Loading...
HomeMy WebLinkAboutRes 2023-03-1404 Awarding Phase 1 Downtown Utility Rehabilitation Project to Canary ConstructionCITY OF ANNA, TEXAS RESOLUTION NO. 24 ;Z-3 - O'3 -- 14o�4 A RESOLUTION OF THE CITY OF ANNA, TEXAS AWARDING THE BID FOR PHASE 1 OF THE DOWNTOWN UTILITY REHABILITATION PROJECT TO CANARY CONSTRUCTION, INCORPORATED IN THE AMOUNT NOT TO EXCEED THREE HUNDRED SIXTY FIVE THOUSAND THREE HUNDRED THIRTY THREE DOLLARS ($365,333.00); AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Downtown Utility Rehabilitation Project is identified as a capital utility project in the City of Anna, Texas; and, WHEREAS, multiple water and sanitary sewer utilities in the downtown area have been identified as being in poor condition and the City of Anna is seeking to complete major rehabilitation of the system; and, WHEREAS, the City of Anna publicly advertised the phase 1 portion of the project and open bids in accordance with Texas Local Government Code; and, WHEREAS, the lowest qualified bid was received from Canary Construction, Incorporated in the amount of $325,333 as shown in Exhibit A, attached; and, WHEREAS, the City will include $40,000 in contingency funds for the construction project to provide funding only to be spent when required for unforeseen changes to the project scope which may be necessary during construction; and. WHEREAS, the project funding will come from the Coronavirus State and Local Fiscal Recovery Funds received from the Federal Government in accordance with the Fiscal Year 2022-2023 Budget; and, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS THAT: Section 1. Recitals Incorporated The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Authorization of Payment and Funding. That the City Council of the City of Anna hereby awards the project to Canary Construction, Incorporated, and authorizes the City Manager to execute a construction contract in a form approved by the City Attorney, in an amount not to exceed $365,333.00 to Canary Construction, Incorporated for the Phase 1 Downtown Utility Rehabilitation Project. That funding for the project shall come from the State and Local Coronavirus Fiscal Recovery Funds. PASSED AND APPROVED by the City Council of the City of Anna, Texas on this 2 S}� day of March 2023. ATTEST: 121Yh 1�L�` City Secretary, Carrie Land APPROVED: * ayor, Nate Pike * THE CITY OF Anna TEXAS * 1913 Phase 1 of Downtown Utility Relocate 9 do fir. aJ.Almij I 8-inch Sewer R 8-inch Water ' t �IGrantham & Associates, Inc. Civil Engineering & Surveying March 13, 2023 Mr. Justin Clay City of Anna 3223 North Powell Parkway Anna, TX 75409 G&A No. 1448-22 Re: Downtown