Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Res 2019-12-658 Municipal Complex Ph 2
CITY OF ANNA, TEXAS RESOLUTION NO.ot9-ld .. 66e A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING THE CITY MANAGER TO FUND THE MUNICIPAL COMPLEX BUILDING CONSTRUCTION PHASE 2 AS IDENTIFIED IN EXHIBIT A OF THE EXECUTED AIA A133-2009 CONTRACT BY AND BETWEEN THE CITY OF ANNA, TEXAS AND LEE LEWIS CONSTRUCTION, INCORPORATED, FOR THE MUNICIPAL COMPLEX FOR THE CITY OF ANNA AS SHOWN IN EXHIBIT "1" ATTACHED HERETO AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Anna contracted with Lee Lewis Construction, Incorporated to be the Construction Manager for the Municipal Complex for the City of Anna; and, WHEREAS, the Construction Manager has completed a bid process and sub -contractor selection for the Municipal Complex Building Construction Phase 2; and, WHEREAS, the Municipal Complex Construction Project is listed as a capital improvement project in the City of Anna's Capital Improvement Plan; and, WHEREAS, the Phase 2 construction phase budget is included as a component of the overall Guaranteed Maximum Price (GMP) for the project; and, WHEREAS, Municipal Bond Funds shall be used to fund the project; and, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS THAT: Section 1. Recitals Incorporated The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Authorization of Contracts and Funding. That the City Manager is hereby authorized to fund the Phase 2 services as shown in Exhibit A of the executed AIA A133-2009 Contract, as shown in Exhibit "1" attached hereto. PASSED AND APPROVED by the City Council of the City of Anna, Texas on this 10th day of December 2019. ATTEST: APPROVED: City Secretary, Carrie L. Smith o```QF�A jVti'%,,' Mayor, Nate Pike Al 1 i �ol� g) �, ,-*.-,AIA ■ ■ Document Al33'm- 2009 Exhibit A Guaranteed Maximum Price Amendment for the following PROJECT: (Nance and address or location) City of Anita Municipal Complex (PHASE 2) ADDITIONS AND DELETIONS: Northwest Corner of 7n' St. and Powell Pkwy., Anna, TX The author of this document has added information needed for its THE OWNER: completion. The author may also (Name, legal slnlas and address) have revised the text of the original AIA standard form. An Additions and Report that notes added City of Anna information information as well as revisions to the I 1 I N. Powell Pkwy, standard form text is available from Anna, TX 75409-0776 the author and should be reviewed. A vertical line in the left margin of this THE CONSTRUCTION MANAGER: document indicates where the author (Name, legal slalus and address) has added necessary information and where the author has added to or Lee Lewis Construction, Inc. deleted from the original AIA text. 17177 Preston Rd., Ste, 160 Dallas, TX 75248 This document has important legal consequences. Consultation with an ARTICLE A,1 attorney is encouraged with respect § A.1,1 Guaranteed Maximum Price to its completion or modification. Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby AIA Document A201111-2007, amend the Agreement to establish a Guaranteed Maximum Price. As agreed by tine Owner General Conditions of the Contract and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract for Construction, is adopted in this Sum shall not exceed, The Contract Sun consists of the Construction Manager's Fee plus document by reference. Do not use the Cost of the Work, as that term is defined in Article 6 of this Agreement. with other general conditions unless this document is modified. § A.1.1.1 The Contract Suin is guaranteed by the Construction Manager not to exceed Twenty Four Million Five Hundred Sixty Five Thousand Three Hundred Thirty Six Dollars ($24,565,336.00), subject to additions and deductions by Change Order as provided in the Contract Documents. The Guaranteed Maximum Price to date is: GMP No.I..........................................$ 1,911,193.00 GMP No. 2 ..........................................$24,565,336.00 Total ................................. . . ...... . ........ $26,476,529.00 § A.1,1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is all itemized statement of the Guaranteed Maximum Price organized by trade categories, allowances, contingencies, alternates, the Construction Manager's Fee, and other items that comprise the Guaranteed Maximum Price. (Provide below or reference an atlachment.) § A.1,1.3 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: Inst. AIA Document A133TM — 2009 Exhibit A. Copyright ® 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document Is protected by U,S. Copyright Law and Intem■tlonal Trestles. Unauthorized reproduction or distribution of this AIA" Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law, This document was 1 produced by AIA software at 13:50:24 ET on 12/10/2019 under Order No,4171348595 which expires on 04/24/2020, and is not for resale. User Notes: (676046697) (State the numbers or other identification o,'accepled alternates. if the Contract Documents permit the (honer to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates sholring the amount for each and the date lvhen the amount expires) § A.1.1.4 Allowances included in the Guaranteed Maximum Price, if any: (Identify allowance and state exclusions, if any, from the allmrance price) Item Price ($0.00) § A.1.1.5 Assumptions, if any, on which the Guaranteed Maximum Price is based: § A.1,1.6 The Guaranteed Maximum Price is based upon the following Supplementary and other Conditions of the Contract: Document Title Date Pages § A.1.1.7 The Guaranteed Maximum Price is based upon the following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Agreement.) See Exhibit B Section Title Date Pages § A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings: (Either list the Dr•mvings here, or refer to an exhibit attached to this Agreement.) See Exhibit B Number Title Date § A.1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Agreement.) Exhibit B: Index of Drawings and Specifications Exhibit C: GMP Summary, Dated December 6, 2019 Exhibit D: VE Worksheet ARTICLE A.2 §A11 The date of Substantial Completion established by this Amendment: March 15, 2021 IMPORTANT: