HomeMy WebLinkAboutRes 2023-03-1404 Awarding Phase 1 Downtown Utility Rehabilitation Project to Canary ConstructionCITY OF ANNA, TEXAS
RESOLUTION NO. 24 ;Z-3 - O'3 -- 14o�4
A RESOLUTION OF THE CITY OF ANNA, TEXAS AWARDING THE BID FOR PHASE
1 OF THE DOWNTOWN UTILITY REHABILITATION PROJECT TO CANARY
CONSTRUCTION, INCORPORATED IN THE AMOUNT NOT TO EXCEED THREE
HUNDRED SIXTY FIVE THOUSAND THREE HUNDRED THIRTY THREE DOLLARS
($365,333.00); AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Downtown Utility Rehabilitation Project is identified as a capital utility
project in the City of Anna, Texas; and,
WHEREAS, multiple water and sanitary sewer utilities in the downtown area have been
identified as being in poor condition and the City of Anna is seeking to complete major
rehabilitation of the system; and,
WHEREAS, the City of Anna publicly advertised the phase 1 portion of the project and
open bids in accordance with Texas Local Government Code; and,
WHEREAS, the lowest qualified bid was received from Canary Construction,
Incorporated in the amount of $325,333 as shown in Exhibit A, attached; and,
WHEREAS, the City will include $40,000 in contingency funds for the construction project
to provide funding only to be spent when required for unforeseen changes to the project
scope which may be necessary during construction; and.
WHEREAS, the project funding will come from the Coronavirus State and Local Fiscal
Recovery Funds received from the Federal Government in accordance with the Fiscal
Year 2022-2023 Budget; and,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ANNA, TEXAS THAT:
Section 1. Recitals Incorporated
The recitals above are incorporated herein as if set forth in full for all purposes.
Section 2. Authorization of Payment and Funding.
That the City Council of the City of Anna hereby awards the project to Canary
Construction, Incorporated, and authorizes the City Manager to execute a construction
contract in a form approved by the City Attorney, in an amount not to exceed $365,333.00
to Canary Construction, Incorporated for the Phase 1 Downtown Utility Rehabilitation
Project.
That funding for the project shall come from the State and Local Coronavirus Fiscal
Recovery Funds.
PASSED AND APPROVED by the City Council of the City of Anna, Texas on this 2 S}�
day of March 2023.
ATTEST:
121Yh 1�L�`
City Secretary, Carrie Land
APPROVED:
* ayor, Nate Pike
* THE CITY OF
Anna
TEXAS
* 1913
Phase 1 of Downtown Utility Relocate
9
do
fir. aJ.Almij
I
8-inch Sewer
R
8-inch Water
' t
�IGrantham & Associates, Inc.
Civil Engineering & Surveying
March 13, 2023
Mr. Justin Clay
City of Anna
3223 North Powell Parkway
Anna, TX 75409
G&A No. 1448-22
Re: Downtown Water & Sanitary Improvements — Phase 1
Recommendation of Award to Canary Construction, Inc.
Dear Mr. Clay:
On Friday, March 10, 2023, the City of Anna publicly opened 7 bids for the above referenced project.
Grantham & Associates, Inc. (G&A) tabulated the bids (see attached bid tabulation) and the results are
summarized below.
Company Name
Total Bid
1. Canary Construction
$
325,333.00
2. A&M Construction
$
332,736.50
3. Hayes Construction
$
359,790.00
4. Thomas II Development
$
385,730.00
5. Dickerson Construction
$
406,555.00
6. J&L Construction
$
437,461.54
7. Atkins Brother Equipment
$
516,834.00
Canary Construction, Inc. was the low bidder with a bid of $325,333. Canary Construction has
successfully completed a previous project for Grantham & Associates. In addition, the references for
Canary Construction, Inc. provided positive comments. Consequently, we recommend that the City
award the subject project to Canary Construction, Inc. in the amount of $325,333.00.
Please contact me if you need any additional information.
Sincerely,
11 vt�—
Molly Pierson, P.E.
Attachment
H:\WPD0CS\PR0JECTS\ANNA\1448-22 2022 Anna Downtown Water & Sanitary Sewer Improvements\Contractor
Recommendation Ph I\1448 Contractor Recommendation.docx
Bid Tabulation
Downtown Water & Sanitary Improvements - Phase 1
City of Anna
March 10, 2023
Engineer's Estimate Canary Construction I ARM Construction Hayes Construction
ITEM NO.