Water & Sanitary Improvements — Phase 1 Recommendation of Award to Canary Construction, Inc. Dear Mr. Clay: On Friday, March 10, 2023, the City of Anna publicly opened 7 bids for the above referenced project. Grantham & Associates, Inc. (G&A) tabulated the bids (see attached bid tabulation) and the results are summarized below. Company Name Total Bid 1. Canary Construction $ 325,333.00 2. A&M Construction $ 332,736.50 3. Hayes Construction $ 359,790.00 4. Thomas II Development $ 385,730.00 5. Dickerson Construction $ 406,555.00 6. J&L Construction $ 437,461.54 7. Atkins Brother Equipment $ 516,834.00 Canary Construction, Inc. was the low bidder with a bid of $325,333. Canary Construction has successfully completed a previous project for Grantham & Associates. In addition, the references for Canary Construction, Inc. provided positive comments. Consequently, we recommend that the City award the subject project to Canary Construction, Inc. in the amount of $325,333.00. Please contact me if you need any additional information. Sincerely, 11 vt�— Molly Pierson, P.E. Attachment H:\WPD0CS\PR0JECTS\ANNA\1448-22 2022 Anna Downtown Water & Sanitary Sewer Improvements\Contractor Recommendation Ph I\1448 Contractor Recommendation.docx Bid Tabulation Downtown Water & Sanitary Improvements - Phase 1 City of Anna March 10, 2023 Engineer's Estimate Canary Construction I ARM Construction Hayes Construction ITEM NO. DESCRIPTION UNIT BIDTOTAL UNITCOST TOTALCOST UNITCOST TOTALCOST UNITCOST TOTALCOST UNITCOST TOTAL COST 1 SAWCUT, REMOVE & DISPOSE CONCRETE DRIVEWAY PAVEMENT SY 21 $30.00 $630.00 $75.00 $1,575.00 $40.00 $840.00 $140.00 $2,940.00 2 SAWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT SY 201 $30.00 $6,030.00 $75.00 $15,075.D0 $35.00 $7,035.00 $45.00 $9,045.00 3 REMOVE& DISPOSE GRAVEL DRIVEWAY SY 10 $10.00 $100.G0 $55.00 $550.00 $42.00 $420.00 $30.00 $300.00 4 FURNISH& INSTALL ASPHALT PAVEMENT (2"TYPE D&6"TYPE B) SY 201 $60.00 $12,060.00 $90.00 $18,090.Do $80.00 $16,080.00 $105.00 $21,105.00 5 FURNISH& INSTALL CONCRETE DRIVEWAY(4,000 PSI) SY 21 $65.00 $1,365.00 $90.00 $1,890.00 $150.00 $3,150.00 $160.00 $3,360.00 6 FURNISH& INSTALL GRAVEL DRIVEWAY SY 10 $40.00 $400.00 $40.00 $400.00 $50.00 $500.00 $60.00 $600.00 7 REMOVE & DISPOSE MANHOLE EA 1 $1,000.00 $1,000.00 $1,000.00 $1,000.D0 $1,850.00 $1,850.00 $2,200.00 $2,200.00 8 FURNISH & INSTALL WATER 6" DR-18 PVC LF 5 $75.00 $375.00 $659.00 $3,250.00 $105.00 $525.00 $450.00 $2,250.00 9 FURNISH& INSTALL WATER LOWERING 6"DR-18 PVC LF 20 $80.00 $1,600.00 $420.00 $8,400.00 $227.00 $4,540.00 $250.00 $5,000.00 SO FURNISH & INSTALL WATER B" DR-18 PVC LF 1265 $85.00 $107,525.00 $85.00 $107,525.001 $79.00 $99,935.00 $90.00 $113,850.00 11 FURNISH& I NSTALL WATER LOWERING 8"DR-18 PVC LF 60 $95.00 $5,700.00 $329.00 $19,200.00 $265.00 $15,900.00 $125.00 $7,500.00 12 FURNISH & INSTALL WATER 12" DR-18 PVC LF 13 $115.00 $1,495.00 $420.OD $5,460.DO $126.00 $1,638.00 $230.00 $2,990.00 13 FURNISH & INSTALL DUCTILE IRON FITTINGS TN 0.85 $6,000.00 $5,100.00 $15,000.00 $12,750.00 $8,900.00 $7,565.00 $20,000.00 $17,ODO.00 14 FURNISH & INSTALL 8"x8"TAPPING SLEEVE &VALVE EA 1 $6,000.00 $6,000.00 $6,500.00 $6,500.00 $6,778.00 $6,778.00 $9,500.00 $9,500.00 15 FURNISH AND INSTALL 6"INSERT-A-VALVE EA 1 $15,000.00 $15,000.00 $7,500.00 $7,500.00 $10,362.00 $10,362.00 $13,000.00 $13,000.00 16 FURNISH AND INSTALL B"GATE VALVE EA 7 $3,000.00 $21,000.00 $2,500.00 $17,500.00 $2,369.00 $16,583.00 $3,900.00 $27,300.00 17 FURNISH AND INSTALL 12" GATE VALVE EA 1 $6,500.00 $6,500.00 $4,500.00 $4,500.00 $3,880.00 $3,880.00 $5,800.00 $5,800.00 18 FURNISH& INSTALL FIRE HYDRANT WITH 6" VALVE & 6" LEAD EA 3 $5,000.00 $15,000.00 $7,800.00 $23,400.00 $8,483.00 $25,449.00 $9,500.00 $28,500.00 19 FURNISH & INSTALL S"WATER SERVICE EA 4 $1,800.00 $7,200.00 $1,500.00 $6,000.00 $2,430.00 $9,720.00 $1,9D0.00 $7,600.00 20 LOCATE AND CONNECT TO EX WATER ON SW CORNER OF 7TH AND RIGGINS LS 1 $20,000.00 $20,000.00 $2,200.00 $2,200.00 $6,262.00 $6,261.00 $4,500.00 $41500.00 21 TRENCH SAFETY (FOR WATER) LF 1350 $2.00 $2,700.00 $2.00 $2,700.00 $1.25 $1,687.50 $3.00 $4,050.00 22 FUFIN ISH& INSTALL SANITARY SEWER 10" PVC SDR-26 ASTM D3034 LF 216 $100.00 $21,600.00 $125.00 $27,000.00 $119.00 $25,7G4.00 $95.00 $20,520.00 23 FUFINISH & INSTALL SANITARY SEWER MANHOLE 4'DIA EA 1 $7,OD0.00 $7,000.00 $8,500.OD $8,500.00 $9,380.00 $9,390.00 $8,800.00 $8,800.00 24 CONNECT I0" PVC SANITARY SEWER TO EXISTING MAN HOLE EA 1 $SD0.00 $500.00 $1,520.00 $1,520.00 $1,950.00 $1,950.00 $4,500.00 $4,500.00 25 FURNISH& INSTALL BYPASS PUMPING LS 1 $7,500.00 $7,500.00 $5,500.00 $5,500.00 $12,000.00 $12,000.00 $9,000.00 $9,000.00 26 TRENCH SAFETY (FOR SEWER) LF 216 $2.00 $432.OD $3.00 $648.00 $1.50 $324.00 $5.00 $1,080.00 27 EROSION CONTROL LS 1 $5,000.00 $5,000.00 $1,500.00 $1,500.00 $7,920.00 $7,920.D0 $2,500.00 $2,500.00 28 MOBILIZATION LS 1 $351000.00 $15,000.00 $6,000.00 $6,000.00 $15,500.00 $15,500.00 $17,000.00 $17,000.00 29 FURNISH&INSTALL TRAFFIC CONTROL LS 1 $7,SD0.00 $7,500.G0 $3,000.00 $3,000.00 $10,560.00 $10,560.00 $3,O0O.OD $3,000.00 30 FU FINISH AND INSTALL TEMPORARY CONSTRUCTION FENCE LF 200 $10.00 $2,000.00 $I5.00 $3,000.00 $13.50 $2,700.00 $15.00 $3,000.00 31 Materials Testing L5 1 $12,000.00 $12,000.00 $3,200.ODI $3,200.001 $6,000.001 $6,000.001 $2,000.001 $2,000.00 Indicates error on bid form TOTAL-1 $315,312.00 $325,333.00 $332,736.50 $359,790.00 Page 1 of 2 Bid Tabulation Downtown Water & Sanitary Improvements- Phase 1 City of Anna March 10, 2023 Thomas 11 Development I Dickerson Construction I 1&L Construction I Atkins Bros. Equip. ITEM NO. DESCRIPTION UNIT BIDTOTAL UNITCOST TOTALCOST UNIT COST TOTALCOST UNIT COST TOTALCOST UNIT COST TOTALCOST 1 SAWCUT, REMOVE & DISPOSE CONCRETE DRIVEWAY PAVEMENT SY 21 $100.00 $2,100.00 $25.00 $525.00 $173.86 $3,651.06 $116.00 $2,436.00 2 SAWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT SY 201 $50.00 $10,050.00 $15.00 $3,015.00 $41.48 $8,337.48 $116.00 $23,316.00 3 REMOVE & DISPOSE GRAVEL DRIVEWAY SY 30 $300.00 $3,000.00 $50.00 $500.00 $172.50 $1,725.00 $75.00 $750.00 4 FURNISH& INSTALL ASPHALT PAVEMENT (2" TYPE D & 6" TYPE B) SY 202 $50.00 $10,05D.00 $120.00 $24,120.00 $118.92 $23,902.92 $70.00 $14,070.00 5 FURNISH & INSTALL CONCRETE DRIVEWAY(4,00D PSI) SY 21 $375.00 $7,875.00 $150.00 $3,150.00 $175.86 $3,693.06 $300.00 $6,300.00 6 FURNISH& INSTALL GRAVEL DRIVEWAY SY 10 $100.00 $1,000.00 $100.00 $1,000.00 $316.00 $3,160.00 $60.00 $600.00 7 REMOVE& DISPOSE MANHOLE EA 1 $1,200.00 $1,200.00 $2,000.00 $2,000.00 $3,079.00 $3,079.00 $2,190.00 $2,190.00 8 FURNISH & INSTALL WATER 6" OR-18 PVC LF 5 $103.00 $515.00 $150.00 $750.00 $255.00 $1,275.00 $150.00 $750.00 9 FURNISH & INSTALL WATER LOWERING 6" OR-18 PVC LF 20 $103.00 $2,060.00 $250.00 $5,000.00 $163.35 $3,267.00 $200.00 $4,000.00 10 FURNISH & INSTALL WATER 8" DR-18 PVC LF 1265 $97.G0 $122,705.00 $135.00 $170,775.00 $134.38 $169,990.70 $I5G.00 $189,750.00 11 FURNISH& INSTALL WATER LOWERING 8"DR-18 PVC LF 60 $140.00 $8,400.00 $275.00 $16,500.00 $183.28 $10,996.80 $200.00 $12,000.00 12 FURNISH & INSTALL WATER 12" OR-18 PVC LF 13 $125.00 $1,625.00 $300.00 $3,900.00 $276.31 $3,592.03 $3,500.D0 $45,500.00 13 FURNISH & INSTALL DUCTILE IRON FITTINGS TN 0.85 $11,000.00 $9,350.00 $23,000.00 $19,550.00 $21,460.00 $18,241.00 $5,000.DO $4,250.DD 14 FURNISH & INSTALL 8"x8" TAPPING SLEEVE & VALVE EA 1 $5,400.00 $5,400.00 $6,D00.00 $6,000.00 $10,103.00 $10,103.00 $1,300.00 $1,300.00 15 FURNISH AND INSTALL 6"INSERT-A-VALVE EA 1 $8,800.00 $8,800.00 $9,500.00 $9,500.00 $13,646.00 $13,646.00 $10,000.00 $10,000.06 16 FURNISH AND INS TALL 8" GATE VALVE EA 7 $3,500.00 $24,500.00 $2,500.00 $17,500.00 $4,131.50 $28,920.50 $2,500.00 $17,500.00 17 FURNISH AND INSTALL 12" GATE VALVE EA 1 $6,900.00 $6,900.00 $3,500.00 $3,500.00 $6,769.00 $6,769.00 $4,500.00 $4,500.06 SB FURNISH & INSTALL FIRE HYDRANT WITH 6" VALVE & 6" LEAD EA 3 $8,800.00 $26,400.00 $8,000.00 $24,000.00 $8,966.67 $26,900.01 $7,000.00 $21,000.00 19 FURNISH & INSTALL 1" WATER SERVICE EA 4 $1,075.00 $4,300.00 $2,100.00 $8,400.00 $1,946.50 $7,786.00 $4,500.00 $18,000.00 20 LOCATE AN D CONNECT TO EX WATER ON SW CORNER OF 7TH AN D BIGGINS LS 1 $1,800.00 $1,800.00 $6,500.00 $6,500.00 $3,489.00 $3,489.00 $1,028.OD $1,028.D0 21 TRENCH SAFETY (FOR WATER) LF 1350 $6.00 $8,100.00 $1.00 $1,350.00 $2.11 $2,848.50 $1.00 $1,350.06 22 FURNISH& INSTALL SANITARY SEWER 10" PVC SDR-26 ASTM D3034 LF 216 $125.00 $27,000.00 $165.00 $35,640.00 $107.16 $23,146.56 $250.GD $54,000.00 23 FURNISH& INSTALL SANITARY SEWER MANHOLE 4'DIA EA 1 $9,500.00 $9,500.00 $7,500.00 $7,5DO.00 $11,061.00 $11,061AD $15,000.00 $15,000.G0 24 CONNECT I0" PVC SANITARY SEWER TO EXISTING MAN HOLE EA 1 $1,200.00 $1,200.00 $1,000.00 $1,000.00 $2,739.DO $2,739.00 $1,028.00 $1,028.00 25 FURNISH& INSTALL BYPASS PUMPING LS 1 $12,000.00 $12,000.00 $4,800.00 $4,800.00 $6,292.00 $6,292.0D $25,000.00 $25,000.00 26 TRENCH SAFETY (FOR SEWER) LF 216 $25.00 $5,400.00 $5.00 $1,080.00 $3.62 $781.92 $1.00 $216.00 27 EROSION CONTROL LS 1 $5,000.00 $5,000.00 $1,DDO.00 $1,0D0.00 $7,278.00 $7,278.00 $2,DDO.00 $2,000.00 28 MOBILIZATION LS 1 $35,000.00 $35,000.00 $20,000.00 $20,000.00 $15,385.00 $15,385.cc $10,000.00 $10,000.00 29 FURNISH& INSTALL TRAFFIC CONTROL IS 1 $I5,000.00 $15,000.00 $4,500.00 $4,500.00 $S,SOSAO $S,SO8A0 $5,000.00 $5,000.00 30 IFURNISH AND INSTALLTEMPORARY CONSTRUCTION FENCE LF 200 1 $25.0DI $5,000.001 $5.00 $IoODD.001 $27.541 S5,508.W1 $20.00 $4,000.00 31 IMaterialsTesting IS 1 1 $4,500.001 $4,500.001 $2,500.001 $2,50O.G01 $4,389.001 $20,DDO.00 $20,000.00 Indicates error on bid form TOTAL-1 $385,730.00 $406,555.00 $437,461.54 $516,834.00 Page 2 of 2 Exhibit A I A rantham & sucinh•>, Inc. Clrll Enyre a.�..; March 13, 2023 Mr. Justin Clay. City of Anna 3223 North Powell Pad way Anna, TX 75409 G&A No. 1448-22 Re: Downtonv Rrater & Sanitary Lnprovementa —Phase 1 Recommendation of Award to Canary Construction, Inc Dear lit. Clay: On Friday, March 10, 2023, the City of Anna publicly opened 7 bids for the abose referenced pmject- Grantham & Associates Inc. (G&A) tabulated the bids (see attacked bid tabulation) and the results are summarized below. ComnmvNante Total Bid 1. Canary Construction $ 325333.OD 2. A&M Construction $ 332,73650 3- Hayes Construction $ 359,790.DD 4. Thomas B Decxlopment $ 385,730.00 5. Dickerson Construction $ 406,555.00 6. J&I. Conrtaction $ 437,4451.54 7. A6dm Brother Equipment $ 516,834.00 Canary Construction. Inc. was the low bidder with a bid of $325,333. Canary Construction has successfully completed a previous project for Grantham & Associates. In addition, the refereaces £or Canary Construction, Inc. provided positive comments. Consegnently, we recommend that the City award the subjectpmject to Canary Construcaml, Inc- in the amount of $325333-00- Please contact me if you need my additional information- q/S/�/i/nn/cerely, 0-Z— Molly Pierson, PE. Attachment t::.naoocs•vxor�.rs.uaaa-.e-===c_ +� es:ak�ec.