HomeMy WebLinkAboutOrd 437-2009 Flood Damage Prevention.pdfCITY OF ANNA, TEXAS
• - ! • • •
! a •' • i ! • •' • A • •
! • ! •
WHEREAS, the Legislature of the State of Texas has in the Flood Control Insurance
Act, Texas Water Code, Section 16.315, delegated the responsibility of local
governmental units to adopt regulations designed to minimize flood losses; and
WHEREAS, the City of Anna, Texas ("the City") has previously adopted ordinances,
rules and regulations governing flood damage prevention; and
WHEREAS, the City of Anna, Texas City Council has investigated and determined
that it would be advantageous and beneficial to the City and its citizens to replace
Part 11, Article 24, of The Anna City Code of Ordinances ("Anna Code") by deleting
Part II, Article 24 in its entirety and adopting a new Part 11, Article 24 incorporating
new standards regarding flood damage prevention developed by the National Flood
Insurance Program to be effective June 2, 2009;
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
ANNA, TEXAS, THAT:
Section 1. Recitals Incorporated.
The above -referenced recitals are incorporated herein as if set forth in full for all
purposes.
In accordance with Part 11, Article 1, Section 9 of the Anna Code, Park 11, Article 24 is
hereby deleted in its entirety.
Section 3. Amendment Adopting New Flood Damage Prevention Regulations.
In accordance with Part 11, Article 1, Section 9 of the Anna Code, the provisions
deleted under Section 2 of this ordinance are replaced with the following new
provisions relating to flood damage prevention, which shall be set forth in the Anna
Code as a new Article 24 under Part 11.
Ord 437-2009 Flood Damage Prevention.doc 1 03-24-09
T
F-MM uFT M 3 Cons #MT, YTTMEM&TIM5097,
Section 1. Flood Damage Prevention
(a) The flood hazard areas of the City of Anna are subject to periodic inundation,
which results in loss of life and property, health and safety hazards, disruption of
commerce and governmental services, and extraordinary public expenditures for flood
protection and relief, all of which adversely affect the public health, safety and general
welfare.
(b) These flood losses are created by the cumulative effect of obstructions in
floodplains which cause an increase in flood heights and velocities, and by the
occupancy of flood hazard areas by uses vulnerable to floods and hazardous to other
lands because they are inadequately elevated, Flood -Proofed or otherwise protected
from flood damage.
1.02 Statement of Purpose
It is the purpose of this article to promote the public health, safety and general welfare
and to minimize public and private losses due to flood conditions in specific areas by
provisions designed to:
(a) protect human life and health;
(b) minimize expenditure of public money for costly flood control projects;
(c) minimize the need for rescue and relief efforts associated with flooding and
generally undertaken at the expense of the general public;
(e) minimize damage to public facilities and utilities such as water and gas mains,
electric, telephone and sewer lines, streets and bridges located in floodplains;
(f) help maintain a stable tax base by providing for the sound use and
development of flood -prone areas in such a manner as to minimize future flood blight
areas; and
(g) insure that potential buyers are notified that property is in a flood area.
In order to accomplish its purposes, this article uses the following methods:
Ord 437-2009 Flood Damage Prevention.doc 2 03-24-09
(a) restrict or prohibit uses that are dangerous to health, safety or property in times
of flood, or cause excessive increases in flood heights or velocities;
(b) require that uses vulnerable to floods, including facilities, which serve such
uses, be protected against flood damage at the time of initial construction;
(c) control the alteration of natural floodplains, stream channels, and natural
protective barriers, which are involved in the accommodation of flood waters;
(d) control filling, grading, dredging and other development, which may increase
•r• damage;
(e) prevent or regulate the construction of flood barriers which will unnaturally
divert flood waters or which may increase flood hazards to other lands.
1.04 Definitions
Unless specifically defined below, words or phrases used in this article shall be
interpreted to give them the meaning they have in common usage and to give this
article its most reasonable application.
Alluvial Fan Flooding means flooding occurring on the surface of an alluvial fan or
similar landform which originates at the apex and is characterized by high -velocity flows;
active processes of erosion, sediment transport, and deposition; and unpredictable flow
paths.