DESCRIPTION
UNIT
BIDTOTAL
UNITCOST
TOTALCOST
UNITCOST
TOTALCOST
UNITCOST
TOTALCOST
UNITCOST
TOTAL COST
1
SAWCUT, REMOVE & DISPOSE CONCRETE DRIVEWAY PAVEMENT
SY
21
$30.00
$630.00
$75.00
$1,575.00
$40.00
$840.00
$140.00
$2,940.00
2
SAWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT
SY
201
$30.00
$6,030.00
$75.00
$15,075.D0
$35.00
$7,035.00
$45.00
$9,045.00
3
REMOVE& DISPOSE GRAVEL DRIVEWAY
SY
10
$10.00
$100.G0
$55.00
$550.00
$42.00
$420.00
$30.00
$300.00
4
FURNISH& INSTALL ASPHALT PAVEMENT (2"TYPE D&6"TYPE B)
SY
201
$60.00
$12,060.00
$90.00
$18,090.Do
$80.00
$16,080.00
$105.00
$21,105.00
5
FURNISH& INSTALL CONCRETE DRIVEWAY(4,000 PSI)
SY
21
$65.00
$1,365.00
$90.00
$1,890.00
$150.00
$3,150.00
$160.00
$3,360.00
6
FURNISH& INSTALL GRAVEL DRIVEWAY
SY
10
$40.00
$400.00
$40.00
$400.00
$50.00
$500.00
$60.00
$600.00
7
REMOVE & DISPOSE MANHOLE
EA
1
$1,000.00
$1,000.00
$1,000.00
$1,000.D0
$1,850.00
$1,850.00
$2,200.00
$2,200.00
8
FURNISH & INSTALL WATER 6" DR-18 PVC
LF
5
$75.00
$375.00
$659.00
$3,250.00
$105.00
$525.00
$450.00
$2,250.00
9
FURNISH& INSTALL WATER LOWERING 6"DR-18 PVC
LF
20
$80.00
$1,600.00
$420.00
$8,400.00
$227.00
$4,540.00
$250.00
$5,000.00
SO
FURNISH & INSTALL WATER B" DR-18 PVC
LF
1265
$85.00
$107,525.00
$85.00
$107,525.001
$79.00
$99,935.00
$90.00
$113,850.00
11
FURNISH& I NSTALL WATER LOWERING 8"DR-18 PVC
LF
60
$95.00
$5,700.00
$329.00
$19,200.00
$265.00
$15,900.00
$125.00
$7,500.00
12
FURNISH & INSTALL WATER 12" DR-18 PVC
LF
13
$115.00
$1,495.00
$420.OD
$5,460.DO
$126.00
$1,638.00
$230.00
$2,990.00
13
FURNISH & INSTALL DUCTILE IRON FITTINGS
TN
0.85
$6,000.00
$5,100.00
$15,000.00
$12,750.00
$8,900.00
$7,565.00
$20,000.00
$17,ODO.00
14
FURNISH & INSTALL 8"x8"TAPPING SLEEVE &VALVE
EA
1
$6,000.00
$6,000.00
$6,500.00
$6,500.00
$6,778.00
$6,778.00
$9,500.00
$9,500.00
15
FURNISH AND INSTALL 6"INSERT-A-VALVE
EA
1
$15,000.00
$15,000.00
$7,500.00
$7,500.00
$10,362.00
$10,362.00
$13,000.00
$13,000.00
16
FURNISH AND INSTALL B"GATE VALVE
EA
7
$3,000.00
$21,000.00
$2,500.00
$17,500.00
$2,369.00
$16,583.00
$3,900.00
$27,300.00
17
FURNISH AND INSTALL 12" GATE VALVE