>a a s� s.�;�<-.�n•c,mas r.r�m.e®ea ma+e c�u.rru ti -aa� Bid T.W.O. D4 Mmn Water& Saowq' ImPauvemems-Phan1 CitYMA.a Me,& 10, 2023 En&inw.Eatanate I Canaryi:,,Pa Uon I Hayw C4luVuction ITEM NO. DESCRIP"I UNIT BIDTOTAL UNITCOST TOTALCOST UNITCOST TOTALCOST UNITCOST TOTAL COST UNITCOST TOTAL COST 1 SAWCUT,REMOVE& DISPOSE CONCRETE DRIVEWAY PAVEMENT SY 21 530M SMM 575A0 $1,575.00 SQm SSQm S140D0 S2,9441D0 2 AWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT SY 201 S"m 56A30.DO ST5A0 S1$,0]SDO SMM 57,035.00 545M 59,045➢0 3 REMOVE& DISPOSE GRAVEL DRPE AY SY 10 $10A0 5100.00 SSSAO $550.00 54100 5420.00 530.00 SEMM 4 FURNISH& INSTALL ASPHALT PAVEMENT L2'TYPE D&V WK B) w 201 S6100 S12,Ofi0.00 SwM SIBUIstom $80.D0 516,08000 $1OSM 521,105A0 5 fU NSW IS, INSTALLCONCRETE DRIVEWAY 4, WKI SY 21 565.00 SI-3issm S90A0 $ 690.w $150.00 $3,150.00 5160A0 53,36DA0 6 FURNISH&INnALLGMVELDRNEWAY SY w 59 M SdMm SIOAO 54Wm 550.00 $500.00 S6O00 SBOOD0 7 REMOVE&DISPOSEMANHOM G 1 SIM000 SIAMM SS,OOOAO S1,OOODO SL,&50.00 51,850.00 52.200D0 $2,200.00 & FURNWI&INSTALL WATER 6'DR-]&NC 9 S 575.00 5375. 5650A0 53250.OD $105,00 5525A0 5450A0 $;250m) 9 FWNW& INSTALLWATER I0WERING 6• DR-3 PVC IE 20 58 m SLEMM S420-00 59400A0 S227A0 54,SWM 52SD00 SS.OW-00 30 FURNLSH&INSTALLWATERB'DR-18NC U 1165 SSSAO 5107,525M SBSAO Sw7 s S79A0 $99,935.00 $9000R527 DD li FURNISH&INSTALL WATER I0WER0468•DR-1B PVC IF 60 $95.00 55,700. 5320A0 519200= S26S.00 S15yWA0 S125A0AD 12 FURNSH & INSTALL WATER 12• DR-18 PYC LL 13 S13S.00 51,495.00 S420A0 $5 460.D0 5326.00 51,63RLD 5230.00AO 13 FURNISH INSTALL DUCTILE IRON FITTINGS IN 0AS 5600.00 SS,IOO 515000A0 $ 150A0 $9,980A0 S7.S65.00 520,000.000A0 14 FURNISH &INSTALLe•ae•TAPPING SLEEVE&VALVE FA 1 56000.00 56000 $6500A0 $650000 $6 T78.00 S6 TYBIM) 59,500.00-00 ]5 FURNISH ANDIN9TALL fi•INSERT-A-VALVE FA 1 $35,000.00 515,000 $7,SOO.W $] OOAO 510.36200 510,362.00 513p00.000-00 16 FURNISHANDINSTALL8•GATEVAI.W FA ] 53,000.00 $21,000. $2,SWM S37,SOOAO $2,369.00 516,593M 53,900M0TD 17 FURNISH AND INSTALL 32. OATE VALVE EA 1 S650D.00 S6,sm $4 .00 54500O0 $3,080.00 $3,8B0.0O $5 0.00DOIB FURNISH& INSTALL FIRE HYDRANT WITH 6-VALVE&6•LEAD EA 3 $5000.00 S15,D00. S7,1U0A0 523400.D0 $R 183110 Si5449110 59,500w0A019 FURNISH& INSTALL I• WATER SERWCE FA 4 SL600.O0 57,200. $1500.00 56000A0 5 430.00 597wOO 51,900.00OM]O LOCATE AND CONNECTTO EN WATER ONSW CORNER OF HAND RIG001S U 1 520000.00 Sw.