry into the regional NTMWD lines. In 2014, the City of Anna maintains the operation of six (6) sewage lift stations with force mains ranging in size from 2 -inch to 8 -inch. Three (3) lift stations are proposed to be constructed during the impact fee period, whereas two (2) existing stations will be taken off-line. B. Collection Lines 1) Existing System: ® Throckinorton Creek 21 -inch Collection: In approximately 2003, the City staff entered into a contract to construct approximately 4,500 linear feet of 21 -inch PVC collection line. This facilitated the construction of single family homes adjacent to FM 455. It also picked up flow from the commercial development located at the intersection of US 75 and FM 455. ® Slayter Creek 24 -inch Collection Line: In approximately 2005, the City staff entered into a contract to construct approximately 7,000 linear feet of 24 -inch PVC collection line. This facilitated the construction of single family homes in the slayter creek basin north of FM 455. jAclericahamna\2012-152 w&ww impact fee update 2012Vepoiis104-mpott.docx -23- w&W Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L,P, a Clemmons Creek Point of Entry: In approximately 2005, the City staff entered into a joint contract with the City of Melissa to construct a 15 -inch regional sanitary sewer collector line. The existing line as constructed is approximately one-half mile south of the City of Anna City Limit lines and is not being utilized by the City of Anna today. The extension of this line to the City of Anna, as contracted with the City of Anna, will facilitate growth in the City of Anna east of SH 5. ® Throckinortorl Creek Point of _Entry: In approximately 2009, the City staff entered into a joint contract with the City of Melissa to construct a 21 -inch regional sanitary sewer collector line. A large percentage of the projected growth will be conveyed to the Throekmorton Creek POE. Figure No. 2 illustrates the existing system improvements included in the impact fee calculation. 2) Proposed System Expansion: ® US 75 Corridor: To facilitate opening up the west development area of the City of Anna to meet the intentions of the Land Use Plan, the City will need to invest in collector line infrastructure. Approximately 7,200 linear feet of 12 -inch will be required to collect wastewater from the future residential. The proposed lines will connect to the proposed improvements within the Slayter Creek Basin. ® Slayter Creek Basin: In order for growth to occur in the Slayter Creels Basin, the Throckmorton and Oak Hollow Lift Stations will be required to be taken off-line. A 21 -inch gravity line from the Throckrnorton Creels Lift Station site conveying sewage to the regional NTMWD system will provide capacity for growth within the basin. Additionally, abandoning the existing Oak Hollow Lift Station and replacing with a 12 -inch gravity sanitary sewer will provide additional capacity for growth in the Ferguson Road/County Road 367 area. Figure No. 2 illustrates the proposed system improvements based on meeting the demands associated with the ten-year CIP for the City of Anna. The expectation is jAclecicaBanna\20I2-152 w&ww unpact fee update 2012\reporta\04-report,docn -24- W&WW Impact Fee Update 2014-2024 BirjMojj; Heildricks tt Carter, L,L.P. that each line will be ongincered based on tli(-,, demands associated with the current land use plain and any special circumstances particular to a business or operation that might potentially overload die system due to specific demand issues. C. Capital Improvement Program Tile wastewater facilities shown in Figure 2 include City constructed collection lines,, and trUnk sewer lines. The cost of the specific projects to be included in the Impact Fee Update is'itemized in Table No. It. The project locations arc shown in Figure No. 2, The projects shown in Table No, I I represent those required to nicet the needs of the pi-ojected growth as provided in Clio Land Use Assumptions for Impact Fees. w&mv holmd rev, -25- OWIFff,'Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L,P. Figure No. 2 i 42 �J 17 ++ 4t K t 71� ,r AN (7 #� L } g t i —} i,. �r � 12 ��� €.t7� m�.1y ll it 7 jf -) TT �.—v *1 A_ to _ n ' _ j _) j jji �� Ar • ��� �Z�j tt I � '`„ t pi� i 1 � f �J �-�1 It l(�� } ') ��_ !t."£ (� — _ _ a� UXr�..,_ j-11 ly I _ i __t J _ IT Y 'lit 1 � , i _ [ � y LT-_ WASTEWATER COLLECTION SYSTEM 2014-2024 IMPACB` FEE UPDATE CAPITAL. IMPROVEMENT PLAN 11IRK114FF, ItLNU1tICKR d. C'AKT6R, L.L.F, i 1'Ni,1,4illti.