Notwithstanding any provisions of this Agreement or any other document, the Guaranteed Maximum Price referenced in §A.1.1.1 as "GMP No. l" in the amount of $1,911,193.00 is the maximum Contract Sunt for "Phase I" of the Project (Early Site Work), and the Guaranteed Maximum Price referenced in §A.1.l .1 as "GMP No. 2" in the amount of $24,565,336.00 is the maximum Contract Sum for "Phase 2" of the Project (all portions of the Project save and except than the Early Site Work). Notwithstanding any other provisions of this Agreement or any other document, the Guaranteed Maximum Price referenced in §A.1.1.1 as "Total" in the amount of $26,476,529.00 is the Guaranteed Maximum Price for the entirety of the Project including both Phase I of the Project (Early Site Work) and Phase 2 of the Project (all portions of the Project save and except the Early Site Work) and the Contract Sum for the entirety of the Project shall not exceed $26,476,529.00. Init. AIA Document A1331"— 2009 Exhibit A. Copyright m 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA, Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was t produced by AIA software at 13:50:24 ET on 12/10/2019 under Order No.4171348595 which expires on 04/24/2020, and is not for resale, User Notes: (876046697) OWNE Si -Pre) (Printed name and title) *S—TRU ION MANAGER (Signalilre) Jim Graham, Vice President Preconstruction (Printed name and lit%) AIA Document A133TM — 2009 Exhibit A. Copyright®1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA Init. Document Is protected by U.S. Copyright Law and International Trestles. Unauthorized reproduction or distribution of this AIA* Document, or any portion of it, may result In seven civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was I produced by AIA software at 13:50:24 ET on 12/10/2019 under Order No.4171348595 which expires on 04/24/2020, and is not for resale User Notes: (676046697) Additions and Deletions Report for AIA° Document A 133T1A — 2009 Exhibit A This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is Indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 13:50:24 ET on 12/10/2019. PAGE 1 City of Anna Municipal Complex (PHASE 2) Northwest Corner of 711, St. and Powell Pkwy., Anna, TX City of Anna I I I N. Powell Pk". Anna, TX 75409-0776 Lee Lewis Construction, Inc. 17177 Preston ltd., Ste. 166 Dallas, TX 75248 § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceedTwenty Four Million Five Hundred Sixty Five Thousand Three Hundred Thirty Six Dollars ($24,565336.00),6ubject to additions and deductions by Change Order as provided in the Contract Documents, The Guaranteed Maximum Price to date is: GMP No.I................................'...:..,..S24,565,336.00 ...........,........$ 1,911,193.00 GMP No 2 ......... ....-...524 SfiS 336.00 Total. .$26,476,529.00 PAGE 2 See Exhibit B See Exhibit B Exhibit B: Index of Drawings and Specifications Exhibit C: GMP Summary., Dated December 6. 201 Exhibit D: VE Worksheet Additions and Deletions Report for AIA Document A133T" — 2009 Exhibit A. Copyrlght®1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:24 ET on 12/10/2019 under Order No.4171348595 which expires on 04/24/2020, and is not for resale. User Notes: (876046697) § A.2.1 The anticipated date of Substantial Completion established by this Amendment: March 15, 2021 IMPORTANT: Notwithstanding any provisions of this Aa:reemcnt or anv other document, the Guaranteed Maximum Price referenced in A, I.1.1 as "GMP No. I" in the amount of S 1,911.193.00 is the maximum Contract Sum for "Phase I" of the Project (Early Site Work), and the Guaranteed Maximum Price referenced in &A.1.1.1 as "GMP No. 2" in the amount of 524,565.336.00 is the maximum Contract Sum for "Phase 2" of the Proiect fall portions of the Proiect save and except than the Carly Site Work), Not%vit lstanding any other Brovisions of this Agreement or any ... 1—d......... — -.1..,f:.............:...1'►A--:....... tt..,.. ...t1.......,...r :.. c ♦ t I . nT..._rn :.. .L_ -re�c A�cern nn the entirety of the Proiect shall not exceed $26.476,529.00. PAGE 3 Jim Graham, Vice President Preconstruction Additions and Deletions Report for AIA Document A1337"-2009 Exhibit A. Copyright ®1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA* Document Is protected by U.B. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAm Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:24 ET on 12/10/2019 under Order No.4171348595 which expires on 04/24/2020, and is not for resale User Notes: (876046697) Certification of Document's Authenticity AIA® Document D401 T'" — 2003 I, , hereby certify, to the best of my knowledge, information and belief, that 1 created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 13:50:24 ET on 12/10/2019 under Order No. 4171348595 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIAa Document A 133T"r — 2009 Exhibit A, Guaranteed Maximum Price Amendment , as published by the AIA in its software, other than those additions and deletions shown in the associated Additions and Deletions Report. (Signed) (Title) (Dated) AIA Document D401 T6 — 2003. Copyright© 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AIAe Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may 7 result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:50:24 ET on 12/10/2019 under Order No.4171348595 which expires on 04/24/2020, and is not for resale. U (876046697) User Notes: Exhibit "B" Page 1 of 6 initial Anna Municipal Complex City Hall Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Desai tton Date Revision GENERAL G1.00 SHEET INDEX 911912019- Not Sealed 2101 GENERAL NOTES AND LEGENDS 9/1912019- Not Sealed G1,02 LIFE SAFETYAND CODE ANALYSIS 91192019- Not Seated 62.01 LIFE SAFETY PLAN - LEVEL 01 91192019- Not Seated 0202 LIFE SAFETY PLAN - LEVEL 02 9119/2019- Not Seated CIVIL Caol GENERAL NOTES AND ABBREVIATIONS 7/19/2019 10/112019 C0.01A CITY OF ANNA GENERAL NOTES _ 7/19/2019 1011/2019 C0.02 EXISTING CONDITIONS 7/1912019 -Not Sealed C003 DEMOLITION PLAN - PHASE 1 7/1912.019 10/1/2019 C0.04 DEMOLITION PLAN - PHASE II 7/19/2019 10/1)2019 C0.05 PIAT 711912019- Not Sealed C101 DIMENSION CONTROL PLAN PHASE 1 7/19/2019 10/1/2019 C1 02 DIMENSION CONTROL PLAN PHASE II 7/1912019 10/12019 C103 DIMENSION CONTROL PLAN ADD ALTERNATES 7/1912019 10/112019 C2 01 C2.02. PHASE I GRADING PLAN - OVERALL PHASE I GRADING PLAN - NORTHWEST .._7/19/2019 7(1912019 10/1/2019 10/1/2019 02.03 PHASE I GRADING PLAN - NORTHEAST 7119!2019 10/1/2019 C2,04 PHASE I GRADING PLAN - SOUTHEAST 7/19/2019 10/1/2019 C2 05 IPHASE 1 GRADING PLAN - SOUTHWEST 7119/2019 10/1/2019 C2.06 PHASE 11 GRADING PLAN - OVERALL 7/1912019 10/112019 C2.07 PHASE 11 GRADING PLAN - SOUTHEAST. 