EA
1
$6,500.00
$6,500.00
$4,500.00
$4,500.00
$3,880.00
$3,880.00
$5,800.00
$5,800.00
18
FURNISH& INSTALL FIRE HYDRANT WITH 6" VALVE & 6" LEAD
EA
3
$5,000.00
$15,000.00
$7,800.00
$23,400.00
$8,483.00
$25,449.00
$9,500.00
$28,500.00
19
FURNISH & INSTALL S"WATER SERVICE
EA
4
$1,800.00
$7,200.00
$1,500.00
$6,000.00
$2,430.00
$9,720.00
$1,9D0.00
$7,600.00
20
LOCATE AND CONNECT TO EX WATER ON SW CORNER OF 7TH AND RIGGINS
LS
1
$20,000.00
$20,000.00
$2,200.00
$2,200.00
$6,262.00
$6,261.00
$4,500.00
$41500.00
21
TRENCH SAFETY (FOR WATER)
LF
1350
$2.00
$2,700.00
$2.00
$2,700.00
$1.25
$1,687.50
$3.00
$4,050.00
22
FUFIN ISH& INSTALL SANITARY SEWER 10" PVC SDR-26 ASTM D3034
LF
216
$100.00
$21,600.00
$125.00
$27,000.00
$119.00
$25,7G4.00
$95.00
$20,520.00
23
FUFINISH & INSTALL SANITARY SEWER MANHOLE 4'DIA
EA
1
$7,OD0.00
$7,000.00
$8,500.OD
$8,500.00
$9,380.00
$9,390.00
$8,800.00
$8,800.00
24
CONNECT I0" PVC SANITARY SEWER TO EXISTING MAN HOLE
EA
1
$SD0.00
$500.00
$1,520.00
$1,520.00
$1,950.00
$1,950.00
$4,500.00
$4,500.00
25
FURNISH& INSTALL BYPASS PUMPING
LS
1
$7,500.00
$7,500.00
$5,500.00
$5,500.00
$12,000.00
$12,000.00
$9,000.00
$9,000.00
26
TRENCH SAFETY (FOR SEWER)
LF
216
$2.00
$432.OD
$3.00
$648.00
$1.50
$324.00
$5.00
$1,080.00
27
EROSION CONTROL
LS
1
$5,000.00
$5,000.00
$1,500.00
$1,500.00
$7,920.00
$7,920.D0
$2,500.00
$2,500.00
28
MOBILIZATION
LS
1
$351000.00
$15,000.00
$6,000.00
$6,000.00
$15,500.00
$15,500.00
$17,000.00
$17,000.00
29
FURNISH&INSTALL TRAFFIC CONTROL
LS
1
$7,SD0.00
$7,500.G0
$3,000.00
$3,000.00
$10,560.00
$10,560.00
$3,O0O.OD
$3,000.00
30
FU FINISH AND INSTALL TEMPORARY CONSTRUCTION FENCE
LF
200
$10.00
$2,000.00
$I5.00
$3,000.00
$13.50
$2,700.00
$15.00
$3,000.00
31
Materials Testing
L5
1
$12,000.00
$12,000.00
$3,200.ODI
$3,200.001
$6,000.001
$6,000.001
$2,000.001
$2,000.00
Indicates error on bid form
TOTAL-1 $315,312.00 $325,333.00 $332,736.50 $359,790.00
Page 1 of 2
Bid Tabulation
Downtown Water & Sanitary Improvements- Phase 1
City of Anna
March 10, 2023
Thomas 11 Development I Dickerson Construction I 1&L Construction I Atkins Bros. Equip.
ITEM NO.