\tIN1IV,iNV nn„ ta.n. alu lnolrn.la., CITY OF ARJNt•1 tEAA!s M. :� Yii.9i-. ia..lnA RLkiNhml®r1.A mNYii'1s+ryd l..lrmm j:\clerical\anna\2012-152 w&mv impact fee update 2012\reports\04-report doex -26- W&WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, TABLE NO. 11 10 -YEAR WASTEWATER CAPITAL IMPROVEMENT PLAN WASTEWATER COLLECTION LINES Year Project Size Capital Cost (1) Developer Participation Debt Service (2) Total Project Cost $) Throckmorton Creek Parallel Line Total Project Cost ($) $ 1,260,000 ThrockMorton POE $ 661,500 $ 1,921,500 Sanitary Sewer Line #2 1511 $ 1,175,720 F Lift Station $ 617,253 $ 1,792,973 Sanitary Sewer Line #3 1511 $ 1,440,240 Lift Station $ 756,126 $ 2,196,366 Sanitary Sewer Line #4 21" $ 1,579,000 A Lift Station $ 828,975 $ 2,407,975 Sanitary Sewer Line #5 1211 $ 3,225,000 Subtotal: Wastewater Collection Facilities $ 1,693,125 $ 4,918,125 Sanitary Sewer Line 46 1211 $ 3,650,000 $ 1,916,250 $ 5,566,250 Sanitary Sewer Line #7 1811 24" $ 2,127,230 $ 1,116,796 $ 3,244,026 Sanitary Sewer Line #8 1211 $ 1,357,500 $ 712,688 $ 2,070,188 S anitary Sewer Line#9 (LM) 1211 $ 1,167,300 $ 612,833 $ 1,780,133 Sanitary Sewer Line #10 1211 $ 500,550 $ 262,789 $ 763,339 Sani!Lry Sewer Lune #11 (FM) 1511 $ 466,500 $ 244,913 $ 711,413 Sanitary Sewer Line #12 1811 $ 353,165 $ 185,412 $ 538,577 Sanitary Sewer Line #13 (FM) 1211 1 $ 860,370 $ 451,694 $ 1,312,064 Subtotal: Wastewater Collection Lines $ 19,162,575 $ 10,060,354 $_ 29,222,929 WASTEWATER COLLECTION FACILITIES Year Project Size Capital Cost (1) Debt Service (2) Total Project Cost ($) ThrockMorton POE $ - $ - $ - F Lift Station $ 1,750,000 $ 918,750 $ 2,668,750 Lift Station $ 2,250,000 $ 1,181,250 $ 3,431,250 A Lift Station 1.60 MGD $ 750,000 $ 393,750 $ 1,143,750 Subtotal: Wastewater Collection Facilities $ 4,000,000 $ 2,100,000 $ 7,243,750 jAclericab m\2012-152 w&wwimpact feeupdate 20121reparts\04-report,doca -27- 1V&WW Ji pact Fee Update 2014-2024 Table No. 11 PI.ANNTNC V0(PV..NSF. Birkhoff, Hendricks & Carter, L.L.P, Notes: (1)Opinion of Cost includes: a) Engineer's Opinion of Construction Cost b) Professional Services Fees (Survey, Engineering, Testing, Legal) c) Cost of Easement or Land Acquisitions) (2) Debt Service based on 20 -year simple interest bonds at 5% A. Utilized Capacity Utilized capacity for the wastewater collection system was calculated based on land absorption from population growth projections provided by the Land Use Assumptions prepared by the City's Plalming Department. The population and employment growth in each wastewater drainage basin was determined utilizing the City's growth projections. These growth rates were utilized to calculate 2014 and 2024 design flows. The following summarizes each design flow component utilized to calculate the wastewater design flows. 1) Population Based Flow: For the purpose of this wastewater impact fee study an average per capita flow of 100 gallons per day (gped) is a reasonable basis for the design of the wastewater collection and treatment facilities, 2) Non -Population Based Flow: Non-residential average flows are estimated based on an average flow per acre for each non-residential land use category. Commerical base unit flows were estimated to be 1,500 gallons per acre per day (gpad) to jAcltaickmma\2012-152 wSww impact fee update 2012b'cports\04-repurtAocx -28- W&WW bitpact Fee Update 2014-2024 Capital Debt Total Cost Service Project Year Project 1)(b) (2) Cost ($) 2012 Wastewater Impact Fee Calculation $ 20,000 $ 20,000 Subtotal: Planning and Operations: $ 20,000 $ - $ 20,000 Wastewater Collection System CIP 1 J$12.1 Grand Total: $ 23,182,575 $ 36,486.679 Notes: (1)Opinion of Cost includes: a) Engineer's Opinion of Construction Cost b) Professional Services Fees (Survey, Engineering, Testing, Legal) c) Cost of Easement or Land Acquisitions) (2) Debt Service based on 20 -year simple interest bonds at 5% A. Utilized Capacity Utilized capacity for the wastewater collection system was calculated based on land absorption from population growth projections provided by the Land Use Assumptions prepared by the City's Plalming Department. The population and employment growth in each wastewater drainage basin was determined utilizing the City's growth projections. These growth rates were utilized to calculate 2014 and 2024 design flows. The following summarizes each design flow component utilized to calculate the wastewater design flows. 