7/1912019 10112019 C2.06 PHASE it GRADING PLAN SOUTHWEST 7/19/2019 10/112019 02.09 ADD ALTERNATE GRADING PLAN OVERALL 7/190019 10/1/2019 C2._10 ADD ALTERNATE GRADING PLAN SOUTHEAST 7/1912019 10/112019 C211 ADD ALTERNATE GRADING PLAN SOUTHWEST 7/19/2019 10/12019 02.12 ADD ALTERNATE GRADING PLAN NORTHEAST 7/1912019 10/1/2019 03.01 OVERALL UTILITY MAP . 71192019 10/112019 C3.02 WASTEWATER PROFILES 7/1912019 10/12019 C303 TELECOM PLAN 7/192019 10/12019 C3 04 TELECOM PROFILES 7/19/2019 1011/2.019 C4.01 EXISTING DRAINAGE AREA MAP - 71192019 10/12019 C4 02 PROPOSED DRAINAGE AREA MAP 7/192019 10/12019 C4.03 IDETENTION BASIN PLAN AND DETAILS 7/19/2019 10/1/2019 C4.04 DETENTION BASIN CALCULATIONS 7/19/2019 C4 05 STORM DRAIN PLAN 7119/2019 10/1/2019 C4.06 STORM DRAIN PROFILES - SHEET 1 OF 2 7119/2019 10/1/2019 C4 07 STORM DRAIN PROFILES - SHEET 2 OF 7/192019 10/1/2019 C501 PAVING PLAN 7/19/2019 10/1/2019 C6.01 PAVING DETAILS 7/19/2019 10/12019 C6.02 SITE DETAILS 7/192019 10/112019 07.01 EROSION CONTROL PLAN - PHASE 1 7/19/2019 C7.02 EROSION CONTROL PLAN - PHASE it 7/19/2019 C703 EROSION CONTROL DETAILS - 1 OF 2 7/19/2019 C7 04 EROSION CONTROL DETAILS - 2 OF 2 7/192019 Page 1 of 6 initial Exhibit "B" Page 2 of 6 In't ai Anna Municipal Complex City Hail Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Shaet Descri tion Date Revision ARCHITECTURAL Al 00 BUILDING LOCATION 9119/2019- Not Sealed A! 01 SITE PLAN 9/1912019- Not Sealed Al 01A SITE PLAN - CITY REVIEW 9/1912019- Not Sealed At 21 SITE DETAILS 9119!2019- Not Sealed Al 02 ISITE PLAN ALTERNATE 1 & 2 91192019- Not Sealed A1,10 SITE PLAN ENLARGED 9/192019- Not Sealed At 11 SITE PLAN ENLARGED 9119f2019- Not Sealed Al 21 SITE DETAILS 9119)2019- Hot Sealed A2 00 ARCHITECTURAL PLAN - FOUNDATION 9/1912019- NotSealed. A2.01 ARCHITECTURAL PLAN - LEVEL 01 9/19/2019- Not Sealed A2A1D DIMENSION PLAN - LEVEL 01 .9119/2019 -Nat Sealed A202 ARCHITECTURAL PLAN - LEVEL 02 .911912019- Not Sealed A2 02D DIMENSION PLAN - LEVEL 02 911912019- Not Sealed A2 03 ARCHITECTURAL PLAN - LEVEL ROOF 911912.019- Not Sealed A2 20 WALL PARTITION TYPES 9/1912019- Not Sealed A2 31 TYPICAL ROOF DETAILS 911912019-. Not Sealed A301 ENLARGED PLAN - COUNCIL CHAMBER .911912019- Not Sealed A3 02 ENLARGED PLANS- VERANDA 911912019- Not Sealed A3.03 ENLARGED PLANS- GROUP RESTROOMS 911912019 -Not Seated A3.04 ENLARGED PLANS- INDIVIDUAL. RESTROOMS .911 92 01 9- Not Sealed A3.05 ENLARGED PLANS - POLICE LOCKERS AND TOILET 9/192019- Not Sealed A3 21 ENLARGED PLAN DETAILS 9119/2019- Not Sealed A3 22 ENLARGED PLAN DETAILS 911912019- Not Sealed A3 22 01 JENLARGED PLAN DETAILS 9/192019- Not Sealed A3 23 ENLARGED PLAN DETAILS 9119/2019- Not Sealed A3 24 ENLARGED PLAN DETAILS 911 912 01 9- Not Sealed A4.01 EXTERIOR ELEVATIONS 91192019- Not Sealed A4.02 EXTERIOR ELEVATIONS 911912019- Not Sealed A4 03 EXTERIOR ELEVATIONS 9/1912019- Not Sealed A4 04 EXTERIOR ELEVATIONS 9/1912019- Not Sealed A4.11 BUILDING SECTIONS 9119P2019- Not Sealed Ad 12 BUILDING SECTIONS 9/1912019- Not Sealed A4-13 BUILDING SECTIONS 9/19/2019- Not Sealed A5.01 WALL SECTIONS 9119Y2019- Not Sealed A5.02 WALL SECTIONS 9/1912019 -.Not Sealed A5,03 WALL SECTIONS 9/1912019- Not Sealed AS 03 -ALT IWALL SECTIONS 911912019- Not Sealed A5.04 WALL SECTIONS 9/192019 -Not Sealed A504 -ALL. WALL SECTIONS 9/1912019 -Not. Sealed A505 WALL SECTIONS 91192019- Not Sealed A505 -ALT. WALL SECTIONS 9/1912019- Not Sealed A5.06 WALL SECTIONS 9/192019-NotSealed A5.06 -ALT. WALLSECTIONS 911912019- Not Sealed Page 2 of 6 In't ai Exhibit "B" Page 3 of 6 Initial Anna Municipal Complex City Hall Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision A5.11 WALL SECTION DETAILS 9/10!2019 -Not Sealed A5.12 WALL SECTION DETAILS 9092019- Not Sealed A5.13 WALL SECTION DETAILS 9119/2019- Not Sealed A5.14 WALL SECTION DETAILS 9119/2019- Not Sealed A5,15 WALL SECTION DETAILS 9/19/2019- Not Sealed A5.16 IWALL. SECTION DETAILS 91192019 -Not Sealed A550 TYPICAL EXTERIOR OPENING DETAILS 911912019- Not Sealed A6.01 REFLECTED CEILING PLAN - LEVEL 01 9/19/2019- Not Sealed A6 02 REFLECTED CEILING PLAN - LEVEL 02 9/192019- Not Sealed A6 11 REFLECTED CEILING PLAN - ENLARGED - COUNCIL CHAMBER 9119J20-19- Not Sealed A6.12 REFLECTED CEILING PLAN - ENLARGED - CONFERENCE ROOMS 9119/2019- Not Sealed A6 21 REFLECTED CEILING PLAN - DETAILS 917912019- Not Sealed A7.01 JDOOR SCHEDULE DOOR PANEL AND FRAME STYLES 9/1912019- Not Sealed Alit DOOR DETAILS -HOLLOW METAL 9/192019 -Not Sealed. A7.12 DOOR DETAILS - STOREFRONT 9/19/2019- Not Sealed. A7.13 DOOR DETAILS - EGRESS DOOR 911912019- Not Sealed.. A7.21 WINDOW ELEVATIONS 9/192019- Not Sealed A7.22 GLAZING ELEVATIONS - CURTAINWALL 9/1912019-NotSealed A7.23 GLAZING ELEVATIONS - CURTAIN WALL 9/1012019 -Not Sealed A7.24 GLAZING ELEVATIONS - INTERIOR 911912019- Not Sealed A7.30 SKYLIGHT - PLANS AND SECTIONS 911912019- Not Sealed A6 01 ISTAIR 1 - PLANS AND SECTIONS 91192019- No] Sealed AS 02 ISTAIR 2 - PLANS AND SECTIONS 9/1912019- Not Sealed AS 03 IGRAND STAIR - PLANS AND SECTIONS 9/19/2019- Not Sealed AS 21 STAIR DETAILS. 911912019 -Not Sealed AS 31 ELEVATOR.. 91192019- Not Sealed A9 OOM FINISH SCHEDULE 9/1912019- Not Sealed A901 FINISH PLAN - LEVEL. 