Apex means a point on an alluvial fan or similar landform below which the flow path of
the major stream that formed the fan becomes unpredictable and alluvial fan flooding
can occur.
Appurtenant Structure means a structure which is on the same parcel of property as the
principal structure to be insured and the use of which is incidental to the use of the
principal structure
Area of Future Conditions Flood Hazard means the land area that would be inundated
by the 1-percent-annual chance (100 year) flood based on future conditions hydrology.
Area of Shallow Flooding means a designated AO, AH, AR/AO, AR/AH, or VO zone on
a community's Flood Insurance Rate Map (FIRM) with a 1 percent or greater annual
chance of flooding to an average depth of 1 to 3 feet where a clearly defined channel
does not exist, where the path of flooding is unpredictable and where velocity flow may
be evident. Such flooding is characterized by ponding or sheet flow.
Area of Special Flood Hazard is the land in the floodplain within a community subject to
a 1 percent or greater chance of flooding in any given year. The area may be
designated as Zone A on the Flood Hazard Boundary Map (FHBM). After detailed rate -
Ord 437-2009 Flood Damage Prevention.doc 3 03-24-09
making has been completed in preparation for publication of the FIRM, Zone A usually
is refined into Zones A, AO, AH, Al -30, AE, A99, AR, AR/Al -30, ARAE, ARAO,
ARAH, ARA, VO, V1 -30, VE or V.
Base Flood means the flood having a 1 percent chance of being equaled or exceeded in
any given year.
Base Flood Elevation (BFE) is the elevation shown on the Flood Insurance Rate Map
(FIRM) and found in the accompanying Flood Insurance Study (FIS) for Zones A, AE,
AH, Al -A30, AR, V1 N30, or VE that indicates the water surface elevation resulting from
the flood that has a 1 % chance of equaling or exceeding that level in any given year -
also called the Base Flood.
Basement means any area of the building having its floor subgrade (below ground level)
on all sides.
Breakaway Wall means a wall that is not part of the structural support of the building
and is intended through its design and construction to collapse under specific lateral
loading forces, without causing damage to the elevated portion of the building or
supporting foundation system.
Critical Feature means an integral and readily identifiable part of a flood protection
system, without which the flood protection provided by the entire system would be
compromised.
Development means any man-made change to improved and unimproved real estate,
including but not limited to buildings or other structures, mining, dredging, filling,
grading, paving, excavation or drilling operations or storage of equipment or materials.
Elevated Building means, for insurance purposes, a non -basement building, which has
its lowest elevated floor, raised above ground level by foundation walls, shear walls,
posts, piers, pilings, or columns.
Existing Construction means for the purposes of determining rates, structures for which
the "start of construction" commenced before the effective date of the FIRM or before
January 1, 1975, for FIRMS effective before that date. "Existing construction" may also
be referred to as "existing structures."
Existing Manufactured Home Park or Subdivision - means a manufactured home park
or subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including, at a minimum, the installation of
utilities, the construction of streets, and either final site grading or the pouring of
concrete pads) is completed before the effective date of the floodplain management
regulations adopted by a community.
sion to an Existing Manufactured Home Park or Subdivision means the
Ord 437-2009 Flood Damage Prevention.doc 4 03-24-09
preparation of additional sites by the construction of facilities for servicing the lots on
which the manufactured homes are to be affixed (including the installation of utilities, the
construction of streets, and either final site grading or the pouring of concrete pads).
Flood or Flooding means a general and temporary condition of partial or complete
inundation of normally dry land areas from:
(a) the overflow of inland or tidal waters.
(b) the unusual and rapid accumulation or runoff of surface waters from any source.
Flood Elevation Study means an examination, evaluation and determination of flood
hazards and, if appropriate, corresponding water surface elevations, or an examination,
evaluation and determination of mudslide (i.e., mudflow) and/or flood -related erosion
hazards.
Flood Hazard Boundary Map (FHBM) means an official map of a community, issued by
the Administrator, where the boundaries of the flood, mudslide (i.e., mudflow) related
erosion areas having special hazards have been designated as Zones A, M, and/or E.