(00. 52,200A0 52,200.DO $626100 $6 61D0 54,500A00.00 21 TRENCH SSFETY(FOR WATER) LL 1350 SLOO 52,700 52.00 52,700.00 SI $1,6B750 53.00 S4,OSOM 22 FURNISH III INSTALL SANITARY SEWER I0'PVC MR-26 ASTM 0M34 IF i36 $100.00 SU 600 S125A0 527,000.00 5119.00 51$704M 595M 520,520= 23 FURNISH IS INSTALL SANITARY SEWER MANHOLE W DIA EA I $7,000.00 57,000. 58,50OA0 58,500.00 S9.Mwl 59,3SDm, SB,BO0A0 58.sww 24 OONNER IT PVC SANITARY SEWER TO OUSTING MANHOLE EA 1 SWO.00 SS00. 51.520M $ 520.00 51,950.00 5 0W) $9j00A0 59,500.00 25 FULL IJW&INnABYPASS PUMPING LS 1 57,500.00 S7,S00. $5,500.00 SS,SOOAO $1100000 $12AOU.00 59mom $9,00000 16 TRENCHSSFETY)FORSEWER) LF 216 5IM 543104 SIMI $648.00 51.50 S324D0 SSM $I,= wo v EROSION CDNTROL U 1 55000.00 SS,Om 51,500.00 51,SOOA0 57920.00 S] 20DD 52,SOD" S2 -00 2R MOBRIZATION IS 1 SS5,000A0 SIS,OOD $6pWA0 56,000A0 $15,500-00 515,SOOAO SI7,OOODO $17,DOOD0 29 FUINISH&INSMLLIRAFFlCC0NTN0L LS I S7,S0D.00 SliaM SIMOMJ 53,000AD 5105600 S1D,S60L0 53JMW S3.00OD0 30 FURNISHANDIWAUT P0MRYC0NSTRUCTTONF M IF 200 S20A0 S2,000. SISMI $3,OOOD0 51350 $21O0MI $ISM 53.ODO 0 31 Materials Testing U 1 SI2mD.00 SIZ000.001 53,200-00 $3,200A0 $6,000AO SCAM= 521000.00 52,000.00 TOTAU $315.31100 $325,333.00 533yT3650 5359,790.00 IMlates..4n &N N. BiOTabulauun Downtown Waw & Sanitary improvements -Phase 1 CRY of Anna Murc 10. 2023 ThemuIIDwebpmeu I Di .MnCo irfion I J&LCo Iaion I Atkins Bros E47077 ITEM NO. DESCRIPTION UNIT BIDTOTAL UNRCOST TDTAL COST UNITCOST TOTAL COSY UNOCOST TOTAL COST UNIT CO ST TOTAL COST 1 SAWCUT, REMOVE & DISPOSE CONCRETE DRIVEWAY PAVEMENT SY 21 SIOOD0 $2,300.00 52500 5525.00 S373.86 $3,651.06 S116UD $2,436A0 2 SAWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT SY 201 S50.00 S10,050.00 S15.00 $3,01500 54L48 S8,337.48 S116.0D S23,31600 3 REMOVE& DISPOSE GRAVEL DRIVEWAY SY 10 S300.00 53,000.00 SS0.00 SSODDO S172.SD $1,725.00 S750D S150.00 4 FURNISH& INSTALL ASPHALT PAVEM ENT 12"TYPE D&6"TYPE B SY 201 550.Go 51050.DO $120.00 $24,220.00 SIU-92 S23 0232 S]0.00 S34,070DO 5 FURNISH& INSTALL CONCRETE DRIVEWAY 14,000 PSI SY 11 S375.00 57,87S.OG S150.00 S3,1S0.00 $175.66 S3,69306 S300.00 S613M 6 FURNISH& INSTALL GRAVEL ORNEWAY SY 30 SIDI 51,00000 5100.00 51,000.00 S316-M $3,160-00 S60JM S60000 7 REMOVE& DISPOSE MANHOLE EA L S1,20000 51,20000 $2,000.GO S2,M000 $3,0]9.00 S3,079.00 $2,19000 S2.19000 B FURNISH& INSTALLWATER6'Mill PVC LF 5 $103.00 S51500 SISDDO 5750.00 5255.00 $1,275 S350.00 5750.00 9 FURNISH& INSTALLWATER LOWERING 6• DR.18 PVC 1F 20 5103.00 S2,060D0 $25000 S5,000 Go