HomeMy WebLinkAboutRes 2017-07-340 2017 Street Rehab solicit for bids/G
CITY OF ANNA, TEXAS
RESOLUTION NO. J61 -Z -b'% --3 �C
A RESOLUTION OF THE CITY OF ANNA, TEXAS, AUTHORIZING THE CITY
MANAGER TO SOLICIT BIDS FOR THE 2017 STREET REHABILITATION PROJECT
WHEREAS, the FY 2017 budget includes funds for the rehabilitation of existing asphalt
streets; and
WHEREAS, there is $136,000 remaining in the Streets department Capital Improvements
budget; and
WHEREAS, the City's purchasing policies state that no bid process on purchases more
than $50,000 shall begin until approved by the City Council and the City Manager,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ANNA, TEXAS, THAT:
Section 1. Recitals Incorporated.
The recitals above are incorporated herein as if set forth in full for all purposes.
Section 2. Approval of Bidding Process.
The City Council hereby authorizes the City Manager to solicit bids for the 2017 Street
Rehabilitation Project which includes the following reconstruction projects:
a) Third Street between SH 5 and Interurban - 290 linear feet
b) Butler from SH 5 continuing 250' west - 250 linear feet
c) Easton between Fifth and Sixth - 290 linear feet
d) Third Street between Interurban and Riggins - 320 linear feet
PASSED AND APPROVED by the City Council of the City of Anna, Texas on this 25th
day of July 2017.
ATTEST:�����'III'Iloi,,,111�APPROVED:
OFq
Carrie L. Smith, City Secretary*•'•,, like Crist, Mayor
BIRKHOFF, HENDRICKS & CARTER, L.L.P. Project No.
PROFESSIONAL ENGINEERS
Texas Firm F526
Client: City of Anna Date:
Project: 3rd Street - From SH 5 to Interurban
290' long x 22' wide (Will require TxDOT permit) By:
ENGINEER'S OPINION OF CONSTRUCTION COST
4007-238
19 -Jul -17
CMK
Item No.
I Description
Q—u—a—n—t—i t—YTUnit
I Price
I Amount
1
Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item
251) to a Minimum Depth of 6 -inches
709
SY
$ 8.00
$ 5,671.11
2
Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340)
117
Tons
$ 110.00
$ 12,866.33
3
Full Depth HMAC Sawcut
394
LF
$ 5.00
$ 1,970.00
4
Wedge Milling (5 -ft Wide)
290
LF
$ 12.00
$ 3,480.00
5
Furnish, Install & Maintain Erosion Control
1
LS
$ 2,000.00
$ 2,000.00
6
Furnish a Traffic Control Plan
1
Ea
$ 1,500.00
$ 1,500.00
7
Install, Maintain & Remove Traffic Control Devices
1
LS
$ 3,000.00
$ 3,000.00
8
Water Valve / Sanitary Clean-out adjustment
1
Ea
$ 500.00
$ 500.00
9
ADDITIVE ALTERNATE
10
Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247)
40
Tons
$ 70.00
$ 2,800.00
Subtotal•
$ 33,787.44
Contingencies and Miscellaneous Items
15%
$ 5,068.12
Construction Total:
$ 38,855.56
Quality Control and Material Testing
2.50%
$ 971.39
Estimated Project Total:
$ 39,826.95
USE:
$ 40,000.00
R6-5 26 17-07` � 7�
JACLERICAL\Anna\I-General Services\4007-City Projects\238-2017 Street Rehab Projcct\Eng-Estimales\Estirnate & Quantity Sheel.xlsx Page I of I
BIRKHOFF, HENDRICKS & CARTER, L.L.P.
PROFESSIONAL ENGINEERS
Texas Fir»t F526
Client:
Project:
City of Anna
Butler Street - First 250 -feet
250' long x varied width (half at 24' half at 40') (Will require TxDOT permit)
Project No. 4007-238
Date: 19 -Jul -17
ENGINEER'S OPINION OF CONSTRUCTION COST
By:
CMK
Item No.