Flood Insurance Rate Map (FIRM) means an official map of a community, on which the
Federal Emergency Management Agency has delineated both the special flood hazard
areas and the risk premium zones applicable to the community.
Flood Insurance Study (FIS) see Flood Elevation Study
Floodplain or Flood -Prone Area means any land area susceptible to being inundated by
water from any source (see definition of flooding).
Floodplain Management means the operation of an overall program of corrective and
preventive measures for reducing flood damage, including but not limited to emergency
preparedness plans, flood control works and floodplain management regulations.
Floodplain Management Regulations means zoning ordinances, subdivision regulations,
building codes, health regulations, special purpose ordinances (such as a floodplain
ordinance, grading ordinance and erosion control ordinance) and other applications of
police power. The term describes such state or local regulations, in any combination
thereof, which provide standards for the purpose of flood damage prevention and
reduction.
Flood Protection System means those physical structural works for which funds have
been authorized, appropriated, and expended and which have been constructed
specifically to modify flooding in order to reduce the extent of the area within a
community subject to a "special flood hazard" and the extent of the depths of associated
flooding. Such a system typically includes hurricane tidal barriers, dams, reservoirs,
levees or dikes. These specialized flood modifying works are those constructed in
conformance with sound engineering standards.
Ord 437-2009 Flood Damage Prevention.doe 5 03-24-09
Flood -Proof, Flood -Proofed or Flood Proofing means any combination of structural and
non-structural additions, changes, or adjustments to structures which reduce or
eliminate flood damage to real estate or improved real property, water and sanitary
facilities, structures and their contents.
Floodway see Regulatory Floodway
Functionally Dependent Use means a use, which cannot perform its intended purpose
unless it is located or carried out in close proximity to water. The term includes only
docking facilities, port facilities that are necessary for the loading and unloading of cargo
or passengers, and ship building and ship repair facilities, but does not include long-
term storage or related manufacturing facilities.
Highest Adjacent Grade means the highest natural elevation of the ground surface prior
to construction next to the proposed walls of a structure.
Historic Structure means any structure that is:
(a) listed individually in the National Register of Historic Places (a listing maintained
by the Department of Interior) or preliminarily determined by the Secretary of the Interior
as meeting the requirements for individual listing on the National Register;
(b) certified or preliminarily determined by the Secretary of the Interior as
contributing to the historical significance of a registered historic district or a district
preliminarily determined by the Secretary to qualify as a registered historic district;
(c) individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of Interior; or
(d) individually listed on a local inventory or historic places in communities with
historic preservation programs that have been certified either:
(1) by an approved state program as determined by the Secretary of the
Interior or;
(2) directly by the Secretary of the Interior in states without approved
W��
Levee means a man-made structure, usually an earthen embankment, designed and
constructed in accordance with sound engineering practices to contain, control, or divert
the flow of water so as to provide protection from temporary flooding.
Levee System means a flood protection system which consists of a levee, or levees,
and associated structures, such as closure and drainage devices, which are constructed
and operated in accordance with sound engineering practices.
Ord 437-2009 Flood Damage Prevention.doc 6 03-24-09
Lowest Floor means the lowest floor of the lowest enclosed area (including basement).
An unfinished or flood resistant enclosure, usable solely for parking or vehicles, building
access or storage in an area other than a basement area is not considered a building's
lowest floor; provided that such enclosure is not built so as to render the structure in
violation of the applicable non -elevation design requirement of Section 60.3 of the
National Flood Insurance Program regulations.
Manufactured Home means a structure transportable in one or more sections, which is
built on a permanent chassis and is designed for use with or without a permanent
foundation when connected to the required utilities. The term "manufactured home"
does not include a "recreational vehicle".
Manufactured Home Park or Subdivision means a parcel (or contiguous parcels) of land
divided into two or more manufactured home lots for rent or sale.
Mean Sea Level means, for purposes of the National Flood Insurance Program, the
National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood
elevations shown on a community's Flood Insurance Rate Map are referenced.