1) Population Based Flow: For the purpose of this wastewater impact fee study an average per capita flow of 100 gallons per day (gped) is a reasonable basis for the design of the wastewater collection and treatment facilities, 2) Non -Population Based Flow: Non-residential average flows are estimated based on an average flow per acre for each non-residential land use category. Commerical base unit flows were estimated to be 1,500 gallons per acre per day (gpad) to jAcltaickmma\2012-152 wSww impact fee update 2012b'cports\04-repurtAocx -28- W&WW bitpact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L,L,P, simulate dry weather conditions. The City also has a public component to consider. The unit for public components was estimated to be 1,000 gpad. 3) Infiltration and Inflow: Groundwater can infiltrate into the sanitary sewer system through faulty sewer pipe joints, breaks in sewer pipes and manholes and faulty service lines. This infiltration creates an average day flow related burden on the wastewater collection system and the wastewater treatment plant. Infiltration is a constant that is not necessarily based on temporary storm based environmental conditions. Normal plant capacity must be designed to handle these infiltration related conditions. The City can embark on programs to rehabilitate lines that contribute significant infiltration volumes when economically and environmentally feasible, and/or desirable. Inflow is generally related to storm based events that increase groundwater and surface water flow into the sanitary system. The additional flow is generally recognized to enter through manholes, service lines, roof drains and storm drains. Inflow related surges could cause surcharged sewers, overflows at manholes and peak flows that surpass the capacity of the treatment plant. It is estimated, for wastewater collection system planning purposes, that the combined infiltration and inflow is 800 gallons per acre per day (gpad) for the existing wastewater collection system and 600 gpad for the new lines proposed in the build -out wastewater collection system. 4) The calculation of peak flows required the development of a unit hydrograph (Diurnal Curve). At the time of this report, a sufficient amount of wastewater flow data was not available to allow for a feasible approach for the development of a diurnal curve specific to the City of Anna. However, unit hydrographs from other cities monitored in the past were evaluated and compiled into a diurnal curve that reasonably represents the peak flow in the City of Anna. This diurnal curve is a unique tool that allows the hydraulic model to simulate a 24-hour cycle that follows the temporal variations in a wastewater system. The diurnal curve was applied jaclericabt a\2012-152 w&ww impact Fce update 2012\repor1s\04-report,docx -29- W&WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P. system wide to the base flows. The base flow calculated for inflow and infiltration is an independent variable that is not affected by the Diurnal Pattern. The percent utilized capacity was calculated for the design flow of each study year based on the build -out capacity. The utilized capacity during the Impact Fee period is the difference between the year 2024 capacity and the year 2014 capacity. Table No. 12 below summarizes the project cost and utilized cost over the impact fee period of 2014 - 2024 for each element of the wastewater system (impact fee eligible). The utilized capacity for each existing and proposed wastewater collection line is presented in detail in Impact Fee Capacity Calculation Tables No. 13, No. 14, and No. 15. FRITI-TwAkTOWN SUMMARY OF ELIGIBLE CAPITAL COST AND UTILIZED CAPACITY COST Water System Total 20 -Year Project Cost ($) Utilized Capacity During Fee Period ($) Existing Wastewater Facilities $12,994,814 $7,097,868 Proposed Wastewater Collection Sewer Lines $29,222,929 $13,152,624 Proposed Wastewater Facilities $7,243,750 $7,243,750 Planning Expenses $20,000 $20,000 Total: $49,481,493 $27,514,242 jAclericahanna\2012-152 w&w%v impact fee update 2012VcpoT&04-rep0rt.docx -30- w& WW Impact Pee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.R Table No. 13 Existing Wastewater Facilities — Impact Fee Eligible Costs jAckHcAC a\2012-152 w&mv impact Pee update 20Meports\04-report,dux - 31 - T3'&WW Impact Fee Update 2014-2024 •Q V K M� In b A W W Yw ,tom �11 ty��i� 00 �a aw v,w vE FIrF �,In � rn w r � n gym, v rn M .1c �o o c .^ O o n nt N U `0 00N N sl w P 3 6N9 6Ns &9 61) 10 F.H 6n r-1 e rl N � 6NF. ffl 69 in r� vt vl O � 69 bD �y o iv{ {oma (0 0 Z d A a. ti O N h7 a N N rl hD •p O 97 O O O ip r O � O a {{pyy i=a U N O N O O<3 O O O O G r-1 N Vt Vl O V 6N9 69 to 6M9 IM/f 69 V'�f 6N9 1 ZA K o a U s*5 E� r O� U V N U r' Ef3(A U V UIn .V V eq U U Cd W 0 W W bR 1" °1 .