DESCRIPTION
UNIT
BIDTOTAL
UNITCOST
TOTALCOST
UNIT COST
TOTALCOST
UNIT COST
TOTALCOST
UNIT COST
TOTALCOST
1
SAWCUT, REMOVE & DISPOSE CONCRETE DRIVEWAY PAVEMENT
SY
21
$100.00
$2,100.00
$25.00
$525.00
$173.86
$3,651.06
$116.00
$2,436.00
2
SAWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT
SY
201
$50.00
$10,050.00
$15.00
$3,015.00
$41.48
$8,337.48
$116.00
$23,316.00
3
REMOVE & DISPOSE GRAVEL DRIVEWAY
SY
30
$300.00
$3,000.00
$50.00
$500.00
$172.50
$1,725.00
$75.00
$750.00
4
FURNISH& INSTALL ASPHALT PAVEMENT (2" TYPE D & 6" TYPE B)
SY
202
$50.00
$10,05D.00
$120.00
$24,120.00
$118.92
$23,902.92
$70.00
$14,070.00
5
FURNISH & INSTALL CONCRETE DRIVEWAY(4,00D PSI)
SY
21
$375.00
$7,875.00
$150.00
$3,150.00
$175.86
$3,693.06
$300.00
$6,300.00
6
FURNISH& INSTALL GRAVEL DRIVEWAY
SY
10
$100.00
$1,000.00
$100.00
$1,000.00
$316.00
$3,160.00
$60.00
$600.00
7
REMOVE& DISPOSE MANHOLE
EA
1
$1,200.00
$1,200.00
$2,000.00
$2,000.00
$3,079.00
$3,079.00
$2,190.00
$2,190.00
8
FURNISH & INSTALL WATER 6" OR-18 PVC
LF
5
$103.00
$515.00
$150.00
$750.00
$255.00
$1,275.00
$150.00
$750.00
9
FURNISH & INSTALL WATER LOWERING 6" OR-18 PVC
LF
20
$103.00
$2,060.00
$250.00
$5,000.00
$163.35
$3,267.00
$200.00
$4,000.00
10
FURNISH & INSTALL WATER 8" DR-18 PVC
LF
1265
$97.G0
$122,705.00
$135.00
$170,775.00
$134.38
$169,990.70
$I5G.00
$189,750.00
11
FURNISH& INSTALL WATER LOWERING 8"DR-18 PVC
LF
60
$140.00
$8,400.00
$275.00
$16,500.00
$183.28
$10,996.80
$200.00
$12,000.00
12
FURNISH & INSTALL WATER 12" OR-18 PVC
LF
13
$125.00
$1,625.00
$300.00
$3,900.00
$276.31
$3,592.03
$3,500.D0
$45,500.00
13
FURNISH & INSTALL DUCTILE IRON FITTINGS
TN
0.85
$11,000.00
$9,350.00
$23,000.00
$19,550.00
$21,460.00
$18,241.00
$5,000.DO
$4,250.DD
14
FURNISH & INSTALL 8"x8" TAPPING SLEEVE & VALVE
EA
1
$5,400.00
$5,400.00
$6,D00.00
$6,000.00
$10,103.00
$10,103.00
$1,300.00
$1,300.00
15
FURNISH AND INSTALL 6"INSERT-A-VALVE
EA
1
$8,800.00
$8,800.00
$9,500.00
$9,500.00
$13,646.00
$13,646.00
$10,000.00
$10,000.06
16
FURNISH AND INS TALL 8" GATE VALVE
EA
7
$3,500.00
$24,500.00
$2,500.00
$17,500.00
$4,131.50
$28,920.50
$2,500.00
$17,500.00
17
FURNISH AND INSTALL 12" GATE VALVE
EA
1
$6,900.00
$6,900.00
$3,500.00
$3,500.00
$6,769.00
$6,769.00
$4,500.00
$4,500.06
SB
FURNISH & INSTALL FIRE HYDRANT WITH 6" VALVE & 6" LEAD
EA
3
$8,800.00
$26,400.00
$8,000.00
$24,000.00
$8,966.67
$26,900.01
$7,000.00
$21,000.00
19
FURNISH & INSTALL 1" WATER SERVICE
EA
4
$1,075.00
$4,300.00
$2,100.00
$8,400.00
$1,946.50
$7,786.00
$4,500.00
$18,000.00
20
LOCATE AN D CONNECT TO EX WATER ON SW CORNER OF 7TH AN D BIGGINS
LS
1
$1,800.00
$1,800.00
$6,500.00
$6,500.00
$3,489.00
$3,489.00
$1,028.OD
$1,028.D0
21
TRENCH SAFETY (FOR WATER)
LF
1350
$6.00
$8,100.00
$1.00
$1,350.00
$2.11
$2,848.50
$1.00
$1,350.06
22