01 9/19/2019- Not Sealed A9 01P PATTERN PLAN, LEVEL 01 9(192019- Not Sealed A9.02 FINISH PLAN - LEVEL 02 9/192019- Not Sealed A9 02P IPATTERN PLAN - LEVEL 02 9/192019- Not Sealed A9.11 FURNITURE PLAN - LEVEL Ot 9119/2019- Not Sealed A9.12 FURNITURE PLAN - LEVEL 02 9/19/2019- Not Sealed A9.21 MAIN LOBBY & PUBLIC CORRIDOR ELEVATIONS 9/1912019- Not Sealed A92.2 INTERIOR ELEVATIONS 9/192019- Not Sealed A923 INTERIOR ELEVATIONS 911912019- Not Sealed A924 COUNCIL CHAMBER INTERIOR 911912019- Not Sealed A925 ICOUNCIL CHAMBER INTERIOR 91192019- Not Sealed A9.31 MILLWORK ELEVATIONS 911912019- Not Sealed AS 32. MILLWORK ELEVATIONS 9/1912019- Not Sealed A9.33 MILLWORK ELEVATIONS 9/1912019- Not Sealed A9.41 MILLWORKSECTIONS 9/192019 -Not Sealed A9, 51 MILLWORK DETAILS 91192019- Not Sealed A9 61 MILLWORK - DAIS 9119/2019- Not Sealed A962 MILLWORK -RECEPTION DESK 91192019 -Not Sealed A971 MILLWORK SPECIALTY-- 911912019- Not Sealed A10.01 ISIGNAGE 9/192019 -Not Sealed Page 3 of 6 Initial Exhibit "B" Page 4 of 6 fnival _. Anna Municipal Complex City Hall Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision STRUCTURAL SO GO GENERAL NOTES 9119/2019- Not Sealed S001 GENERAL NOTES 9/1912019- Not Sealed 5002 GENERAL NOTES 9/1912019- Not Sealed 50.03 GENERAL NOTES 9/1912019- Not Sealed 51.00 STRUCTURAL SITE PLAN 911912019- Not Sealed 51.01 OVERALL THREE - DIMENSIONAL VIEWS 91192019- Nol Sealed 52.01 FOUNDATION PLAN - LEVEL 01 9/1912019- Not Sealed S2.02 FRAMING PLAN - LEVEL 02 91192019- Not Sealed. S2.03 ROOF FRAMING PLAN 9/19/2019- Not Sealed 52.10 ENLARGED FOUNDATION PLAN - LEVEL 01 - COUNCIL CHAMBER 9/19/2.019- Not. Seated S2.11 ENLARGED FRAMING PLAN - LEVEL 02 - COUNCIL CHAMBER 9/19/2019- Not. Sealed S2.12 ENLARGED ROOF FRAMING PLAN - COUNCIL CHAMBER 9/19/2019- Not Sealed S2.20 ENLARGED FRAMING PLANS 91192019- Not Sealed S3 GO TYPICAL FOUNDATION DETAILS 9/19/2019- Not Sealed S3.01 TYPICAL FOUNDATION DETAILS 9/192019- Not Sea -led S310 FOUNDATION DETAILS 91192019- Not Sealed S311 FOUNDATION DETAILS 911912019. Not Sear S3 20 FOUNDATION DETAILS 911912019- Not Sealed S400 ITYPICAL CMU DETAILS 9/192019- Not Sealed S500 TYPICAL. STEEL. DETAILS 911912019- Not Seated S5.01 TYPICAL STEEL. DETAILS 911912019- Not Seated 55.02 TYPICAL STEEL. DETAILS 9/19/2019- Not Sealed 55..03.. TYPICAL STEEL DETAILS 9/192019- Not Sealed 5504 TYPICAL STEEL DETAILS 911912019- Not Sealed S5:10 STEEL DETAILS 9119/2019- Not Seated S5.11 ISTEEL DETAILS 9119/2019- Not Sealed STEEL DETAILS 9/1912019- Not Sealed STEEL DETAILS 9119/2019- Not Sealed STEEL BRACED FRAME ELEVATIONS 91192019- Not Sealed r:S540 TYPICAL STEEL BRACED FRAME DETAILS 9119/2019- Not Sealed STEEL ELEVATIONS 9/1912019 -Not Sealed STEEL ELEVATIONS 9/1912019- Not Sealed MECHANICAL M001 IMECHANICAL LEGEND _ 911912019- Not Sealed M002 MECHANICAL GENERAL NOTES 9/19)2019. Not Sealed M003 MECHANICAL SCHEDULES 9119/2019- Not Sealed M0.04 MECHANICAL SCHEDULES 9119/2019- Not Sealed M2.01 MECHANICAL PLAN - LEVEL 1 9/1912019- Not Sealed M202 MECHANICAL PLAN - LEVEL 2 911912019- Not Sealed M2.03 MECHANICAL PLAN - ROOF 91192019 -Not Sealed M5.01 IMECHANICAL CONTROLS 911912019. Not Sealed M5.02 MECHANICAL CONTROLS 911 912 01 9- Not Sealed M601 MECHANICAL DETAILS 9/1912019- Not Sealed M6.02 MECHANICAL DETAILS 9/1912019- N.tSealed M6.03 MECHANICAL DETAILS 9/192019- Net Seated M6.04 MECHANICAL DETAILS 9/19/2019- Not Sealed Page 4 of 6 fnival _. Exhibit "B" Page 5 of 6 Initial Anna Municipal Complex City Hall Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision ELECTRICAL EO Ot ELECTRICAL LEGEND AND NOTES _ 9119/2019- Not Sealed EO 02 ELECTRICAL ONE -LINE 911912019 -Not Sealed EO 03 ELECTRICAL SCHEDULES 911912019- Not Sealed. EO04ELECTRICAL SCHEDULES 9/19/2019 -Not Sealed EO 05 1 ELECTRICAL SCHEDULES 9119/2019- Not Sealed E1110 LIGHTING FIXTURE SCHEDULES 911912019- Not Sealed E0-11 LIGHTING CONTROLS 911912019- Not Sealed EI.01 ELECTRICAL SITE PLAN 9119/2019 -Not Seated E7.02 LIGHTING SITE PLAN 91190019- Not Sealed E2.01 ELECTRICAL PLAN - LEVEL 1 9119/2019- Not Sealed F2.02 ELECTRICAL PLAN - LEVEL 2 911912019- Not. Sealed E2 03 ELECTRICAL PLAN - ROOF 911912.019- Not Sealed E3.01 MECHANICAL POWER PLAN, LEVEL 1 9/191.019- NotSeaL<d E3.02 MECHANICAL POWER PLAN - LEVEL 2 91191019- Not Sealed E4 01 FIRE ALARM. RCP - LEVEL 1 911912079- Not Seated E4 02 FIRE ALARM RCP - LEVEL 2 911912019- Not Sealed E501 LIGHTING RCP - LEVEL 1 9/191019- Not Sealed E5 02 LIGHTING RCP - LEVEL 2 _ 9/191019- Not Sealed E6 01 ELECTRICAL ENLARGED PLAN 9/1912019- Not Sealed E7 Of ELECTRICAL DETAILS 9/192019- Not Sealed E7.02. ELECTRICAL DETAILS 9/191019- Not Sealed E7,03 ELECTRICAL DETAILS 9/1912019- Not Sealed ESO 01 SITE LEGEND AND NOTES 7/1912019 ESL01 ELECTRICAL SITE UTILITY PLAN 7119120`19 PLUMBING Po.01 PLUMBING LEGEND AND NOTES 911 912 01 9- Not Sealed P0.02 PLUMBING SCHEDULES 911912019- Not Sealed P1.01 PLUMBING PLAN - SITE 91192019 -Not Sealed P200 UNDERGROUND PLUMBING PLAN - LEVEL 1 911912019- Not Sealed P2.01 PLUMBING PLAN - LEVEL 1 911912019- Not Sealed P2 02 PLUMBING PLAN - LEVEL 2 9/192019- Not Sealed P203 PLUMBING PLAN - ROOF 911.92019- Not Sealed P3.01 PLUMBING ENLARGED PLAN 9119/2019- Not Sealed P4 01 IPLUMBING ISOMETRICS 911912019 -Not Sealed P501 IPLUMBING DETAILS 2119t2019- Not Sealed P5.02 PLUMBING DETAILS 9/19/2019- Not Sealed FIRE. PROTECTION FP201 FIRE PROTECTION PLAN - LEVEL 1 9/192019- Not Seated FP2.02 FIRE PROTECTION PLAN, LEVEL 2 91192019- Not Sealed AUDIO VISUAL AVIO.01 LEGEND AND NOTES - AUDIO VISUAL INFRASTRUCTURE 9/192019- Not Sealed AV12 Ot IFLOOR PLAN LEVEL 1 - AUDIO VISUAL INFRASTRUCTURE 91192019- Not Sealed AV12.02 FLOOR PLAN LEVEL 1 - AUDIOVISUAL INFRASTRUCTURE 9/1912019- Not Sealed AV12i t RCP LEVEL 1 - AUDIO VISUAL INFRASTRUCTURE 9119/2019- Not Sealed AV12.12 RCP LEVEL 2 - AUDIO VISUAL INFRASTRUCTURE 911912019- Not Sealed AV19.01 GENERAL DETAILS- AUDIO VISUAL INFRASTRUCTURE 91191019 -Not Sealed AVSO.01 LEGEND AND NOTES - SYSTEMS 911912019- Not Seated AVS201 FLOOR PLAN LEVEL i - SYSTEMS 9/1912019- Not Sealed AVSZO2 FLOOR PLAN LEVEL 2 -SYSTEMS 9119/2019- Not .Sealed AVS2.11 RCP LEVEL t - SYSTEMS 911912019- Not Seated AVS212 RCP LEVEL 2 - SYSTEMS 91192019- Not Sealed AVS5.01 ONE LINE DIAGRAM - SYSTEMS 9119/2019- Not Sealed AVS5.02 ONE LINE DIAGRAM - SYSTEMS 9/19!2019- Not Seated Page 5 of 6 Initial Exhibit "B" Page 6 or 6 Inilial Anna Municipal Complex City Hall Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision COMMUNICATIONS LO 01 LEGEND AND NOTES - COMMUNICATIONS 9/1912019- Not Sealed T1.01 SITE PLAN - COMMUNICATIONS 9119Q019- Not Sealed T2 01 FLOOR PLAN LEVEL 01 - COMMUNICATIONS 911912019- Not Sealed T2D2FLOOR PLAN