^ In VJ Q 3 o o V} CL " "' °° o Vi of o kl O •eehh a N N �UUrr rl N 'Xj rn 'X o a N N' rn Y CI N'jf' fi v N N iy' 'j t" a H N b•1 41 rn M ppp,,, o o F x x Lt w �r vy U U U U u �% e o o c o U 5 o U o 1 k c m a jAckHcAC a\2012-152 w&mv impact Pee update 20Meports\04-report,dux - 31 - T3'&WW Impact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, LLP, Table No. 14 Proposed CIP Wastewater Collection Lines — Impact Fee Eligible Costs jAclerieallanna\2012.152 w&%"v impact fee update 2012\reports\04-repart.d= -32- w&WI'vlrnpact Fee Update 2014-2024 a. � � � � Wil. � M � n '� v ,,{' • � ' � �j rry1 y v C N A M Yui »r CI M V y N M N H N in A u W fn G t~ �v} N O . rn r rq ruvt N T^ M to o� g o o o 0 0 o q o a N fig •g �: a ,� _. �+ e, o e a .., a W b ^ L N o M _ �l �,�..� rn. c 4 �.. a O� &w N �F ri vt N o C� N N ti r+ " °rl ig u ti .•, �', 7 e v P rn� b vZ :.� N M ' "' h u ."n. �� b . 'a N y � rlO N 0� MM _ , Q � Yfi a s o V r .r M MMj ^ •s Yni s� V Vi r., V O Yif 4t 4t 01 o O L U O ± C n v n rn rig cn N cd U) 5 v -- _ Q � c1 a s v R" ei m 0 0 v P 0 o O N' a V V N '7 IN O �Nry V1 VJ fn VI N y N y ul to VI h •qG jAclerieallanna\2012.152 w&%"v impact fee update 2012\reports\04-repart.d= -32- w&WI'vlrnpact Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P. Table No. 15 Proposed CIP Wastewater Collection Facilities — Impact Fee Eligible Costs j:MericaRanna\2012-152 w&mv hpact Fee update 2012\reports\04-repbrt.docx -33- W&Wl'VIrpact Fee Update 2014-2024 bA �4 a W Gn U W h N N n n kn n N 6�9 N A bM9 6q 69 N r' 609 b9 v e N 609 fA r�ii C G6 b e \ e o A w U b d e o 0 isf\il .d, a 0 N o 0 0 0 � C A d W w U b o o 0 0 0 0 N N 0 0 0 0 0 0 u 0 N r h N N r r In O N v N O 9) � fMn tfi 49 � N r H .0.0 69 F rr p V r�ell u 609 w P^ vi rn i --I d sn 69 cn UN y N b9 q N <n 0 0 0 0 0 o U Gl O O O Uy '•d r� � ��N � �� 7 In c Vi y3 v' � rri V1 r bmf U N tom+ a a a U w o , a Cd �_ a O$ U az j:MericaRanna\2012-152 w&mv hpact Fee update 2012\reports\04-repbrt.docx -33- W&Wl'VIrpact Fee Update 2014-2024 Birkhoff, Hendricks ce Carter, L,L.P. VIII. CALCULATION OF MAXIMUM IMPACT FEES - WATER & WASTEWATER SYSTEM The maximum impact fees for the water and wastewater systems are calculated separately by dividing the cost of the capital improvements or facility expansions necessitated and attributable to new development in the service area within the ten year period by the number of living units anticipated to be added to City within the ten year period as shown on the following tables. To simplify collection, we recommend the fee remain fixed throughout the 5 -year period, unless changed by Council. Eligible Existing Utilized Eligible Proposed Utilized Maximum Water Impact Fee = Cost + Cost Number of New Living Unit Equivalent over the Next 10 Years $9,330,510 + $25,936,746 $35,267,256 3,773 3,773 Maximum Calculated Impact Fee = $34 Allowable Maximum Water Impact Fee: (Max Impact Fee x 50%)* _ *-Alaximum allowable lmlxact%e is 50%ofthe maximum calculated iter 395 LGC Eligible Existing Utilized Eligible Proposed Maximum Wastewater Impact Fee = Costs + Utilized Costs Number of New Living Unit Equivalent over the Next 10 Years $7,097,868 + $20,416,374 3,110 Maximum Calculated Impact Fee = 9 220 Allowable Maximum Wastewater Impact Fee: (Max Impact Fee x 50%) _ * - Maximum allowable jitipact ce is 50% of the maximum calculated 395 LGC $4,674 $27,514,242 2,984 $4,610 jAc1cdca1\armaUO12-152 w&ww impact fee update 20121reporta104-rcpor1.doc. -34- W&WW bnpact Fee Update 2014-2024 Blrlrhny), Henetricks ct- Outer, L.L.P, Based on the Allowable Maximum Impact Fee Calculation for Water and Wastewater, Table No. 16 calculates the maximum water and wastewater (,sewer) impact lee for the various sizes. of'water teeters. j; cleric l'nnnyt2g12-I52 u.� isiv 1,11put kg opinto 20131ielmisl04-rryvitilm -35- j';t& IVI'V (llprict Fee Update 2014-2024 Birkhoff, Hendricks & Carter, L.L.P, TABLE NO. 16 ALLOWABLE MAXIMUM FEE PER LIVING UNIT EQUIVALENT AND PER METER SIZE AND TYPE 50% Max . Water Impact fee /LUE $ 4,674 50% Max. Wastewater Impact fee /LUE 1.