I Description
I Quantity
Unit
I Price
I Amount
1
Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item
251) to a Minimum Depth of 6 -inches
889
SY
$ 8.00
$ 7,111.11
2
Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340)
147
Tons
$ 110.00
$ 16,133.33
3
Full Depth HMAC Sawcut
140
LF
$ 5.00
$ 700.00
4
Wedge Milling (5 -ft Wide)
45
LF
$ 12.00
$ 540.00
5
Furnish, Install & Maintain Erosion Control
1
LS
$ 2,000.00
$ 2,000.00
6
Furnish a Traffic Control Plan
1
Ea
$ 1,500.00
$ 1,500.00
7
Install, Maintain & Remove Traffic Control Devices
I
LS
$ 3,000.00
$ 3,000.00
8
Water Valve / Sanitary Clean-out adjustment
0
Ea
$ 500.00
$ -
9
ADDITIVE ALTERNATE
10
Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247)
50
Tons
$ 70.00
$ 3,500.00
Subtotal:
$ 34,484.44
Contingencies and Miscellaneous Items
15%
$ 5,172.67
Construction Total:
$ 39 657.11
Quality Control and Material Testing
2.50%
$ 991.43
Estimated Project Total:
I
$ 40,648.54
USE:
$ 41,000.00
2c' l7 -C) 7-° �3 z10
67 /z-- s^ 7
JACLERICALWna\I-General Services41007-City Projects\238.2017 Street Rehab ProjecflEng-Eslimates\Estima(c & Quantity Sheet xlsx Page 1 of 1
BIRKHOFF, HENDRICKS & CARTER, L.L.P.
PROFESSIONAL ENGINEERS
Texas Firm F526
Client: City of Anna
Project: Easton Street - From 5th to 6th
290' long x 20' wide
Project No. 4007-238
Date: 19 -Jul -17
ENGINEER'S OPINION OF CONSTRUCTION COST
By: CMK
Item No.
I Description
I Quantity
Unit
Price
Amount
1
Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item
251) to a Minimum Depth of 6 -inches
644
SY
$ 8.00
$ 5,155.56
2
Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340)
106
Tons
$ 110.00
$ 11,696.67
3
Full Depth HMAC Sawcut
140
LF
$ 5.00
$ 700.00
4
Wedge Milling (5 -ft Wide)
45
LF
$ 12.00
$ 540.00
5
Furnish, Install & Maintain Erosion Control
1
LS
$ 2,000.00
$ 2,000.00
6
Furnish a Traffic Control Plan
1
Ea
$ 1,500.00
$ 1,500.00
7
Install, Maintain & Remove Traffic Control Devices
1
LS
$ 2,000.00
$ 2,000.00
8
Manhole adjustment
1
Ea
$ 800.00
$ 800.00
9
ADDITIVE ALTERNATE
10
Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247)
35
Tons
$ 70.00
$ 2,450.00
Subtotal:
$ 26,842.22
Contingencies and Miscellaneous Items
15%
$ 4,0 6.33
Construction Total:
$ 30,868.55
Quality Control and Material Testing
2.50%
$ 771.71
Estimated Project Total-
$ 31 640.27
USE:
$ 32,000.00
2c> 5 VC
-7
JICLERICAL innAl-General Services\4007-City Projects\238-2017 Street Rehab ProjectHing-EstimatesUistimate & Quantity Sheet xlsx Page I of 1
BIRKHOFF, HENDRICKS & CARTER, L.L.P. Project No. 4007-238
PROFESSIONAL ENGINEERS
Texas Firm F526
Client: City of Anna Date: 19 -Jul -17
Project: 3rd Street - From Interurban to Riggin
320' longi x 20' wide (Includes across the intersection of Interurban) By: CMK
ENGINEER'S OPINION OF CONSTRUCTION COST
Item No.
I Description
Quantity
Unit
I Price
I Amount
1
Scarify, Remix & Compact Pavement Surface and Base Material (TxDOT Item
251) to a Minimum Depth of 6 -inches
711
SY
$ 8.00
$ 5,688.89
2
Furnish & Install 3 -inch TxDOT Type "D" HMAC Surface (TxDOT Item 340)
117
Tons
$ 110.00
$ 12,906.67
3
Full Depth HMAC Sawcut
90
LF
$ 5.00
$ 450.00
4
Wedge Milling (5 -ft Wide)
90
LF
$ 12.00
$ 1,080.00
5
Furnish, Install & Maintain Erosion Control
1
LS
$ 2,000.00
$ 2,000.00
6
Furnish a Traffic Control Plan
I
Ea
$ 1,500.00
$ 1,500.00
7
Install, Maintain & Remove Traffic Control Devices
1
LS
$ 2,000.00
$ 2,000.00
8
Water Valve / Sanitary Clean-out adjustment
1
Ea
$ 500.00
$ 500.00
9
ADDITIVE ALTERNATE
10
Furnish & Install Flex Base Type "A", Grade 1 (TxDOT 247)
40
Tons
$ 70.00
$ 2,800.00
Subtotal:
$ 28,925.56
Contingencies and Miscellaneous Items
15%
$ 4,338.83
Construction Total:
$ 33,264.39
Quality Control and Material Testing
2.50%
$ 831.61
Estimated Project Total:
$ 34,096.00
USE:
$ 35,000.00
6 7 ('mss l2c>17
JACLERICAL\Anna\I-General Services\4007•City Projects\238-2017 Street Rehab Project\Eng-EstimalesTstimate & Quantity Sheet xlsx Page I of I