LEVEL 02 - COMMUNICATIONS 9119/2019- Not Sealed 1`701 iMDF ROOM 112 - COMMUNICATIONS 9/19/2019- Not Sealed T7.02 OF ROOM 2010 - COMMUNICATIONS 911912019- Not Sealed T7-03 SERVER ROOM 249 - COMMUNICATIONS 9/19/2019- Not Sealed 1`901 GENERAL DETAILS - COMMUNICATIONS 9/1912419 -Not Sealed SECURITY SCO 01 LEGEND AND NOTES - SECURITY 911912419 -Not Sealed SDI 01 SITE PIAN - SECURITY 9/1912019- Not Sealed SC2 01 1 IST FLOOR -SECURITY 9/1912D19- Not Sealed SC2.02 2ND FLOOR - SECURITY 911 912 01 9- Not Sealed SC2 03 TOP OF ROOF DECK - SECURITY 911 912019- Not Sealed SC7.01 SC9.01 IDOOR ELEVATION DETAILS - SECURITY GENERAL. DETAILS - SECURITY 9119/2019 -Not Seated 9/1912019- Not Sealed TAS Al2 01 TEXAS ACCESSIBILITY STANDARDS 9119/2019- Not Sealed A1202 TEXAS ACCESSIBILITY STANDARDS 911912019 -Not Sealed A1203 TEXAS ACCESSIBILITY STANDARDS 9/19/2019 -Not Sealed A 12.04 TEXAS ACCESSIBILITY STANDARDS 91190019- Not Sealed A1205 ITEXAS ACCESSIBILITY STANDARDS 91192019- Not Sealed Al2.06 TEAS ACCESSIBILITY STANDARDS 91192019- Not Sealed LANDSCAPE Lt 01 HARDSCAPE PLAN No Date Provided 11.10 LANDSCAPE DETAILS No Dale Provided L2.01 LANDSCAPE PLAN No Date Provided L2.10 LANDSCAPE DETAILS No Date Provided L301 1IRRIGATION PLAN No Date Provided 13.10 IRRIGATION DETAILS No Date Provided SPECIFICATIONS RSA Project #1816 10 & 1816 20 CITY HALL/ MUNICIPAL COURT/POLICE/FIRE STATION 911912019 -Not Sealed GMP ADDENDUM#1 RSA PROJECT If: 1816.10 ANNA CITY HALL / MUNICIPAL COURT/ POLICE BUILDING 1010112019- Not. Sealed GMP ADDENDUM 1112 PROJECTM 1816 1 ANNA CITY HALL 11/1412019 Page 6 or 6 Inilial Exhibit "B" Page 1 of 4 Initial Anna Municipal Complex Fire Station Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision GENERAL G1.01 INDEX, NOTES AND LEGENDS 9/19/2019- Not Sealed G1,02 LIFE SAFETY AND CODE ANALYSIS 9/19/2019- Not Sealed G1.03 LIFE SAFETY AND CODE ANALYSIS 9/19/2019- Not Sealed G1 04 LIFE SAFETY AND CODE ANALYSIS 19/2019- Not Sealed 61.05 LIFE SAFETY AND CODE ANALYSIS aled 19/20gNot G2.01 LIFE SAFETY PLAN - LEVEL 01 19/20aled ARCHITECTURAL [9/1912019- 2.01 ARCHITECTURAL PLAN - LEVEL Ot aled A2.01D DIMENSION PLAN - LEVEL 01 19/2019- Not Sealed A2 02 MEZZANINE PLANS 9/19/2019- Not Sealed A2 03 ROOF PLAN 9/19/2019- Not Sealed A220 WALL PARTITION TYPES 9/19/2019- Not Sealed A3,01 ARCHITECTURAL PLAN - ENLARGED 9/19/2019- Not Sealed A3.02 ENLARGED PLANS - RESTROOMS 9/19/2019- Not Sealed A3.03 ENLARGED PLANS - RESTROOMS 9/19/2019- Not Sealed A3.11 ENLARGED PLAN DETAILS 9/19/2019- Not Sealed A3,12 ENLARGED PLAN DETAILS 9/19/2019- Not Sealed A3.31 TYPICAL ROOF DETAILS 911912019- Not Sealed A4.01 EXTERIOR ELEVATIONS 9/1912019- Not Sealed A4.11 BUILDING SECTIONS 9/19/2019- Not Sealed A4A2 BUILDING SECTIONS 9119/2019- Not Sealed A5.01 WALL SECTIONS 9/19/2019- Not Sealed A5,02 WALL SECTIONS 9/19/2019- Not Sealed A5.03 WALL SECTIONS 9/19/2019- Not Sealed A5.04 WALL SECTIONS 9/19/2019- Not Sealed A5,05 WALL SECTIONS 911912019- Not Sealed A5.11 SECTION DETAILS 9119/2019- Not Sealed A512 SECTION DETAILS 9/19/2019- Not Sealed A5.13 SECTION DETAILS 9/19/2019- Not Sealed A6.01 REFLECTED CEILING PLAN - LEVEL 01 9119/2019- Not Sealed A6.02 REFLECTED CEILING PLAN - MEZZANINE 9/1912019- Not Sealed A6.21 REFLECTED CEILING PLAN - DETAILS 9/1912019- Not Sealed A7,01 DOOR SCHEDULE 9/19/2019- Not Sealed A7.11 DOOR DETAILS - HOLLOW METAL 9/19/2019- Not Sealed A7.11A DOOR PANEL AND FRAME STYLES 9/19/2019- Not Sealed A7.12 DOOR DETAILS - STOREFRONT 9/19/2019- Not Sealed A7.41 GLAZING ELEVATIONS 9/19/2019- Not Sealed A8.51 STAIR AND RAILING 9/19/2019- Not Sealed A9.00M MASTER FINISH SCHEDULE 9/19/2019- Not Sealed A9.01 FINISH PLAN - LEVEL 01 & MEZZANINE 9/19/2019- Not Sealed A9 01 P PATTERN PLAN - LEVEL 01 9/19/2019- Not Sealed A9.11 FURNITURE & DEVICE PLAN - LEVEL 01 9119/2019- Not Sealed A9 21 INTERIOR ELEVATIONS 9/1912019- Not Sealed Page 1 of 4 Initial Exhibit "B" Page 2 of 4 Initial Anna Municipal Complex Fire Station Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision A9 22 DAYROOM INTERIOR ELEVATIONS 9/19/2019- Not Sealed A9.23 APPARATUS BAY INTERIOR ELEVATIONS 911912019- Not Sealed A924 APPARATUS BAY INTERIOR ELEVATIONS 9/1912019- Not Sealed A9.31 MILLWORK ELEVATIONS 9/19/2019- Not Sealed A9.41 MILLWORK SECTIONS & DETAILS 1 9/19/2019- Not Sealed A10 01 SIGNAGE 9/1912019- Not Sealed STRUCTURAL S0.00 GENERAL NOTES 9/1912019- Not Sealed S0.01 GENERAL NOTES 9/19/2019- Not Sealed S0.02 GENERAL NOTES 9119/2019- Not Sealed S0,03 GENERAL NOTES 9/19/2019- Not Sealed S0.04 GENERAL NOTES 9/19/2019- Not Sealed S0.05 GENERAL NOTES 911 912 01 9- Not Sealed 51.00 STRUCTURAL SITE PLAN 9/19/2019- Not Sealed 51.01 OVERALL THREE - DIMENSIONAL VIEWS 9/19/2019- Not Sealed 52.01 FOUNDATION PLAN - LEVEL 01 911912019- Not Sealed 52.02 MEZZANINE FRAMING PLAN 9/19/2019- Not Sealed S2.03 LOW ROOF FRAMING PLAN 911912019- Not Sealed S2.04 MID ROOF FRAMING PLAN 911912019- Not Sealed S2.05 HIGH ROOF FRAMING PLAN 9119/2019- Not Sealed S2.10 ENLARGED FRAMING PLANS 9/1912019- Not Sealed S3.00 TYPICAL FOUNDATION DETAILS 9119/2019- Not Sealed S3.01 TYPICAL FOUNDATION DETAILS 9/1912019- Not Sealed S3.10 FOUNDATION DETAILS 9/1912019- Not Sealed S3.11 FOUNDATION DETAILS 9/19/2019- Not Sealed S3.20 CONCRETE WALL ELEVATIONS 9/19/2019- Not Sealed S4.00 TYPICAL CMU DETAILS 9119/2019- Not Sealed S4.01 TYPICAL CMU DETAILS 9119/2019- Not Sealed S4-02 CMU FRAMING DETAILS 9/19/2019- Not Sealed S5.00 TYPICAL STEEL DETAILS 9/19/2019- Not Sealed S501 TYPICAL STEEL DETAILS 9119/2019- Not Sealed 55.02 TYPICAL STEEL DETAILS 9/19/2019- Not Sealed S5.03 TYPICAL STEEL DETAILS 9119/2019- Not Sealed 55.04 TYPICAL STEEL DETAILS 9/19/2019- Not Sealed S520 STEEL DETAILS 9/1912019- Not Sealed S5.30 STEEL ELEVATIONS 9/19/2019- Not Sealed S6.00 WOOD DETAILS 9119/2019- Not Sealed S6.10 WOOD TRUSS ELEVATIONS 911912019- Not Sealed S6.20 WOOD TRUSS LOADING 9119/2019- Not Sealed MECHANICAL M0,01 MECHANICAL LEGEND 9119/2019- Not Sealed M0.02 MECHANICAL GENERAL NOTES 9119/2019- Not Sealed M0.03 MECHANICAL SCHEDULES 911912019- Not Sealed M0.04 IMECHANICAL SCHEDULES 9/19/2019- Not Sealed Page 2 of 4 Initial Exhibit "B" Page 3 of 4 Initial Anna Municipal Complex Fire