$ 4,610 Typical Land Use Meter Type Meter Size LUE Maximum Fee Total Water rpact astewater Single Family Residential Simple 3/4" 1 $ 4,674 $ 4,610 $ 9,284 Single Family Residential Simple 1" 1.7 $ 7,945 $ 7,837 $ 15,782 Single Family Residential Simple 1-1/2" 3.3 $ 15,423 $ 15,212 $ 30,636 Single Family Residential Sinn le, 2" 5.3 $ 24,770 $ 24,432 $ 49,203 Cornnercial/Retail Compound 2" 5.3 $ 24,770 $ 24,432 $ 49,203 Commercial Retail Turbine 2" 6.7 $ 31,314 $ 30,886 $ 62,200 Conunercial/Retail/Multi Family Compound 3" 10.7 $ 50,008 $ 49,325 $ 99,334 Commercial/Retail/1\4ulti Fain y Turbine 3" 16 $ 74,779 $ 73,757 $ 148,536 Cominercial/Retail/Multi Family Compound 4" 16.7 $ 78,050 $ 76,984 $ 155,035 Conunercial/Retail/Multi Farnify Turbine 4" 28 $ 130,863 $ 129,076 $ 259,938 Industrial Compound 6" 33.3 $ 155,633 $ 153,508 $ 309,141 Industrial Turbine 6" 61.3 $ 286,496 $ 282,583 $ 569,079 Industrial Compound 8" 53.3 $ 249,107 $ 245304 $ 494,811 Industrial Turbine 8" 106.7 $ 498,681 $ 491,870 $ 990,551 Industrial Compound 10" 153.3 $ 716,474 $ 706,688 $1,423,163 Industrial Turbine 10" 166.7 $ 779,101 $ 768,460 $1,547,562 Industrial Turbine 12" 1 220 $ 1,028,208 $ 1,014,165 $2,042,373 Note: Selection of the meter size and type shall be dependent on application, and with the input of both the applicant and City staff. j 1\clerical\aoaa\2012-152 w&ww impact fee update 2012\reports\04-report,doex -36- W& JfW hiipact Fee Update 2014-2024 Birkhojr Hendricks &, Carter, L.L.A G of Anna's Land Use Assumptions for Impact Fees ity lloput ire update -37- TVMflJlh);paetllee Update 2014-2024 Iyj 111111111 Advisory Committee Justin Burr — Chairman & Planning and Zoning Commissioner Sandy Setliff — Member from Real Estate Community & Planning and Zoning Commissioner Tiffany Burleson — Planning and Zoning Commissioner Elaine Gothard — Planning and Zoning Commissioner John Johnson — Planning and Zoning Commissioner Darrin Columbo — Planning and Zoning Commissioner Lee Miller — Planning and Zoning Commissioner Gary Billups — Member from Extraterritorial Jurisdiction Staff Philip Sanders — City Manager Kenny Jenks — Police Chief — Deputy City Manager Tim Gothard — Fire Chief Maurice Schwanke — Director of Planning and Development Rob Woods — Public Works Director Clayton Fulton — Finance Director Page 1 of 14 RANI) USE ASSUMPTIONS FOR IMPACT FEES PURPOSE The purpose of this study is to analyze both existing and future land use, and to forecast growth trends for the City of Aima. This land use data provides a basis for determining and scheduling the capital improvements required to serve the existing and fixture population of the City of Anna. This study fulfills the requirements of Chapter 395 of the Texas Local Government Code which prescribes the process by which cities in Texas must formulate impact fees. The purpose of impact fees is to provide an equitable funding method for future capital improvement facilities for: water transmission, distribution, production and storage; wastewater collection, transmission and treatment, and thoroughfares to serve new developments in the City of Anna. These land use assumptions, which also include population, and basic, service, and retail land use projections, will become the basis for the preparation of impact fee capital improvement plans for water, wastewater, and roadway facilities. To assist the City of Anna in determining the need and timing of capital improvements to serve future development, a reasonable estimation of future growth is required. The purpose of this report is to formulate growth and development projections based upon assumptions pertaining to the type, location, quantity and timing of various future land uses within the community, and to establish and document the methodology used for preparing the growth and land use assumptions. ELEMENTS OF THE LAND USE ASSUMPTIONS REPORT This report contains the following components: I. Methodology -- Explanation of the general methodology used to prepare the land use assumptions. II. Data Collection Service Area Maps (Figures 1, and 2) -- Explanation of division of the City into impact fee service areas for roadway, water and wastewater facilities. III. Base Year Data -- Information on population, employment, and land use for Anna as of 2014 for each capital facility service area. IV. Ten -Year Growth Assumptions -- Population and employment growth assumptions for ten years by impact fee service areas. V. Summary -- Brief synopsis of the land use assumptions report. Page 2 of 14 I. METHODOLOGY Based upon the growth assumptions and the capital improvements needed to support growth, it is possible to develop an impact fee structure which fairly allocates improvement costs to growth areas in relationship to their impact upon the entire infrastructure system. The database and projections in this report have been formulated using reasonable and generally accepted planning principles. These land use assumptions and future growth projections take into consideration several factors influencing development patterns, including the following: • The character, type, density, and quantity of existing development • Existing zoning patterns • Anticipated future land use (as shown on the City's Future Land Use Plan) • Availability of land for future expansion • Current and historical growth trends within the City • Building permit activity trends • Basic, Retail, and Service land use absorption rates • Physical holding capacity of the City • Known or anticipated development projects Following is the general methodology used for the preparation of this report: 1. Update impact fee service areas as necessary for roadway, water and wastewater facilities (see Section H -- Service Area Maps). 