Loading...
HomeMy WebLinkAboutRes 2017-07-340 2017 Street Rehab solicit for bids/G CITY OF ANNA, TEXAS RESOLUTION NO. J61 -Z -b'% --3 �C A RESOLUTION OF THE CITY OF ANNA, TEXAS, AUTHORIZING THE CITY MANAGER TO SOLICIT BIDS FOR THE 2017 STREET REHABILITATION PROJECT WHEREAS, the FY 2017 budget includes funds for the rehabilitation of existing asphalt streets; and WHEREAS, there is $136,000 remaining in the Streets department Capital Improvements budget; and WHEREAS, the City's purchasing policies state that no bid process on purchases more than $50,000 shall begin until approved by the City Council and the City Manager, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Approval of Bidding Process. The City Council hereby authorizes the City Manager to solicit bids for the 2017 Street Rehabilitation Project which includes the following reconstruction projects: a) Third Street between SH 5 and Interurban - 290 linear feet b) Butler from SH 5 continuing 250' west - 250 linear feet c) Easton between Fifth and Sixth - 290 linear feet d) Third Street between Interurban and Riggins - 320 linear feet PASSED AND APPROVED by the City Council of the City of Anna, Texas on this 25th day of July 2017. ATTEST:�����'III'Iloi,,,111�APPROVED: OFq Carrie L. Smith, City Secretary*•'•,, like Crist, Mayor BIRKHOFF, HENDRICKS & CARTER, L.L.P. Project No. PROFESSIONAL ENGINEERS Texas Firm F526 Client: City of Anna Date: Project: 3rd Street - From SH 5 to Interurban 290' long x 22' wide (Will require TxDOT permit) By: ENGINEER'S OPINION OF CONSTRUCTION COST 4007-238 19 -Jul -17 CMK Item No. I Description Q—u—a—n—t—i t—YTUnit I Price I Amount 1 Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item 251) to a Minimum Depth of 6 -inches 709 SY $ 8.00 $ 5,671.11 2 Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340) 117 Tons $ 110.00 $ 12,866.33 3 Full Depth HMAC Sawcut 394 LF $ 5.00 $ 1,970.00 4 Wedge Milling (5 -ft Wide) 290 LF $ 12.00 $ 3,480.00 5 Furnish, Install & Maintain Erosion Control 1 LS $ 2,000.00 $ 2,000.00 6 Furnish a Traffic Control Plan 1 Ea $ 1,500.00 $ 1,500.00 7 Install, Maintain & Remove Traffic Control Devices 1 LS $ 3,000.00 $ 3,000.00 8 Water Valve / Sanitary Clean-out adjustment 1 Ea $ 500.00 $ 500.00 9 ADDITIVE ALTERNATE 10 Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247) 40 Tons $ 70.00 $ 2,800.00 Subtotal• $ 33,787.44 Contingencies and Miscellaneous Items 15% $ 5,068.12 Construction Total: $ 38,855.56 Quality Control and Material Testing 2.50% $ 971.39 Estimated Project Total: $ 39,826.95 USE: $ 40,000.00 R6-5 26 17-07` � 7� JACLERICAL\Anna\I-General Services\4007-City Projects\238-2017 Street Rehab Projcct\Eng-Estimales\Estirnate & Quantity Sheel.xlsx Page I of I BIRKHOFF, HENDRICKS & CARTER, L.L.P. PROFESSIONAL ENGINEERS Texas Fir»t F526 Client: Project: City of Anna Butler Street - First 250 -feet 250' long x varied width (half at 24' half at 40') (Will require TxDOT permit) Project No. 4007-238 Date: 19 -Jul -17 ENGINEER'S OPINION OF CONSTRUCTION COST By: CMK Item No. I Description I Quantity Unit I Price I Amount 1 Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item 251) to a Minimum Depth of 6 -inches 889 SY $ 8.00 $ 7,111.11 2 Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340) 147 Tons $ 110.00 $ 16,133.33 3 Full Depth HMAC Sawcut 140 LF $ 5.00 $ 700.00 4 Wedge Milling (5 -ft Wide) 45 LF $ 12.00 $ 540.00 5 Furnish, Install & Maintain Erosion Control 1 LS $ 2,000.00 $ 2,000.00 