SI6335 S3,20 520OD0 S4,00000 10 FURNISH & INSTALLWATER 8' DR-18 PVC LF 1265 597.00 S122.705.00 513500 S170,M.00 S13438 SL69,990.70 SI5000 5189,75000 11 FURNLSH& INSTALLWATER LOWERING 8' OR -IS PVC LF 60 S340.00 S 400.00 5275M 516500.00 Sm-28 S1O,996.8 S200.00 512,00000 12 FURNISH& INSTALLWATER n• DR-28 PVC LF 13 5125.00 S3,62500 S30000 $3900.00 527"1 S3,59203 $3,500.00 595500.00 13 FURNISH& INSTALL DUCTILE IRON FITTINGS TN DAS S11,OODw S9 50.00 S23.00000 $19550.00 S2 460.OD 518 41.00 $5,00000 S425000 14 FURNISH &INSTALL 8"ae' TAPPING SLEEVE&VALVE EA I S5,400.00 S5,400.00 56,000.00 56'm 0 510,10m $10103.00 Sl 00.00 5 30GD0 15 FURNISH AND INSTALL 6' INSERT-MVALVE EA L S8,600.00 $8 00.00 $9,50D.00 S9.50000 S33,646.G0 S13,646.00 $10,000.00 S10,ODO00 16 FURNISH AND INSTALL B^GATE VALVE FA 7 53,500.00 $24,500.00 $3,500D0 $1],50000 $4,13150 $28,9203 $2$OGAO $1],50000 17 FURNISH ANDINSTALL I2"GATE VALVE EA 1 56,900.00 $6,900.00 S3,50O.00 S3 00 S6,76900 $6,76900 54,500.DO $4jWM IB FURNISH &INSTALL FIRE HYDRANT WITH 6•VALVE &b•IEAO FA 3 S8,800.00 $26400.00 58,00000 524,OW.00 58,966.67 526y00.01 5]p00.D0 52y000.00 19 FURNISH &INSTALL I'WATER SERVICE EA 9 51,075.00 543G0.00 52�00.00 58,400.00 51,9%50 5],78& $4,500.00 $18,00000 20 LOCATE AND CONNECT TO EX WATE R ON SW CORNER OF 7TH AND RIGGINS u I SI 800.00 $L800.PD S6.SWW SGM.W S3,4S9.D0 S3,489 SL028D0 51A211 21 SAFETY(FOR WATER) LF 050 $6.00 53,100.00 SLOG 51,350.00 52.11 52,8483 S300 51,350.00 22 FURNISH&INSTALLSANITARY SEWER SO•PVC SOR-26 ASTM 03034 IF 216 S325.00 $27,000.00 516500 535,640.00 SSOI36 Sn'l,hs36 5250.00 S54.mm 23 FURNISH& INSTALL SANITARY SEWER MANHOLE 4' DIA EA 1 S95OU.00 59 110 S7,SO0.00 $7,50000 511,061DO Sll.061A0 5150000D S15 DO 24 CONNECT IW PVC SANITARY SEWER TO EXISTING MANHOLE EA 1 51,200.00 51 00.00 SL000.OD 51,000.00 S2,739.00 $2,739.00 51,028.00 51,02300 25 FURNISH& INSTALL BYPASS PUMPING LS 1 S ODOAO 512,000.00 54,900.00 S4,800.00 SE,28Lo0 $6,292D0 S25,000.0D 525,0011 26 TRENCHSAFETY(FORSEWER) LF 216 S25.00 SS,400.00 SS.00 51,08000 S3.62 $78132 $too $216J10 27 EROSION CONTROL LS I 55000.00 55,000.00 51,000.00 S1,00I 57,278.00 $] 78.00 52000.OD S2,000D0 28 MOBILIZATION LS 1 S35000.00 $3500) 520 .00 5200011 515,385.00 $15,385.00 $10,000.00 S10,00000 29 FURNISH&INSTALLTRAFFICCONTROL 15 1 SIS,ODD.00 S1S,000D0 $4,500.00 S4,50000 S5,SU8.00 $5.508.00 55.000.00 SS,000.00 30 FURNISHANDINSTALLTEMPO RYCONSLGUCTIONFENCE LF 200 S25.00 SS,000DO S5D0 SI,GOO.00 SZ75 $5,508.00 S2000 S4,000DO 31 MuerieU TevIng LS 1 S4.SOD.00 54,500.00 52,SO000 $2.SO0.00 S4,38900 54,38900 S20,00000 $2Q000DO TOTALs1 5385.730.00 5406,SS9.00 5437,461.54 SS16A3400 hwfl eu umr. bH form