2. Collect/determine benchmark data on population, basic, retail and service land use as of 2014 (see Section III-- Base Year Data). 3. Project population and basic, retail and set vice land use growth for ten years by impact fee service area (see Section IV -- Ten-Year Growth Assumptions). More detailed discussion for each of the above is contained within the respective sections. Page 3 of 14 11. SERVICE AREA MAPS Service Area Maps Figure 1, entitled "Roadway Impact Fee Service Area Structure", details the nine (9) service areas for roadway facilities. Although the capital improvements plan and impact fees will be prepared as a separate document for roadway facilities, the geographic boundaries of the roadway service areas are shown as Figure 1. Figure 2 show the service areas for water and wastewater facilities. The boundary for water and wastewater facilities service area is the combination of the existing city limits and the extraterritorial jurisdiction. Documents containing the capital improvements plan for water and wastewater facilities will also be prepared separately. Data Format The existing data base, as well as the future projections, was formulated according to the following format and categories: Service Area Correlates to the proposed roadway, water and wastewater service areas identified on the attached maps. Housing Units (2014) All housing units including single-family, duplex, multi -family and group quarters. The number of existing housing units has been shown for the base year (January 1, 2014). Housing Units (2024) Projected housing units by service zone for January 2024 (ten-year growth projections). Population (2014) Existing population for the base year (January 2014). Population (2024) Projected population by service area for the year 2024 (ten-year growth projections). Employment (2014, 2024) Employment data is aggregated to three employment sectors and include: Basic, Retail and Service. The following details which North American Industry Classification (NAIC) codes fall within each of the three sectors. Basic (#210000 to 4422999) -- Land use activities that produce goods and services such as those that are exported outside the local economy; manufacturing, construction, transportation, wholesale trade, warehousing and other industrial uses. Retail (#440000 to #454390) -- Land use activities which provide for the retail sale of goods that primarily serve households and whose location choice is oriented toward the household sector such as grocery stores, restaurants, etc. Service (1{520000 to #928199) -- Land use activities which provide personal and professional services such as financial, insurance, government, and other professional and administrative offices. Page 4 of 14 F :�Ilf, , 11-1 SM WA III. BASE YEAR DATA This section documents the City's historical growth trends and data from the base year of January 1, 2014. This "benchmark" information provides a starting basis of data for the ten-year growth assumptions that will be presented within the following section. Population Growth The existing and past population levels for Anna are depicted in Table 1. As indicated, between 1940 and 2010 the population growth has been substantial, increasing from 509 persons in 1940 to 8,249 persons in 2010. The 2013 estimated population estimated the North Central Council of Governments is 9,360 persons, which represents a significant increase (13.5%) since the 2010 estimate. Currently, the total population is estimated to be 10,300 based on the housing count prepared in this report. This estimate uses an average household population of 3.15 and an occupancy rate of 94 percent. Additionally, within the City and the ETJ the population is estimated to be over 13,632 persons. TABLE 1 ANNA POPULATION RO YEAR POPULATION 1940 509 * 1950 525 * 1960 639 1970 736 �sa 1980 855 1990 904 2000 2010 1 225 8,249 2013 9,360 ** 2014 * Source: U.S. Census North