6 Furnish a Traffic Control Plan 1 Ea $ 1,500.00 $ 1,500.00 7 Install, Maintain & Remove Traffic Control Devices I LS $ 3,000.00 $ 3,000.00 8 Water Valve / Sanitary Clean-out adjustment 0 Ea $ 500.00 $ - 9 ADDITIVE ALTERNATE 10 Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247) 50 Tons $ 70.00 $ 3,500.00 Subtotal: $ 34,484.44 Contingencies and Miscellaneous Items 15% $ 5,172.67 Construction Total: $ 39 657.11 Quality Control and Material Testing 2.50% $ 991.43 Estimated Project Total: I $ 40,648.54 USE: $ 41,000.00 2c' l7 -C) 7-° �3 z10 67 /z-- s^ 7 JACLERICALWna\I-General Services41007-City Projects\238.2017 Street Rehab ProjecflEng-Eslimates\Estima(c & Quantity Sheet xlsx Page 1 of 1 BIRKHOFF, HENDRICKS & CARTER, L.L.P. PROFESSIONAL ENGINEERS Texas Firm F526 Client: City of Anna Project: Easton Street - From 5th to 6th 290' long x 20' wide Project No. 4007-238 Date: 19 -Jul -17 ENGINEER'S OPINION OF CONSTRUCTION COST By: CMK Item No. I Description I Quantity Unit Price Amount 1 Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item 251) to a Minimum Depth of 6 -inches 644 SY $ 8.00 $ 5,155.56 2 Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340) 106 Tons $ 110.00 $ 11,696.67 3 Full Depth HMAC Sawcut 140 LF $ 5.00 $ 700.00 4 Wedge Milling (5 -ft Wide) 45 LF $ 12.00 $ 540.00 5 Furnish, Install & Maintain Erosion Control 1 LS $ 2,000.00 $ 2,000.00 6 Furnish a Traffic Control Plan 1 Ea $ 1,500.00 $ 1,500.00 7 Install, Maintain & Remove Traffic Control Devices 1 LS $ 2,000.00 $ 2,000.00 8 Manhole adjustment 1 Ea $ 800.00 $ 800.00 9 ADDITIVE ALTERNATE 10 Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247) 35 Tons $ 70.00 $ 2,450.00 Subtotal: $ 26,842.22 Contingencies and Miscellaneous Items 15% $ 4,0 6.33 Construction Total: $ 30,868.55 Quality Control and Material Testing 2.50% $ 771.71 Estimated Project Total- $ 31 640.27 USE: $ 32,000.00 2c> 5 VC -7 JICLERICAL innAl-General Services\4007-City Projects\238-2017 Street Rehab ProjectHing-EstimatesUistimate & Quantity Sheet xlsx Page I of 1 BIRKHOFF, HENDRICKS & CARTER, L.L.P. Project No. 4007-238 PROFESSIONAL ENGINEERS Texas Firm F526 Client: City of Anna Date: 19 -Jul -17 Project: 3rd Street - From Interurban to Riggin 320' longi x 20' wide (Includes across the intersection of Interurban) By: CMK ENGINEER'S OPINION OF CONSTRUCTION COST Item No. I Description Quantity Unit I Price I Amount 1 Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item 251) to a Minimum Depth of 6 -inches 711 SY $ 8.00 $ 5,688.89 2 Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340) 117 Tons $ 110.00 $ 12,906.67 3 Full Depth HMAC Sawcut 90 LF $ 5.00 $ 450.00 4 Wedge Milling (5 -ft Wide) 90 LF $ 12.00 $ 1,080.00 5 Furnish, Install & Maintain Erosion Control 1 LS $ 2,000.00 $ 2,000.00 6 Furnish a Traffic Control Plan I Ea $ 1,500.00 $ 1,500.00 7 Install, Maintain & Remove Traffic Control Devices 1 LS $ 2,000.00 $ 2,000.00 8 Water Valve / Sanitary Clean-out adjustment 1 Ea $ 500.00 $ 500.00 9 ADDITIVE ALTERNATE 10 Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247) 40 Tons $ 70.00 $ 2,800.00 Subtotal: $ 28,925.56 Contingencies and Miscellaneous Items 15% $ 4,338.83 Construction Total: $ 33,264.39 Quality Control and Material Testing 2.50% $ 831.61 Estimated Project Total: $ 34,096.00 USE: $ 35,000.00 6 7 ('mss l2c>17 JACLERICAL\Anna\I-General Services\4007•City Projects\238-2017 Street Rehab Project\Eng-EstimalesTstimate & Quantity Sheet xlsx Page I of I