New Construction means, for the purpose of determining insurance rates, structures for
which the "start of construction" commenced on or after the effective date of an initial
FIRM or after December 31, 1974, whichever is later, and includes any subsequent
improvements to such structures. For floodplain management purposes, "new
construction" means structures for which the "start of construction" commenced on or
after the effective date of a floodplain management regulation adopted by a community
and includes any subsequent improvements to such structures.
New Manufactured Home Park or Subdivision means a manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including at a minimum, the installation of
utilities, the construction of streets, and either final site grading or the pouring of
concrete pads) is completed on or after the effective date of floodplain management
regulations adopted by a community.
Recreational Vehicle means a vehicle which is (i) built on a single chassis; (ii) 400
square feet or less when measured at the largest horizontal projections; (iii) designed to
be self-propelled or permanently towable by a light duty truck; and (iv) designed
primarily not for use as a permanent dwelling but as temporary living quarters for
recreational, camping, travel, or seasonal use.
Riverine means relating to, formed by, or resembling a river (including tributaries),
stream, brook, etc.
Special Flood Hazard Area see Area of Special Flood Hazard
Ord 437-2009 Flood Damage Prevention.doc 7 03-24-09
Start of Construction (for other than new construction or substantial improvements
under the Coastal Barrier Resources Act (Pub. L. 97-348)), includes substantial
improvement and means the date the building permit was issued, provided the actual
start of construction, repair, reconstruction, rehabilitation, addition placement, or other
improvement was within 180 days of the permit date. The actual start means either the
first placement of permanent construction of a structure on a site, such as the pouring of
slab or footings, the installation of piles, the construction of columns, or any work
beyond the stage of excavation; or the placement of a manufactured home on a
foundation. Permanent construction does not include land preparation, such as
clearing, grading and filling; nor does it include the installation of streets andlor
walkways; nor does it include excavation for basement, footings, piers or foundations or
the erection of temporary forms; nor does it include the installation on the property of
accessory buildings, such as garages or sheds not occupied as dwelling units or not
part of the main structure. For a substantial improvement, the actual start of
construction means the first alteration of any wall, ceiling, floor, or other structural part
of a building, whether or not that alteration affects the external dimensions of the
building.
Structure means, for floodplain management purposes, a walled and roofed building,
including a gas or liquid storage tank, that is principally above ground, as well as a
manufactured home.
Substantial Damage means damage of any origin sustained by a structure whereby the
cost of restoring the structure to its before damaged condition would equal or exceed 50
percent of the market value of the structure before the damage occurred.
Substantial Improvement means any reconstruction, rehabilitation, addition, or other
improvement of a structure, the cost of which equals or exceeds 50 percent of the
market value of the structure before "start of construction" of the improvement. This
term includes structures, which have incurred "substantial damage", regardless of the
actual repair work performed. The term does not, however, include either: (1) Any
project for improvement of a structure to correct existing violations of state or local
health, sanitary, or safety code specifications which have been identified by the local
code enforcement official and which are the minimum necessary to assure safe living
conditions or (2) Any alteration of a "historic structure", provided that the alteration will
not preclude the structure's continued designation as a "historic structure."
Variance means a grant of relief by a community from the terms of a floodplain
management regulation. (For full requirements see Section 60.6 of the National Flood
Insurance Program regulations.)
Violation means the failure of a structure or other development to be fully compliant with
the community's floodplain management regulations. A structure or other development
without the elevation certificate, other certifications, or other evidence of compliance
required in Section 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5) is presumed
to be in violation until such time as that documentation is provided.
Ord 437-2009 Flood Damage Prevention.doc 8 03-24-09
Water Surface Elevation means the height, in relation to the National Geodetic Vertical
Datum (NGVD) of 1929 (or other datum, where specified), of floods of various
magnitudes and frequencies in the floodplains of coastal or riverine areas.
1.05 Lands to Which This Article Applies
This article shall apply to all areas of special flood hazard within the jurisdiction of City
of Anna.