Central Texas Council of Govermnents Population Estimates Y"* The January 2014 population estimate shown above was derived using data from this 2014 Land Use Assumptions Report. Source: City of Anna Existing Land Use In any evaluation and projection of future land use patterns, a documentation of existing conditions is essential. Documentation of existing land use patterns and population was made from the City's Comprehensive Plan as amended and used as a base line for future growth projections. Table 2 represents a summary of existing population and employment acreages for Aima and the associated water and wastewater planning areas. The appendices detail data by various impact fee service areas. Page 7 of 14 TABLE 2 ANNA EXISTING POPULATION & EMPLOYMENT -2014 BY AREAS Roadway Boundary - City Limits Housing Units 3,479 Population 10,300 Total Employment Acreage 101.6 Basic Employment Acreage 37.5 Retail Em loyment Acreage 44.7 Service Employment Acreage 19.4 Water Boundary — City Limits and ETJ Housing Units 4,604 Population 13,632 Waste Water Boundary— City Limits and ETJ Housing Units 4,604 Population 1 13,632 Source: City of Anna IV. TEN-YEAR GROWTH ASSUMPTIONS Growth is characterized in two forms: population (residential land use) and employment (nonresidential land use). A series of assumptions were made to arrive at reasonable growth rates for population and employment. The following assumptions have been made as a basis from which ten-year projections could be developed. _ Future land uses will occur as identified on the Future Land Use Plan adopted in 2010 with updates The City will be able to finance the necessary improvements to acconnmodate growth, School facilities will accominodate increases in population, and Densities will be as projected as detailed in the Comprehensive Plan. The ten-year projections, or land use assumptions, are based upon the establishment of a reasonable growth rate which is based upon past trends or other considerations. Given the impact on growth due to the economic fluctuations in the late 2000's, analysis of annual growth based on data from building permit data and U.S. Census was undertaken to provide further insight into growth trends experienced within the City. The single-family building permit activity since 2005 in Anna has fluctuated with time, going from 506 in 2005 to as low as 7 in 2009. Table 3 represents this fluctuation in growth and the data used to find the average number of permits over the nine-year period, of 232 building permits. Several different scenarios were produced to estimate the future population using a range of building permits from 200 to 300 and also percentage increases of 6, 7 and 9 as shown in Table 4. The scenario that best fits the last two years of building permits and the anticipated growth is the 7 percent therefore it was the growth rate used for this analysis. Page 8 of 14 TABLE 3 ANNA BUILDING PERMIT RECENT HIS'T'ORY Year Single Family Building Permits 2005 506 2006 346 2007 148 2008 77 2009 7 2010 26 2011 2012 100 351 2013* 300 Average 232 *Projected for Years End. SOURCE: Planning and Development Department TABLE 4 ANNA POPULATION PROJECTIONS Year 200 unit/yr 300 units/ yr 5% after 2013 6% after 2013 7% after 2013 9% after 2013 2014 10,300 10,300 10,300 10,300 10,300 10,300 2015 10,900 11,200 10,815 10,918 11,021 11,227 2016 11,500 12,100 11,356 11,573 11,792 12,237 2017 12,100 13,000 11,924 12,267 12,618 13,339 2018 12,700 13,900 12,520 13,004 13,501 14,539 2019 13,300 14,800 13,146 13,784 14,446 15,848 2020 13,900 15,700 13,803 _ 14,611 15,458 17,274 2021 14,500 16,600 14,493 15,487 16,540 18,829 2022 15,100 17,500 15,218 16,417 17,697 20,523 2023 15,700 18,400 15,979 17,402 18,936 22,371 2024 16,300 19,300 16,778 18,446 20,262 24,384 Source: City of Anna Page 9 of 14 30,000 25,000 20,000 15,000 10,000 5,000 L FIGURE 3 ANNA POPULATION PROJECTIONS 2014 2015 2016 2017 2018 2019 2020. 2021 2022 2023 2024 Source: City of Anna X200 unit/yr 300 units/yr 5% after 2013 6% after 2013 >? 