FURNISH& INSTALL SANITARY SEWER 10" PVC SDR-26 ASTM D3034
LF
216
$125.00
$27,000.00
$165.00
$35,640.00
$107.16
$23,146.56
$250.GD
$54,000.00
23
FURNISH& INSTALL SANITARY SEWER MANHOLE 4'DIA
EA
1
$9,500.00
$9,500.00
$7,500.00
$7,5DO.00
$11,061.00
$11,061AD
$15,000.00
$15,000.G0
24
CONNECT I0" PVC SANITARY SEWER TO EXISTING MAN HOLE
EA
1
$1,200.00
$1,200.00
$1,000.00
$1,000.00
$2,739.DO
$2,739.00
$1,028.00
$1,028.00
25
FURNISH& INSTALL BYPASS PUMPING
LS
1
$12,000.00
$12,000.00
$4,800.00
$4,800.00
$6,292.00
$6,292.0D
$25,000.00
$25,000.00
26
TRENCH SAFETY (FOR SEWER)
LF
216
$25.00
$5,400.00
$5.00
$1,080.00
$3.62
$781.92
$1.00
$216.00
27
EROSION CONTROL
LS
1
$5,000.00
$5,000.00
$1,DDO.00
$1,0D0.00
$7,278.00
$7,278.00
$2,DDO.00
$2,000.00
28
MOBILIZATION
LS
1
$35,000.00
$35,000.00
$20,000.00
$20,000.00
$15,385.00
$15,385.cc
$10,000.00
$10,000.00
29
FURNISH& INSTALL TRAFFIC CONTROL
IS
1
$I5,000.00
$15,000.00
$4,500.00
$4,500.00
$S,SOSAO
$S,SO8A0
$5,000.00
$5,000.00
30
IFURNISH AND INSTALLTEMPORARY CONSTRUCTION FENCE
LF
200
1 $25.0DI
$5,000.001
$5.00
$IoODD.001
$27.541
S5,508.W1
$20.00
$4,000.00
31
IMaterialsTesting
IS
1
1 $4,500.001
$4,500.001
$2,500.001
$2,50O.G01
$4,389.001
$20,DDO.00
$20,000.00
Indicates error on bid form
TOTAL-1 $385,730.00 $406,555.00 $437,461.54 $516,834.00
Page 2 of 2
Exhibit A
I A
rantham & sucinh•>, Inc.
Clrll Enyre a.�..;
March 13, 2023
Mr. Justin Clay.
City of Anna
3223 North Powell Pad way
Anna, TX 75409
G&A No. 1448-22
Re: Downtonv Rrater & Sanitary Lnprovementa —Phase 1
Recommendation of Award to Canary Construction, Inc
Dear lit. Clay:
On Friday, March 10, 2023, the City of Anna publicly opened 7 bids for the abose referenced pmject-
Grantham & Associates Inc. (G&A) tabulated the bids (see attacked bid tabulation) and the results are
summarized below.
ComnmvNante
Total Bid
1. Canary Construction
$
325333.OD
2. A&M Construction
$
332,73650
3- Hayes Construction
$
359,790.DD
4. Thomas B Decxlopment
$
385,730.00
5. Dickerson Construction
$
406,555.00
6. J&I. Conrtaction
$
437,4451.54
7. A6dm Brother Equipment
$
516,834.00
Canary Construction. Inc. was the low bidder with a bid of $325,333. Canary Construction has
successfully completed a previous project for Grantham & Associates. In addition, the refereaces £or
Canary Construction, Inc. provided positive comments. Consegnently, we recommend that the City
award the subjectpmject to Canary Construcaml, Inc- in the amount of $325333-00-
Please contact me if you need my additional information-
q/S/�/i/nn/cerely,
0-Z—
Molly Pierson, PE.
Attachment
t::.naoocs•vxor�.rs.uaaa-.e-===c_ +� es:ak�ec.>a a s� s.�;�<-.�n•c,mas
r.r�m.e®ea ma+e c�u.rru ti -aa�
Bid T.W.O.
D4 Mmn Water& Saowq' ImPauvemems-Phan1
CitYMA.a
Me,& 10, 2023
En&inw.Eatanate I Canaryi:,,Pa Uon I Hayw C4luVuction
ITEM NO.