1.06. Basis for Establishing the Areas of Special Flood Hazard
The areas of special flood hazard identified by the Federal Emergency Management
Agency in the current scientific and engineering report entitled, "The Flood Insurance
Study (FIS) for Collin County, Texas And Incorporated Areas," dated June 2, 2009, with
accompanying Flood Insurance Rate Maps dated June 2, 2009, and any revisions
thereto are hereby adopted by reference and declared to be a part of this article.
1.07 Establishment of Development Permit
A Floodplain Development Permit shall be required to ensure conformance with the
provisions of this article,
1.08 Compliance
No structure or land shall hereafter be located, altered, or have its use changed without
full compliance with the terms of this article and other applicable regulations.
1.09 Abrogation and Greater Restrictions
This article is not intended to repeal, abrogate, or impair any existing easements,
covenants, or deed restrictions. However, where this article and another ordinance,
regulation, easement, covenant, or deed restriction conflict or overlap, whichever
imposes the more stringent restrictions shall prevail.
In the interpretation and application of this article, all provisions shall be:
(a) considered as minimum requirements;
(b) liberally construed in favor of the governing body; and
(c) deemed neither to limit nor repeal any other powers granted under State
statutes.
1.10 Warning and Disclaimer or Liab
Ord 437-2009 Flood Damage Prevention,doc 9 03-24-09
The degree of flood protection required by this article is considered reasonable for
regulatory purposes and is based on scientific and engineering considerations. On rare
occasions greater floods can and will occur and flood heights may be increased by
man-made or natural causes. This article does not imply that land outside the areas of
special flood hazards or uses permitted within such areas will be free from flooding or
flood damages. This article shall not create liability on the part of the community or any
official or employee thereof for any flood damages that result from reliance on this
article or any administrative decision lawfully made hereunder.
The City Manager or his or her designee is hereby appointed the Floodplain
Administrator to administer and implement the provisions of this article and other
appropriate sections of 44 CFR (Emergency Management and Assistance - National
Flood Insurance Program Regulations) pertaining to floodplain management.
1.13 Duties & Responsibilities of the Floodplain Administrator
Duties and responsibilities of the Floodplain Administrator shall include, but not be
limited to, the following.
(a) Maintain and hold open for public inspection all records pertaining to the
provisions of this ordinance.
(b) Review permit application to determine whether to ensure that the proposed
building site project, including the placement of manufactured homes, will be reasonably
safe from flooding.
(c) Review, approve or deny all applications for development permits required by
adoption of this ordinance.
(d) Review permits for proposed development to assure that all necessary permits
have been obtained from those Federal, State or local governmental agencies including
Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C.
1334) from which prior approval is required.
(e) Where interpretation is needed as to the exact location of the boundaries of the
areas of special flood hazards (for example, where there appears to be a conflict
between a mapped boundary and actual field conditions) the Floodplain Administrator
shall make the necessary interpretation.
(f) Notify, in riverine situations, adjacent communities and the State Coordinating
Agency which is the Texas Water Development Board (TVVDB) and also the Texas
Commission on Environmental Quality (TCEQ), prior to any alteration or relocation of a
watercourse, and submit evidence of such notification to the Federal Emergency _ _
Ord 437-2009 Flood Damage Prevention,doc 10 03-24-09
Management Agency.
(g) Assure that the flood carrying capacity within the altered or relocated portion of
any watercourse is maintained.
(h) When base flood elevation data has not been provided in accordance with
subsection 1.06 of this article, the Floodplain Administrator shall obtain, review and
reasonably utilize any base flood elevation data and floodway data available from a
Federal, State or other source, in order to administer the provisions of subsections 1. 16-
1. 18 of this article.
1.14 Permit Procedures
(a) Application for a Floodplain Development Permit shall be presented to the
Floodplain Administrator on forms furnished by him/her and may include, but not be
limited to, plans in duplicate drawn to scale showing the location, dimensions, and
elevation of proposed landscape alterations, existing and proposed structures, including
the placement of manufactured homes, and the location of the foregoing in relation to
areas of special flood hazard. Additionally, the following information is required:
(1) elevation (in relation to mean sea level), of the lowest floor (including
basement) of all new and substantially improved structures;
(2) elevation in relation to mean sea level to which any nonresidential
structure shall be Flood -Proofed;
(3) a certificate from a registered professional engineer or architect that the
nonresidential Flood -Proofed structure shall meet the Flood -Proofing criteria of
subsection 1.17(b) of this article,
(4) description of the extent to which any watercourse or natural drainage will
be altered or relocated as a result of proposed development; and
(5) maintain a record of all such information in accordance with subsection
1.13 (a) of this article.