Station Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision M2.01 MECHANICAL PLAN - LEVEL 1 9119/2019- Not Sealed M2:02 MECHANICAL PLAN - LEVEL 2 9/1912019- Not Sealed M2.03 MECHANICAL PLAN - ROOF 9/19/2019- Not Sealed M5.01 MECHANICAL CONTROLS 9/19/2019- Not Sealed M5 02 MECHANICAL CONTROLS 9/1912019- Not Sealed M6.01 MECHANICAL DETAILS 9119/2019- Not Sealed M6.02 MECHANICAL DETAILS 9/1912019- Not Sealed M6 03 MECHANICAL DETAILS 9119/2019- Not Sealed M6.04 MECHANICAL DETAILS 9/19/2019- Not Sealed ELECTRICAL E0,01 ELECTRICAL LEGEND AND NOTES 911912019- Not Sealed E0.02 ELECTRICAL ONE -LINE 9/1912019- Not Sealed E0.03 ELECTRICAL SCHEDULES 911912019- Not Sealed E0.04 ELECTRICAL SCHEDULES 9/19/2019- Not Sealed E0.05 LIGHTING FIXTURE SCHEDULE 9/19/2019- Not Sealed E0, 06 LIGHTING CONTROLS 9119/2019- Not Sealed E2.01 ELECTRICAL PLAN - LEVEL 1 9/1912019- Not Sealed E2.02 ELECTRICAL PLAN - LEVEL 2 9/19/2019- Not Sealed E2.03 ELECTRICAL PLAN - ROOF 9/19/2019- Not Sealed E3.01 MECHANICAL POWER PLAN - LEVEL 1 911912019- Not Sealed E3.02 MECHANICAL POWER PLAN - LEVEL 2 9/19/2019- Not Sealed E4.01 FIRE ALARM RCP - LEVEL 1 9/19/2019- Not Sealed E4.02 FIRE ALARM RCP - LEVEL 2 9/1912019- Not Sealed E5 01 REFLECTED CEILING LIGHTING PLAN - LEVEL 1 9/7912019- Not Sealed 125.02 REFLECTED CEILING LIGHTING PLAN - LEVEL 2 9/19/2019- Not Sealed E7.01 ELECTRICAL DETAILS 9119/2019- Not Sealed ET02 ELECTRICAL DETAILS 9/19/2019- Not Sealed FIRE PROTECTION FP2.01 FIRE PROTECTION PLAN - LEVEL 1 9/19/2019- Not Sealed FP2.02 FIRE PROTECTION PLAN - MEZZANINE 9/1912019- Not Sealed PLUMBING P0.01 PLUMBING LEGEND AND NOTES 9119/2019- Not Sealed P0.02 PLUMBING SCHEDULES 9/19/2019- Not Sealed P2.00 UNDERFLOOR PLUMBING PLAN - LEVEL 1 9/1912019- Not Sealed P2.01 PLUMBING PLAN - LEVEL 1 9/19/2019- Not Sealed P2.02 PLUMBING PLAN - MEZZANINE 9119/2019- Not Sealed P2.03 PLUMBING PLAN - ROOF 9/1912019- Not Sealed P3.01 PLUMBING ENLARGED PLAN 9/19/2019- Not Sealed P4.01 PLUMBING ISOMETRICS 9119/2019- Not Sealed P5.01 PLUMBING DETAILS 9119/2019- Not Sealed P5,02 PLUMBING DETAILS 9/19/2019- Not Sealed AUDIO VISUAL AVO 01 LEGEND AND NOTES - AUDIO VISUAL INFRASTRUCTURE 9/19/2019- Not Sealed AV12.01 FLOOR PLAN - LEVEL 01 & MEZZANINE - AUDIO VISUAL INFRASTRUCT 9/19/2019- Not Sealed Page 3 of 4 Initial Exhibit "B" Page 4 of 4 Initial Anna Municipal Complex Fire Station Anna, TX JOB # 1967 December 6, 2019 INDEX OF DRAWINGS Sheet Description Date Revision AVI2.11 RCP - LEVEL 01 & MEZZANINE - AUDIO VISUAL INFRASTRUCTURE 9119/2019- Not Sealed AVI9:01 GENERAL DETAILS - AUDIO VISUAL INFRASTRUCTURE 9119/2019- Not Sealed AVS5.01 ONE LINE DIAGRAM - AUDIO VISUAL SYSTEMS 9/19/2019- Not Sealed COMMUNICATIONS TO -01 LEGEND AND NOTES - COMMUNICATIONS 1 9/19/2019• Not Sealed T2,01 FLOOR PLAN - LEVEL Ot & MEZZANINE - COMMUNICATIONS 9/19/2019- Not Sealed T7,01 MDF ROOM 1278 - COMMUNICATIONS 9/19/2019- Not Sealed T9.01 GENERAL DETAILS - COMMUNICATIONS 9/19/2019- Not Sealed SECURITY SCO 01 LEGEND AND NOTES - SECURITY 9/1912019- Not Sealed SC2.01 FLOOR PLAN - LEVEL Ot & MEZZANINE - SECURITY 911 912 01 9- Not Sealed SC2.02 ROOF PLAN - SECURITY 9/19/2019- Not Sealed SC7.01 DOOR ELEVATION DETAILS - SECURITY 9/19/2019- Not Sealed SC9.01 GENERAL DETAILS - SECURITY 9/19/2019- Not Sealed TAS Al2.01 TEXAS ACCESSIBILITY STANDARDS 9/19/2019- Not Sealed Al2.02 TEXAS ACCESSIBILITY STANDARDS 9119/2019- Not Sealed Al2.03 TEXAS ACCESS181LITY STANDARDS 9/19/2019- Not Sealed Al2,04 TEXAS ACCESSIBILITY STANDARDS 9/19/2019- Not Sealed Al2,05 TEXAS ACCESSIBILITY STANDARDS 9/19/2019- Not Sealed Al2.06 TEXAS ACCESSIBILITY STANDARDS 9119/2019- Not Sealed SPECIFICATIONS RSA Project #1816 10 & 1816.20 CITY HALL / MUNICIPAL COURT I POLICE I FIRE STATION 9/19/2019- Not Sealed GMP ADDENDUM #1 RSA PROJECT #: 1816 20 ANNA FIRE STATION 10/01/2019- Not Sealed GMP ADDENDUM #2 RSA PROJECT N: 11,20 ANNA FIRE STATION 11/14/2019 Page 4 of 4 Initial EXHIBIT C General Conditions 1,ay or Anna ivlunicipal 1,omplex Anna, Texas GMP December 6, 2019 662,002 407,246 254,756 Cost of Work 70 446,033 262,584 19-3-14-6-9 Building Permit 0 Testing Services 0 1 Allowances 0 City Hall Water Feature and Water Purification Equipment 50,000 50,000 - Monument Sin 15,000 15,000 0 0 DIV 3 CONCRETE 0 03A CONCRETE 2,159,952 1,664,550 495,402 100 % Cased Piers 218,958 153,271 86,687 0 DIV 4 MASONRY 04A MASONRY 523,820 160,964 362,856 Flashing 63,375 42,378 20,997 Rigid Insulation 0 0 - DIV 5 METALS 0 05A STEEL 2,365,485 1,734,750 630,735 Additional 20% Steel per Struc note 281,500 221,250 60,250 Erection 0 - Misc Steel 157,090 132,630 24,460 05B DECORATIVE RAILING 508,092 508,092 0 DIV 6 WOODS & PLASTICS 0 06A ROUGH CARPENTRY 167,455 98,466 68 989 06B FINISH CARPENTRY 663 846 494,567 169,278 06C GLULAM TRUSS 376,700 376,700 0 DIV 7 THERMAL & MOISTURE PROTECTION 0 07A WATERPROOFING 208,750 144,269 64,481 07B ROOFING 665,835 410,093 255,742 07C EXPANSION JOINTS 5,580 - 5,580 07F TERRA COTTA CLADDING 1,282,691 936,267 344,424 07G COMPOSITE ALUMINUM PANELS 797,824 428,798 690260 -36-9-,0-2-6- a DIV 8 DOORS & WINDOWS 0 08A DOOR FRAMES HARDWARE 347,353 230,360 116,993 Door Install 24,200 16,600 7,600 Access Doors 7,500 5,500 2,000 08B OVERHEAD COILING DOORS 72,330 72,330 08C GLASS AND GLAZING 2,254,115 1,820,700 433,415 OBD BALLISTIC SECURITY WINDOW 15,000 15,000 08E SKYLIGHT 178,327 178,327 08F LOUVERS 2,440 2,440 - 0 DIV 9 FINISHES 0 09A DRYWALL 1,809,786 1,388 486 423,300 09B PORTLAND CEMENT STUCCO 232,994 221,952 11,042 09C STRETCHED -FABRIC WALL SYSTEMS 54.422 50,078 4,344 09D TILING 673,147 456,960 216,187 09F STONE FLOORING 274,712 274,712 - 09G RESILIENT FLOORING 0 09H RUBBER FLOORING 17,863 17,663 09J PAINTING 353,318 255,840 97,478 0 DIV 10 SPECIALTIES 0 10A MARKERBOARDS 29,200 29,200 10B SIGNAGE 68,523 30,171 38,352 10C TOILET PARTITIONS 41,100 16,559 24,541 Corner Guards 27,913 21,630 6.283 10D LOCKERS 10E MOBILE STORAGE SHELVES 69,435 2,500 69,435 2,500 10F PROTECTIVE GEAR STORAGE SYSTEMS 11,173 11,173 10G PRE ENGR CANOPIES 29,770 i 22,3161 7,454 Lee Lewis Construction Page 1 of 3 10H FLAGPOLES ,< 737 7,315 5,422 10J MISCELLANEOUS SPECIALTIES 1 OK DISPLAY CASE 3,000 10,936 8,000 3,000 2 936 0 DIV 11 EQUIPMENT 0 11A