DESCRIP"I
UNIT
BIDTOTAL
UNITCOST
TOTALCOST
UNITCOST
TOTALCOST
UNITCOST
TOTAL COST
UNITCOST
TOTAL COST
1
SAWCUT,REMOVE& DISPOSE CONCRETE DRIVEWAY PAVEMENT
SY
21
530M
SMM
575A0
$1,575.00
SQm
SSQm
S140D0
S2,9441D0
2
AWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT
SY
201
S"m
56A30.DO
ST5A0
S1$,0]SDO
SMM
57,035.00
545M
59,045➢0
3
REMOVE& DISPOSE GRAVEL DRPE AY
SY
10
$10A0
5100.00
SSSAO
$550.00
54100
5420.00
530.00
SEMM
4
FURNISH& INSTALL ASPHALT PAVEMENT L2'TYPE D&V WK B)
w
201
S6100
S12,Ofi0.00
SwM
SIBUIstom
$80.D0
516,08000
$1OSM
521,105A0
5
fU NSW IS, INSTALLCONCRETE DRIVEWAY 4, WKI
SY
21
565.00
SI-3issm
S90A0
$ 690.w
$150.00
$3,150.00
5160A0
53,36DA0
6
FURNISH&INnALLGMVELDRNEWAY
SY
w
59 M
SdMm
SIOAO
54Wm
550.00
$500.00
S6O00
SBOOD0
7
REMOVE&DISPOSEMANHOM
G
1
SIM000
SIAMM
SS,OOOAO
S1,OOODO
SL,&50.00
51,850.00
52.200D0
$2,200.00
&
FURNWI&INSTALL WATER 6'DR-]&NC
9
S
575.00
5375.
5650A0
53250.OD
$105,00
5525A0
5450A0
$;250m)
9
FWNW& INSTALLWATER I0WERING 6• DR-3 PVC
IE
20
58 m
SLEMM
S420-00
59400A0
S227A0
54,SWM
52SD00
SS.OW-00
30
FURNLSH&INSTALLWATERB'DR-18NC
U
1165
SSSAO
5107,525M
SBSAO
Sw7 s
S79A0
$99,935.00
$9000R527
DD
li
FURNISH&INSTALL WATER I0WER0468•DR-1B PVC
IF
60
$95.00
55,700.
5320A0
519200=
S26S.00
S15yWA0
S125A0AD
12
FURNSH & INSTALL WATER 12• DR-18 PYC
LL
13
S13S.00
51,495.00
S420A0
$5 460.D0
5326.00
51,63RLD
5230.00AO
13
FURNISH INSTALL DUCTILE IRON FITTINGS
IN
0AS
5600.00
SS,IOO
515000A0
$ 150A0
$9,980A0
S7.S65.00
520,000.000A0
14
FURNISH &INSTALLe•ae•TAPPING SLEEVE&VALVE
FA
1
56000.00
56000
$6500A0
$650000
$6 T78.00
S6 TYBIM)
59,500.00-00
]5
FURNISH ANDIN9TALL fi•INSERT-A-VALVE
FA
1
$35,000.00
515,000
$7,SOO.W
$] OOAO
510.36200
510,362.00
513p00.000-00
16
FURNISHANDINSTALL8•GATEVAI.W
FA
]
53,000.00
$21,000.
$2,SWM
S37,SOOAO
$2,369.00
516,593M
53,900M0TD
17
FURNISH AND INSTALL 32. OATE VALVE
EA
1
S650D.00
S6,sm
$4 .00
54500O0
$3,080.00
$3,8B0.0O
$5 0.00DOIB
FURNISH& INSTALL FIRE HYDRANT WITH 6-VALVE&6•LEAD
EA
3
$5000.00
S15,D00.
S7,1U0A0
523400.D0
$R 183110
Si5449110
59,500w0A019
FURNISH& INSTALL I• WATER SERWCE
FA
4
SL600.O0
57,200.
$1500.00
56000A0
5 430.00
597wOO
51,900.00OM]O
LOCATE AND CONNECTTO EN WATER ONSW CORNER OF HAND RIG001S
U
1
520000.00
Sw.(00.
52,200A0
52,200.DO
$626100
$6 61D0
54,500A00.00
21
TRENCH SSFETY(FOR WATER)
LL
1350
SLOO
52,700
52.00
52,700.00
SI
$1,6B750
53.00
S4,OSOM
22
FURNISH III INSTALL SANITARY SEWER I0'PVC MR-26 ASTM 0M34
IF
i36
$100.00
SU 600
S125A0
527,000.00
5119.00
51$704M
595M
520,520=
23
FURNISH IS INSTALL SANITARY SEWER MANHOLE W DIA
EA
I
$7,000.00
57,000.
58,50OA0
58,500.00
S9.Mwl
59,3SDm,
SB,BO0A0
58.sww
24
OONNER IT PVC SANITARY SEWER TO OUSTING MANHOLE
EA
1
SWO.00
SS00.