(b) Approval or denial of a Floodplain Development Permit by the Floodplain
Administrator shall be based on all of the provisions of this article and the following
relevant factors:
(1) the danger to life and property due to flooding or erosion damage;
(2) the susceptibility of the proposed facility and its contents to -flood damage
and the effect of such damage on the individual owner;
(3) the danger that materials may be swept onto other lands to the injury of
Ord 43z2009Flood Damage Prevenbon.doc 11 03-24-08
others;
(4) the compatibility of the proposed use with existing and anticipated
development;
(5) the safety of access to the property in times of flood for ordinary and
emergency vehicles;
(6) the costs of providing governmental services during and after flood
conditions including maintenance and repair of streets and bridges, and public utilities
and facilities such as sewer, gas, electrical and water systems;
(7) the expected heights, velocity, duration, rate of rise and sediment
transport of the floodwaters and the effects of wave action, if applicable, expected at the
site;
(8) the necessity to the facility of a waterfront location, where applicable;
(9) the availability of alternative locations, not subject to flooding or erosion
damage, for the proposed use; and,
(10) the relationship of the proposed use to the comprehensive plan for that
area.
1.15 Variance Procedures
(a) The Appeal Board, as established by the community, shall hear and render
judgment on requests for variances from the requirements of this article.
(b) The Appeal Board shall hear and render judgment on an appeal only when it is
alleged there is an error in any requirement, decision, or determination made by the
Floodpiain Administrator in the enforcement or administration of this article.
(c) Any person or persons aggrieved by the decision of the Appeal Board may
appeal such decision in the courts of competent jurisdiction.
(d) The Floodplain Administrator shall maintain a record of all actions involving an
appeal and shall report variances to the Federal Emergency Management Agency upon
request.
(e) Variances may be issued for the reconstruction, rehabilitation or restoration of
structures listed on the National Register of Historic Places or the State Inventory of
Historic Places, without regard to the procedures set forth in the remainder of this
article.
Variances may be issued for new construction and substantial improvements to
Ord 437-2009 Flood Damage Prevention.doc 12 03-24-09
be erected on a lot of 1/2 acre or less in size contiguous to and surrounded by lots with
existing structures constructed below the base flood level, providing the relevant factors
in subsection 1.14(b) of this Article have been fully considered. As the lot size
increases beyond the 1/2 acre, the technical justification required for issuing the
variance increases.
(g) Upon consideration of the factors noted above and the intent of this article, the
Appeal Board may attach such conditions to the granting of variances as it deems
necessary to further the purpose and objectives of this article (subsection 1.02).
(h) Variances shall not be issued within any designated floodway if any increase in
flood levels during the base flood discharge would result.
(i) Variances may be issued for the repair or rehabilitation of historic structures
upon a determination that the proposed repair or rehabilitation will not preclude the
structure's continued designation as a historic structure and the variance is the
minimum necessary to preserve the historic character and design of the structure.
(j) Prerequisites for granting variances:
(1) Variances shall only be issued upon a determination that the
variance is the minimum necessary, considering the flood hazard,
to afford relief.
(2) Variances shall only be issued upon:
(i) showing a good and sufficient cause;
(ii) a determination that failure to grant the variance would result
in exceptional hardship to the applicant, and
(iii) a determination that the granting of a variance will not result
in increased flood heights, additional threats to public safety,
extraordinary public expense, create nuisances, cause fraud on or
victimization of the public, or conflict with existing local laws,
ordinances or regulations.
(3) Any application to which a variance is granted shall be given written notice
that the structure will be permitted to be built with the lowest floor elevation below the
base flood elevation, and that the cost of flood insurance will be commensurate with the
increased risk resulting from the reduced lowest floor elevation.