RESIDENTIAL APPLIANCES 40,029 16,254 23,775 11 B ATM KIOSK 19,312 19,312 11C FINGERPRINT STATION 3,600 3,600 11D METAL EVIDENCE LOCKERS 36,700 36,700 0 DIV 12 FURNISHINGS 0 12A WINDOW TREATMENTS 39,000 28,750 10,250 128 AUDITORIUM SEATING 65,061 65,061 12C SITE FURNISHINGS 41,432 41,432 0 DIV 13 SPECIAL CONSTRUCTION 0 13A SAUNA 8,160 8,160 DIV 14 CONVEYING SYSTEMS 0 0 14A ELEVATORS 134,120 134,120 0 DIV 21 FIRE SUPPRESSION 0 21A FIRE SUPPRESSION 209,441 129,675 79,766 0 DIV 22 PLUMBING 0 22A PLUMBING 0 0 DIV 23 HVAC 0 23A HVAC 2,690 495 1,770,380 920,115 Test and Balance 0 Controls 0 0 DIV 26 ELECTRICAL 0 26A ELECTRICAL 2,121,294 1,635,723 485,571 0 DIV 27 COMMUNICATIONS 0 27A COMMUNICATIONS 137,285 113,926 23,359 27B AUDIO - VISUAL452,243 27C INTERCOMM 20,742 330,908 16,009 121.335 4,733 0 DIV 28 LIFE SAFETY & SECURITY 0 28A ELECTRONIC SAFETY & SECURITY 274,519 238,406 36,113 Fire Alarm 138,403 68,462 69,941 0 DIV 31 EARTHWORK 0 31B TERMITE CONTROL 2,757 1,672 1,085 0 DIV 32 EXTERIOR IMPROVEMENTS 0 32A LANDSCAPING 286,110 286,110 32B PAVEMENT MARKINGS 7,860 7,860 32D FENCE 0 32E ASPHALT PAVING 15,000 15,000 32F WATER FOUNTAIN 290,001 290,001 32G PAVERS 44,987 44,987 0 SUBTOTAL Builder's Risk Insurance General LiabilityInsurance 22,333 61,078 82,321 18,175,184 43,839 130 861 7,147,146 17,239 51,459 Umbrella LiabilityInsurance 13,950 81,788 32,162 Pollution Policy5,064 :26.334,747 3,635 1,429 Construction Contingency- Allowance 50,000 466,6401 183,460 GC Contingency- Allowance 0 - Subtotal 18,901,849 7,432Fee ment end Performance Bon 79,364 9 ,185 416,841 139,377 163,524Pa 54,808 Subtotal of City Hall and Fire Station 27,108,297 19,457,066 7,661,231 Earl Site Package 1,911,1931 1,755,3861 155,807 Total 29,019,490 1 21,212,452 1 7,807,038 Lee Lewis Construction Page 2 of 3 r� Alternates: Additional paved parking area to the south of City Hall 182,780 Additional paved parking area to the east of City Hall 55,028 Install UV lighting at Police Men's and Women's Locker Rooms 5,716 Pavers and pedestal assemblies at City Hall Second Floor balconies 52,823 New mobile storage systems as specified in Section 105625 63,866 Porcelain panel rainscreen cladding at exterior walls 114,285 Install bullet resistant panels in walls adjacent to Customer Service windows at l 37,411 Fences and gates at Fire Station 323119 - Decorative Metal Fences and Gates. 7,532 Additional 12 trees, 19,170 Lee Lewis Construction Page 3 of 3 Exhibit D City Hall/Municipal Court/Police GMP from LLC as of 12.5.19 $21,212,452 7MTotal Fire Station GMP from LLC as of 12.5.19 $7,807,038 GMP Pricing for Municipal Complex as of 12.5.19 Including Sitework $29,019,490 Less Amendment # 1 - GMP Price for Early Site Work ($1,911,19;) GMP Cost to Complete Remainder of Work $27,108,297 Less Value of Accepted VE Items Below ($2,.'i42,961) Amendment # 2 - GMP Price to Construct Remainder of Project VE Item # Description VE Amount Ph. III -A2 Painted GFRC Exterior Columns in lieu of ACM column covers (;118,866) Ph. III -A3 Reduce number of full height wall partitions to just conference rooms, City Manager and between departmental suites ($d 1,280) Eliminate lighted handrails in fire stairs of City Hall, Provide wall mounted LED lighting on the three non -glass sides of the fire stair enclosures to provide code Ph. III -A4 required lighting on treads. Maintain lighting at ceiling as currently shown. Use painted steel handrails with Special Coatings Paint on them. RSA to provide detail of handrail design, Remove circuiting to currently specified lighted handrails Ph. III -A7 Eliminate water feature on south side of City Hall and water treatment equipment ($350,881) Ph, III -A9 Eliminate glass shards around City Hall skylight and supporting structure ($132,61)) Ph. 111-A10 Eliminate glass skylight at City Hall and supporting structure. Infill with standard roof structure and materials used on the remainder of the roof ($1 %1,030) Ph. III -A14 Eliminate overflow drains on both City Hall and Fire Station. Provide appropriately flashed scuppers through the exterior fascia instead ($85'301) Ph. III-Al5 Price current interior finishes provided on RSA finishes schedule vs. allowances in the specifications ($159,960) Eliminate bullet resistant glass at all service counters at Customer Service, Municipal Ph. III -A17 Court, Police Records and Development Services. Provide 3/8" thick tempered glass with standoffs in pattern currently indicated. Kevlar to remain at dais in Council ('''��0��) Chambers Ph, III A20 Eliminate blue etched glass in building lobby of City Hall. Replace with painted GWB, 12" cherry wood base and wood chairrail. Blue glass in Council Chambers to remain ($30,881) Change all VDB-3 glass dry erase marker boards to VDB-4 visual display vinyl wall Ph. III -A22 covering equal to Just Rite JR48-00 with scrim backing. Provide 20 ga. sheet metal substrate applied smoothly and flat to wall for use with magnets underneath the ($12,211) vinyl wall covering. Provide 4" cherry wood trim around vinyl white boards Change pendant mounted lighting in Police Briefing Room 166 to match other 2 x 4 Ph. III -A23 recessed indirect LED light fixtures used on the project providing 45 fc of lighting at ($1,032) the training table tops. Maintain recessed can lights as currently indicated Move all residential appliances to Owner furnished contractor installed (OFCI) Ph. III -A25 except Gas Oven/Range in Fire Station and Hood for Gas Oven/Range shall remain in 5) contractor's scope (CFCI) Ph. III -A26 Shell in Staff Restrooms 219 and 220. Provide MR type GWB walls and ceilings taped and bedded. Cap plumbing at walls and floors Eliminate millwork in IT repair 248. Repair stations, overhead storage and drawer Ph. III -A27 pedestals will be provided as part of FF&E. Maintain all electrical and data called for ($2, 366) in this area Ph. III -A28 Eliminate lockers in Executive Conference Room 110. Move to FF&E item (OFCI) ($5,544) Ph, III -A29 Eliminate acoustical block in Fire Station apparatus bays, Replace with standard CMU non -acoustical block and paint with block filler and paint specified ($13,141) Ph. III -A31 Move the cost of the Dry Sauna unit in