51.520M
$ 520.00
51,950.00
5 0W)
$9j00A0
59,500.00
25
FULL IJW&INnABYPASS PUMPING
LS
1
57,500.00
S7,S00.
$5,500.00
SS,SOOAO
$1100000
$12AOU.00
59mom
$9,00000
16
TRENCHSSFETY)FORSEWER)
LF
216
5IM
543104
SIMI
$648.00
51.50
S324D0
SSM
$I,= wo
v
EROSION CDNTROL
U
1
55000.00
SS,Om
51,500.00
51,SOOA0
57920.00
S] 20DD
52,SOD"
S2 -00
2R
MOBRIZATION
IS
1
SS5,000A0
SIS,OOD
$6pWA0
56,000A0
$15,500-00
515,SOOAO
SI7,OOODO
$17,DOOD0
29
FUINISH&INSMLLIRAFFlCC0NTN0L
LS
I
S7,S0D.00
SliaM
SIMOMJ
53,000AD
5105600
S1D,S60L0
53JMW
S3.00OD0
30
FURNISHANDIWAUT P0MRYC0NSTRUCTTONF M
IF
200
S20A0
S2,000.
SISMI
$3,OOOD0
51350
$21O0MI
$ISM
53.ODO 0
31
Materials Testing
U
1
SI2mD.00
SIZ000.001
53,200-00
$3,200A0
$6,000AO
SCAM=
521000.00
52,000.00
TOTAU $315.31100 $325,333.00 533yT3650 5359,790.00
IMlates..4n &N N.
BiOTabulauun
Downtown Waw & Sanitary improvements -Phase 1
CRY of Anna
Murc 10. 2023
ThemuIIDwebpmeu I Di .MnCo irfion I J&LCo Iaion I Atkins Bros E47077
ITEM NO.
DESCRIPTION
UNIT
BIDTOTAL
UNRCOST
TDTAL COST
UNITCOST
TOTAL COSY
UNOCOST
TOTAL COST
UNIT CO ST
TOTAL COST
1
SAWCUT, REMOVE & DISPOSE CONCRETE DRIVEWAY PAVEMENT
SY
21
SIOOD0
$2,300.00
52500
5525.00
S373.86
$3,651.06
S116UD
$2,436A0
2
SAWCUT, REMOVE & DISPOSE ASPHALT PAVEMENT
SY
201
S50.00
S10,050.00
S15.00
$3,01500
54L48
S8,337.48
S116.0D
S23,31600
3
REMOVE& DISPOSE GRAVEL DRIVEWAY
SY
10
S300.00
53,000.00
SS0.00
SSODDO
S172.SD
$1,725.00
S750D
S150.00
4
FURNISH& INSTALL ASPHALT PAVEM ENT 12"TYPE D&6"TYPE B
SY
201
550.Go
51050.DO
$120.00
$24,220.00
SIU-92
S23 0232
S]0.00
S34,070DO
5
FURNISH& INSTALL CONCRETE DRIVEWAY 14,000 PSI
SY
11
S375.00
57,87S.OG
S150.00
S3,1S0.00
$175.66
S3,69306
S300.00
S613M
6
FURNISH& INSTALL GRAVEL ORNEWAY
SY
30
SIDI
51,00000
5100.00
51,000.00
S316-M
$3,160-00
S60JM
S60000
7
REMOVE& DISPOSE MANHOLE
EA
L
S1,20000
51,20000
$2,000.GO
S2,M000
$3,0]9.00
S3,079.00
$2,19000
S2.19000
B
FURNISH& INSTALLWATER6'Mill PVC
LF
5
$103.00
S51500
SISDDO
5750.00
5255.00
$1,275
S350.00
5750.00
9
FURNISH& INSTALLWATER LOWERING 6• DR.18 PVC
1F
20
5103.00
S2,060D0
$25000
S5,000 Go
SI6335
S3,20
520OD0
S4,00000
10
FURNISH & INSTALLWATER 8' DR-18 PVC
LF
1265
597.00
S122.705.00
513500
S170,M.00
S13438
SL69,990.70
SI5000
5189,75000
11
FURNLSH& INSTALLWATER LOWERING 8' OR -IS PVC
LF
60
S340.00
S 400.00
5275M
516500.00
Sm-28
S1O,996.8
S200.00
512,00000
12