7% after 2013 x9% after 2013 The development of ten-year housing estimates were calculated using the seven percent growth rate derived above. However the growth was not projected to occur evenly throughout the roadway service areas of the city. While growth will generally occur throughout the city, the current city staff provided knowledge of the key growth areas within the community. Many new developments are in the planning phases with preliminary plats being currently submitted. The following is a list of the major projects interests: • Lake View Preliminary Plat —168 lots • West Crossing Phase 4 — Final Plat Construction Plans under review — 70 lots • Anna Crossing Phase IA & 1B Preliminary Plat — 175 lots • Anna Crossing Phase I Construction Plans under review • Anna Crossing Phase 2A Constriction Plans under review — 59 lots • Discussions on future phase of North Point Crossing — 498 lots • Discussions on Villages of Hurricane Creek — 1,008 lots • Discussions on Oak Ridge — 2,635 lots Page 10 of 14 Other conversations with developers are occurring regularly on other large land holdings. The ten-year population estimates were determined by growing service areas to represent current development patterns while also maintaining the 7 percent overall growth rate. The household growth figures are shown by roadway service area in Table 5. TABLE 5 ANNA PROJECTED GROWTH BY SERVICE AREA SERVICE AREA 2014 HOUSEHOLDS ANTICIPATED DEVELOPMENT PERMITS 2024 HOUSEHOLDS ANNUAL GROWTH RATE 2014-2024 A 123 595 718 19.29% B 68 320 388 19.02% C 1,704 625 2,329 3.17% D 1,193 525 1,718 3.71% E 522 650 1,172 8.42% F 321 175 496 4.45% G 184 535 719 14.60% H 377 50 427 1.25% I 104 50 154 4.00% Total 4,596 3 525 8,121 5.86% Source: City of Anna TABLE 6 ANNA TEN-YEAR POPULATION PROJECTIONS ROADWAY 2014 2024 SERVICE AREA HOUSING UNITS POPULATION NEW HOUSING UNITS TOTAL PROJECTED HOUSING UNITS POPULATION A 4 12 565 569 1,685 B 19 56 300 319 945 C 1,699 5,030 625 2,324 6,880 D 1,030 3,050 525 1,555 4,603 E 398 1,178 650 1,048 3,102 F 205 607 175 380 1,125 G 120 355 525 645 1,910 H 3 9 0 3 9 I 1 3 0 1 3 Total 3,479 10,300 3,365 6,844 20,262 Source: City of Anna Page 11 of 14 Based on values in the Anna Comprehensive Plan the commercial land use which includes retail and service that Anna has is approximately 0.7 acres per 100 persons and the industrial (basic) category had 0.2 acres per 100 acres. The City has been underserved with retail/office space and the absorption rate is anticipated to be closer to 1.4 acres per hundred persons with 1,2 acres per hundred for retail and 0.2 acres for service, Basic land use per 100 persons is recommended to be ,5 acres. It should also be mentioned that the location of the basic, retail and service acreages are not distributed proportionately by area population but by zoning patterns and anticipated developments. TABLE 7 ANNA TEN-YEAR BASIC/RETAIL/SERVICE LAND USE PROJECTIONS ROADWAY SERVICE BASIC ACRES RETAIL ACRES SERVICE ACRES TOTAL ACRES AREA 2014 2024 2014 2024 2014 2024 2014 _ A_ 0 0 0 25 0 2 0 _2024 27 B 8.7 20 16.4 25 0 3 25.1 48 C 15.5 25 7.8 80 10.3 14 33.6 119 D 6.6 12 18.4 60 2 8 27 80 E 0 0 0 10 0 1 0 11 T 5.7 12 1.4 15 1.4 5 8.5 32 G 0 22 .7 15 1.8 3 2.5 40 H 0 0 0 7 0 0 0 7 1 1 10 0 6 3.9 5 4.9 21 TOTAL 37.5 101 44.7 243 19.4 41 101.6 385 Source: City of Arora V. SUMMARY • Anna presently contains approximately 15.01 square miles of land within the City limits and a total land area within the city limits and extraterritorial jurisdiction of 6094 square miles. • The existing population of Anna is approxitnately 10,300 persons, and the existing estimated acreage of basic, retail and service is 101.6 acres within the City Limits. • An average annual growth rate of 7 percent was used to calculate the Anna's ten-year population growth projections. • The ten-year (2024) growth projection of Anna is 20,262 persons, and the ten-year projected acreage of basic, retail and service land use is 385 acres. Page 12 of 14 00 w v Y 1 W C O � U ! V a O M � ! f 'j a C/J A 00 w v C O a O M � M � a v A o ,Uo A O N O � a O - � F4 is m m 0. a o b �n p a N ti a H m c} F� u' O \ j © g ) F 0 <In ! o 4 P, ® G ¥ 2 \ � _ % � 3 � e § � � m ) � ] ) ' ) ) x 2 \ @ G b b . �\§ \ } ) \ _ ) A ) k ) , / I 2 J 3 / R — yIs \« t. � ` . § ..._ \~ ] mIn m s / \ § w 7 Q ) 7 ® \ } 5 R In In j / ; ] \ \ ƒ \ y o e m e a R / $ 5 k \ o � \ j © CD CD \ \ @ R ! o 4 \ ® G ¥ 2 \ � _ % r 3 � e \ § § § � ] ) ' / / \ @ G b b . \ \ _ j A L , \ % © CD CD \ \ ) R ! o 4 \ ® G ¥ 2 \ � _ % r ) � e & § § \ ) ' a / / & @ G b / . \ ƒ A L , / / 0 \ \ yIs \« ) / £ ] mIn \ 2 \ § w 7 Q ) 7 ® \ } w ; ƒ 1. i a R ° ) ] ) \ e \ % 0 \ . CD CD \ § R S } o 4 \ ® G ¥ 2 \ � _ % ± ; e ) � « \ / § 2 \ A % 0 \ . CD CD \ S } \ 0 a # \ \ � _ % e ) � \ 2 & G b j \ ƒ A / APPENDIX B ROADWAY AREA ESTIMATED POPULATION CAPACITY Area Estimated Population Capacity Area - A 5,390 Area - B 2,420 Area - C 15,140 Area - D 6,760 Area -E 3,280 Area - F 1,300 Area - G 10,980 Area - H 800 Area - 1 5,160 TOTAL 51,230 tM PROFESSIONAL !' iOO.;ENGINEERS 11910 Greenville Ave., Suite 600, Dallas, Texas 75243 4 361-7900 JANUARY 2014