Detox 154 of Fire Station to FF&E (OFCI) ($8,421) Ph. III-A33 Eliminate display cabinet in Fire Station Lobby 102. Maintain power for lighting in cabinet for future cabinet install ($6,731) Ph. III-A34 Eliminate the three flag poles on the project ($13,145) Ph. III-A36 Remove requirements for AESS steel. Grind welded joints down smooth and remove all slag from ex osed structural steel ($2,064) Ph. III-A37 Change mortise hardware at Fire Station to bored cylinder locksets with similar handles and rosettes as those specified ($5,676) Ph. III-A38 Move room signage to FF&E item (OFCI). All other signage such as building plaques and cast aluminum letters to remain in contractor's scope of work ($15,918) Ph. III-A39 Move 119613 Finger Print Dusting Station to FF&E item (OFCI) ($3,715) Ph. III-A41 Replace VWC in restrooms with painted GWB ($9,288) Ph. III-A44 Use EPDM roofing in lieu of mod bit roofing (60 mil reinf, white or gray?) ($132,935) Ph. III-A47 4 1/2" storefront in lieu of 6" curtainwall at FS V Roof ($15,170) Ph. III-A48 Omit fritted glass ($72,756) Ph. III-A49 Reduce construction contingency from $650K to $575K ($75,000) Ph. III-MEP1 Change copper to aluminum feeders where allowed by specifications ($8,772) Ph. III-MEP2 Change copper to aluminum busway and windings excluding generator fed panels ($6,708) Ph. III-MEP3 MC Cable based on the following conditions: 1) Only where completely concealed, 2) maximum of 75' allowed from home-run junction box to LAST device in the branch for receptacles, 3) NOT allowed as home-run to panels, 4) NOT allowed for mechanical, or equipment connections, 5) allowed above lay-in ceilings for final connection to light fixtures, max. length of 15' from hard-piped junction box to fixture, 6) allowed as final connection to other light fixtures, maximum of 6' ($33,540) Ph. III-MEP4 Capture savings of Oncor feed change (ME is waiting on markup from the City Owner Ph. III-MEPs Remove USB receptacles, replace with receptacles to match remainder of project ($1,342) Ph. III-MEP7 Remove future conduit for EV charging ($413) Ph. III-MEP8 Remove electrical charging receptacles from each police locker ($3,612) Ph. III-MEP9 Remove concrete encasement for Fire Station generator feed ($2,580) Ph, III-MEP10 Remove concrete encasement for City Hall generator feed ($2,580) Ph. III-MEP11 Consider an alternate light fixture package (5170,280) Ph. III-MEP14 Remove up-lighting in fire station Type V fixture ($3,096) Ph. III-MEP15 Reduce or remove slot diffusers change to 2 x 2 ($59,340) Ph, III-MEP17 Remove forced air exhaust system from Police lockers (keep drywall furrdowns) ($5,196) Ph. III-MEP18 Reduce sound isolation return air boots (affects acoustics) ($19,131) Ph. 111-MEP19 Revise lined duct to wrapped duct for supply (affects acoustics) ($16,903) Ph. III-MEP20 Remove lined insulation from return air duct (affects acoustics) ($10,392) Ph. III-MEP21 Consider an alternate plumbing fixture package ($16,522) Ph. 111-MEP23 Reduce number of floor drains in men's and women's public restrooms to one per restroom ($1,069) Ph. III - MEP 26 Use standard NHCI couplings for SW&V and storm piping above ground ($16,855) Ph. III - MEP 27 Reduce lighted handrails at front entry porch and ramp. Use stainless steel cable rail instead with no illuminiation ($172,600) Ph. III-Str.1 Utilize braced frames in lieu of moment connections to reduce moment frame beam sizes, reduce moment frame column sizes, eliminate 72 moment connections along with field inspection and testing requirements. Replace with 2 braced frames in east- west direction ($43,344) Ph, III-Str.8 Remove steel structure inside of apparatus bay steel channel surrounds, Some steel support will have to extend at headers from CMU bond beams to keep the headers from sagging, but otherwise the steel columns and structure inside the steel surrounds can be removed ($9,465) Ph. III-Str.9 lReduce misc. steel allowance to 10% in lieu of 20% ($144,480) Ph. III-Str.12 IDelete western most wood truss girder in Apparatus Bays ($8,587) oia; vawe tngmeenng tstimate Tor rn. m OT vt (-,2,542,961) Eliminate P2 and P3 vehicular pavers on concrete base at north south entry drive on Ph. III-LA1 south side of City Hall. Replace with broom finished concrete with sawcut control joints at 2' OCEW. Total reduction of pavers for LAI and LA2 is 2400 SF. See layout ($14,652) from Landscape Architect Eliminate P2 pedestrian pavers on concrete base immediately south of entrance to Ph. III-LA2 City Hall and at south plaza. Replace with broom finished concrete with sawcut ($1,728) control joints at 2' OCEW. See layout from Landscape Architect Eliminate rectangular P2 pedestrian paver area on concrete base northwest of City Ph. III-LA3 Hall Development Services. Replace with concrete to match adjacent material. See ($1,513) layout from Landscape Architect Change 50,000 SF of sodded area to hydromulch as shaded on L2.01 landscape VE Ph. III-LA4 suggestion drawing. Must be installed between April and early October to be ($17,544) acceptable change Ph. III -LAS IMove all site furniture to FF&E scope instead of CMAR scope of work ($42,75£3) Reduce the number of cables to each workstation to one (1). City can utilize Ph. III-COM1 computer port on the phone set for connecting the computer at each location in ($30,027) lieu of having separate phone and date outlets at each location Ph. III-SEC1 Remove the (7) interior cameras from the Fire Station. Data drops for those cameras would also be deleted ($5,790) Have all cameras recorded at a single location (City Hall) and remove (1) NVR from Ph. III-SEC2 the Fire Station. If the cameras are on the network, they can be recorded anywhere ($2,941) within the City of Anna network Ph. III-AV1 Reduce conference rooms to single wireless connectivity only (no control keypads in [Ph. conference rooms, remove HDMI extenders from tables, remove ceiling speakers. ($19,141) III-AV3 Reduce display sizes to the next size down ($23,317) Ph. III-CIV1 IMove east side headwall (eliminates 80' of 21" RCP) Ph. III-CIV2 I Eliminate sidewalks east of police parking lot ($6,130) oia; vawe tngmeenng tstimate Tor rn. m OT vt (-,2,542,961)