W Variances may be issued by a community for new construction and substantial
improvements and for other development necessary for the conduct of a functionally
dependent use provided that:
(i) the criteria outlined subsection 1.14(b)(1)-(10) are met, and
(ii) the structure or other development is protected by methods that
minimize flood damages during the base flood and create no
Ord 437-2009 Flood Damage Prevention.doc 13 03-24-09
additional threats to public safety.
In all areas of special flood hazards the following provisions are required for all new
construction and substantial improvements:
(1) all new construction or substantial improvements shall be designed (or
modified) and adequately anchored to prevent flotation, collapse or lateral movement of
the structure resulting from hydrodynamic and hydrostatic loads, including the effects of
buoyancy;
(2) all new construction or substantial improvements shall be constructed by
methods and practices that minimize flood damage;
(3) all new construction or substantial improvements shall be constructed with
materials resistant to flood damage;
(4) all new construction or substantial improvements shall be constructed with
electrical, heating, ventilation, plumbing, and air conditioning equipment and other
service facilities that are designed and/or located so as to prevent water from entering
or accumulating within the components during conditions of flooding.
(5) all new and replacement water supply systems shall be designed to minimize or
eliminate infiltration of flood waters into the system;
(6) new and replacement sanitary sewage systems shall be designed to minimize
or eliminate infiltration of flood waters into the system and discharge from the systems
into flood waters; and,
(7) on -site waste disposal systems shall be located to avoid impairment to them or
contamination from them during flooding.
1.17 Specific Standards
In all areas of special flood hazards where base flood elevation data has been provided
as set forth in subsection 1.06, subsection 1.1 3(h), or subsection 1.18(c), the following
provisions are required.
(a) Residential Construction - new construction and substantial improvement of any
residential structure shall have the lowest floor (including basement), elevated to two
feet above the base flood elevation. A registered professional engineer, architect, or
land surveyor shall submit a certification to the Floodplain Administrator that the
standard of this subsection as proposed in subsection 1.14(a)(1), is satisfied.
Ord 437-2009 Flood Damage Prevention.doe 14 03-24-09
(b) Nonresidential Construction - new construction and substantial improvements of
any commercial, industrial or other nonresidential structure shall either have the lowest
floor (including basement) elevated to one foot above the base flood level or together
with attendant utility and sanitary facilities, be designed so that below the base flood
level the structure is watertight with walls substantially impermeable to the passage of
water and with structural components having the capability of resisting hydrostatic and
hydrodynamic loads and effects of buoyancy. A registered professional engineer or
architect shall develop and/or review structural design, specifications, and plans for the
construction, and shall certify that the design and methods of construction are in
accordance with accepted standards of practice as outlined in this subsection. A record
of such certification which includes the specific elevation (in relation to mean sea level)
to which such structures are Flood -Proofed shall be maintained by the Floodplain
Administrator.
(c) Enclosures - new construction and substantial improvements, with fully
enclosed areas below the lowest floor that are usable solely for parking of vehicles,
building access or storage in an area other than a basement and which are subject to
flooding shall be designed to automatically equalize hydrostatic flood forces on exterior
walls by allowing for the entry and exit of floodwaters. Designs for meeting this
requirement must either be certified by a registered professional engineer or architect or
meet or exceed the following minimum criteria:
(1) a minimum of two openings on separate walls having a total net area of
not less than I square inch for every square foot of enclosed area subject to flooding
shall be provided.
(2) the bottom of all openings shall be no higher than 1 foot above grade,
(3) openings may be equipped with screens, louvers, valves, or other
coverings or devices provided that they permit the automatic entry and exit of
floodwaters.
(d) Manufactured Homes -
(1) Require that all manufactured homes to be placed within Zone A on a
community's FIRM shall be installed using methods and practices that minimize flood
damage. For the purposes of this requirement, manufactured homes must be elevated
and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring
may include, but are not limited to, use of over -the -top or frame ties to ground anchors.
This requirement is in addition to applicable State and local anchoring requirements for
resisting wind forces.