FURNISH& INSTALLWATER n• DR-28 PVC
LF
13
5125.00
S3,62500
S30000
$3900.00
527"1
S3,59203
$3,500.00
595500.00
13
FURNISH& INSTALL DUCTILE IRON FITTINGS
TN
DAS
S11,OODw
S9 50.00
S23.00000
$19550.00
S2 460.OD
518 41.00
$5,00000
S425000
14
FURNISH &INSTALL 8"ae' TAPPING SLEEVE&VALVE
EA
I
S5,400.00
S5,400.00
56,000.00
56'm 0
510,10m
$10103.00
Sl 00.00
5 30GD0
15
FURNISH AND INSTALL 6' INSERT-MVALVE
EA
L
S8,600.00
$8 00.00
$9,50D.00
S9.50000
S33,646.G0
S13,646.00
$10,000.00
S10,ODO00
16
FURNISH AND INSTALL B^GATE VALVE
FA
7
53,500.00
$24,500.00
$3,500D0
$1],50000
$4,13150
$28,9203
$2$OGAO
$1],50000
17
FURNISH ANDINSTALL I2"GATE VALVE
EA
1
56,900.00
$6,900.00
S3,50O.00
S3 00
S6,76900
$6,76900
54,500.DO
$4jWM
IB
FURNISH &INSTALL FIRE HYDRANT WITH 6•VALVE &b•IEAO
FA
3
S8,800.00
$26400.00
58,00000
524,OW.00
58,966.67
526y00.01
5]p00.D0
52y000.00
19
FURNISH &INSTALL I'WATER SERVICE
EA
9
51,075.00
543G0.00
52�00.00
58,400.00
51,9%50
5],78&
$4,500.00
$18,00000
20
LOCATE AND CONNECT TO EX WATE R ON SW CORNER OF 7TH AND RIGGINS
u
I
SI 800.00
$L800.PD
S6.SWW
SGM.W
S3,4S9.D0
S3,489
SL028D0
51A211
21
SAFETY(FOR WATER)
LF
050
$6.00
53,100.00
SLOG
51,350.00
52.11
52,8483
S300
51,350.00
22
FURNISH&INSTALLSANITARY SEWER SO•PVC SOR-26 ASTM 03034
IF
216
S325.00
$27,000.00
516500
535,640.00
SSOI36
Sn'l,hs36
5250.00
S54.mm
23
FURNISH& INSTALL SANITARY SEWER MANHOLE 4' DIA
EA
1
S95OU.00
59 110
S7,SO0.00
$7,50000
511,061DO
Sll.061A0
5150000D
S15 DO
24
CONNECT IW PVC SANITARY SEWER TO EXISTING MANHOLE
EA
1
51,200.00
51 00.00
SL000.OD
51,000.00
S2,739.00
$2,739.00
51,028.00
51,02300
25
FURNISH& INSTALL BYPASS PUMPING
LS
1
S ODOAO
512,000.00
54,900.00
S4,800.00
SE,28Lo0
$6,292D0
S25,000.0D
525,0011
26
TRENCHSAFETY(FORSEWER)
LF
216
S25.00
SS,400.00
SS.00
51,08000
S3.62
$78132
$too
$216J10
27
EROSION CONTROL
LS
I
55000.00
55,000.00
51,000.00
S1,00I
57,278.00
$] 78.00
52000.OD
S2,000D0
28
MOBILIZATION
LS
1
S35000.00
$3500)
520 .00
5200011
515,385.00
$15,385.00
$10,000.00
S10,00000
29
FURNISH&INSTALLTRAFFICCONTROL
15
1
SIS,ODD.00
S1S,000D0
$4,500.00
S4,50000
S5,SU8.00
$5.508.00
55.000.00
SS,000.00
30
FURNISHANDINSTALLTEMPO RYCONSLGUCTIONFENCE
LF
200
S25.00
SS,000DO
S5D0
SI,GOO.00
SZ75
$5,508.00
S2000
S4,000DO
31
MuerieU TevIng
LS
1
S4.SOD.00
54,500.00
52,SO000
$2.SO0.00
S4,38900
54,38900
S20,00000
$2Q000DO
TOTALs1 5385.730.00 5406,SS9.00 5437,461.54 SS16A3400