(2) Require that manufactured homes that are placed or substantially
improved within Zones Al-30, AH, and AE on the community's FIRM on sites:
Ord 437-2009 Flood Damage Prevention.doc 15 03-24-09
(i) outside of a manufactured home park or subdivision,
(ii) in a new manufactured home park or subdivision,
(iii) in an expansion to an existing manufactured home park or subdivision,
5r 0M
(iv) in an existing manufactured home park or subdivision on which a
manufactured home has incurred "substantial damage" as a result of a flood, be
elevated on a permanent foundation such that the lowest floor of the manufactured
home is elevated to two feet above the base flood elevation and be securely anchored
to an adequately anchored foundation system to resist flotation, collapse, and lateral
movement.
(3) Require that manufactured homes be placed or substantially improved on
sites in an existing manufactured home park or subdivision with Zones Al-30, AH and
AE on the community's FIRM that are not subject to the provisions of paragraph (d) of
this subsection be elevated so that either:
(i) the lowest floor of the manufactured home is at one foot above the
base flood elevation, or
(ii) the manufactured home chassis is supported by reinforced piers or
other foundation elements of at least equivalent strength that are no less than 36 inches
in height above grade and be securely anchored to an adequately anchored foundation
system to resist flotation, collapse, and lateral movement.
(a) All subdivision proposals including the placement of manufactured home parks
and subdivisions shall be consistent with subsections 1.01-1.03 of this article.
(b) All proposals for the development of subdivisions including the placement of
manufactured home parks and subdivisions shall meet Floodplain Development Permit
requirements of subsections 1.07;1.14; and the provisions of subsections 1.16-1.18.
(c) Base flood elevation data shall be generated for subdivision proposals and other
proposed development including the placement of manufactured home parks and
subdivisions which is greater than 50 lots or 5 acres, whichever is lesser, if not
otherwise provided pursuant to subsections 1.06; or subsection 1.13(h) of this article.
(d) Base flood elevation data shall be generated by a detailed engineering study for
all Zone A areas, within 100 feet of the contour lines of Zone A areas, and other
Riverines not mapped by FEMA, as indicated on the community's FIRM.
e) All subdivision proposals including the placement of manufactured home
Ord 437-2009 Flood Damage Preventlon.doc 16 03-24-09
and subdivisions shall have adequate drainage provided to reduce exposure to flood
hazards.
(f) All subdivision proposals including the placement of manufactured home parks
and subdivisions shall have public utilities and facilities such as sewer, gas, electrical
and water systems located and constructed to minimize or eliminate flood damage.
91a - = : a �
The City Council shall serve as the Appeals Board referenced in subsection 1.15 of this
article.
Section 4. Penalty.
Any violation of any of the terms of this ordinance, whether denominated in this
ordinance as unlawful or not, shall be deemed a misdemeanor. Any person convicted of
any such violation shall be fined in an amount not to exceed $2,000 for each incidence
of violation. Each violation is considered a separate offense and will be punished
separately.
Section 5. Savings, Severability and Repealing Clauses.
All ordinances of the City in conflict with the provisions of this ordinance are repealed to
the extent of that conflict. If any provision of this ordinance shall be held to be invalid or
unconstitutional, the remainder of such ordinance shall continue in full force and effect
the same as if such invalid or unconstitutional provision had never been a part hereof.
The City declares that it would have passed this ordinance, and each section,
subsection, clause, or phrase thereof irrespective of the fact that any one or more
sections, subsections, sentences, clauses, and phrases be declared unconstitutional or
invalid.
Section 6. Publication of the Caption Hereof and Effective Date.
This ordinance shall be in full force and effective from and after its passage and upon
the posting and/or publication, if required by law, of its caption and the City Secretary is
hereby directed to implement such posting and/or publication.
PASSED by the City Council of the City of Anna, Texas, this 24th day of March, 2009.
ATTESTED:
ACIL
City Secretiry,'Natha Wilki-,
Ord 437-2009 Flood Damage Prevention
X "Noltj I III It
OF
r, Kenneth Pelham
03-24-09