HomeMy WebLinkAboutRes 2020-04-703 Municipal Complex Change Order 1CITY OF ANNA, TEXAS RESOLUTION NO. 2020 -DJ -Z:3 A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING THE CITY MANAGER TO ACT ON THE CITY'S BEHALF IN EXECUTING AND APPROVING CHANGE ORDER NO. 1 TO THE CONTRACT WITH LEE LEWIS CONSTRUCTION FOR THE CITY HALL CONSTRUCTION PROJECT WHEREAS, on February 10, 2019, the City of Anna, Texas (the City), via its Res. No. 2019- 09-617, awarded a contract to Lee Lewis Construction, Inc., for the Early Sitework Construction Phase Services ("Phase 1") associated with the design and construction of the City's new municipal complex (the "Project"), and; WHEREAS, the costs of Phase 1 work were to be funded by municipal complex bond fund not to exceed a total amount of $1,911,193.00; and WHEREAS, during the course of construction City Staff has identified changes that need to be made to the Project (including concrete fill and foundation preparation work which was not anticipated in the original construction plans), and the cost of these changes (Change Order No. 1) will be $79,107.00 (seventy-four thousand, two hundred and thirty-three dollars and zero cents), and; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Approval of Change Order No. 1. The City Council hereby approves Change Order No. 1 to the contract with Lee Lewis Construction, Inc., attached hereto as Exhibit 1 as an amendment to the Guaranteed Maximum Price for Phase 1 (see, e.g., A133-2009, Exhibit A, at Article A.1). The City Council further authorizes, ratifies and approves the City Manager's execution of same. The City Manager is hereby authorized to execute all documents and to take all other actions necessary to finalize, act under, and enforce the Change Order. PASSED AND APPROVED by the City Council of the City of Anna, Texas, on this /V11I6 ay of 2031.0. APPROVED: /) Carrie Land, City Secretary \�°,�"� OF•A/yy to Pike, Mayor �yo 0 •.9 AIA Document G701TM - 2017 Change Order PROJECT: (Nante and addrecc) City of Anna Municipal Complex Northeast corner of 7th Street and Powell Parkway in Alma. TX OWNER: (hrrnte and addrt,cc) City of Amua I I I North Powell Parkway Anna, TX 75409-0776 CONTRACT INFORMATION: Contract For: General Construction Datc: February 10, 2019 ARCHITECT: (Ni�mc mud addr�ssJ Randall Scott Architects. Inc. 14755 Preston Road, Suite 730 Has, "I•X 75254 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: April 9, 2020 CONTRACTOR: Name and udrlrass) Lce Lewis Construction 17177 Preston Rd., Ste. 160 Dallas, TX 75248 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a deutiled description e f the change and, (/'applicable, attach or re%crence apecgic erhibits•. Also include agreed upon ac justments attributable to executed Construction Change Directil)es.) This Change Order is for Work required to address an unforeseen subsurface pit/vault condition that was diseoverd (luring the course of consturction, The corrective recommendations required to address the unforeseen subsurface pit/vault condition were provided by Alliance Geotechnical Group, the City of Anna's Geotechnical Consultant. The corrective Work includes placement of 600 cubic yards of concrete (flowable till). The original Contract Slmi was $ 1,911,193.00 The net change by previously authorized Change Orders $ 0600 The Contract Sum prior to this Change Order was $ 1,911 , 19100 The Contract Sum will be increased by this Change Order in the amount of $ 79,107.00 The new Contract Sunt including this Change Order will be $ 1.990.300.00 The Contract Time will be unchanged by Zero (0) days, The neje date orSuhstantial Completion will he NOTE: This Change Order does not include adjustments to the Contract Stun or Guaranteed Maxinnun Price, or' the Canhact Time, that have been authorized by Constnrctiat Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, F(andall Scott Archimcts, Inc, NATURE Daniel C. Brantner Sr. Vice President PRINTED NAME AND TITLE Lee Lewis Construction CONTRACTOR (Firm name) SIGNA PRINTED NAME AND TITLE _�J i vin �rec PRINTED NAME AND TITLE April 9, 2020 C}^ `l _ � t� ._ ,3()) p ATM DATE DATE AIA Document G701 TM — 2017. Copyrightp 1979, 1987, 2000 , 2001 and 2077 by Tha American Institute of Architects. All rights reserved, ':':' ,- , ..:� ..,.. t ., I;a 't;. ..i:, i.": II ':1i, r,i I Jiu I i._i�..l i.' .,11.E ..'i!i .; ... . r,i .t fi? h:', ❑i'... finLl,i ,.U.. i' ..-.i 1!'�. +IH - .i.'> i:.;/. TI11S .. ... document was produced by AIA software at 11:00:33 ET on 04/0912020 under Order o. 3533993363 which expires on 01/02/2o21, and is not for resale. User Notes: (3B9ADA44) AlA Document G701TM — 2017 Change Order PROJECT: (Nrune and address) CONTRACT INFORMATION: City of Anna Municipal Complex Contract For: General Construction Northeast corner of 7th Street and Powell Date: February 10, 2019 Parkway in Anna, TX OWNER: (Aaure and adrlresc) Cityol'Atnra 111 North Powell Parkway Anna, TX 75409-0776 ARCHITECT: (Name and arldrecs) Randall Scott Architects, Inc. 14755 Preston Road, Suite 730 Dallas, TX 75254 CHANGE ORDER INFORMATION; Change Order Number: 001 Date: April 9, 2020 CONTRACTOR: (Name wrrl adch•css) Lee Lewis Construction ] 7177 Preston Rd., Ste. 160 Dallas, TX 75248 THE CONTRACT IS CHANGED AS FOLLOWS: (insert a detailed description nfthe change and, if'alsyVicable, attach or reference specific exhibits. Also include agreed uprm ad( usbncmts attrihurable to execrrted Consh•uction Change Direeth7es.) This Change Order is for Work required to address an unforeseen subsurface pit/vault condition that was discoverd sharing the course of consturction, The corrective recommendations required to address the unforeseen subsurface pit/vault condition were provided by Alliance Geotechnical Group, the City of Anna's Geotechnical Consultant. The corrective Work includes placement of 600 cubic yards of concrete (flowable till). Tlic original Contract Stun �',as � 1,911,193.00 The net change by previously authorized Change Orders $ 0100 The Contract Sum prior to this Change Order was $ 011,193.00 The Contract Sum will be increased by this Change Order in the amount of $ 79,107600 The new Contract Sum including this Change Order will be $ 14990300400 The Contract Time will be unchanged by Zero (0) days. [lie new dale of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Conhact Time, that have been authorized by ConstntctiVal Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, Rnndnll Scott Architects, Inc, ITE )n nanr 7/ 1,e 04119 MATURE Daniel C. Brantner /}`' Lee Lewis Construction City of Ann. CONTRACTOR (Firer amus) OWN rt ruutte) Sr. V ice President � cn '�•2 ti! �� r� ir,r, Pl�� P PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE April 9, 2020 4-^41 ,-mlAam,� —1'4 s,, -- )ATE DATE DATE DATE AIA Document G701 T" — 2017. Copyright f� 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. Wr1h'i77eG. ;71:s :',I 5..':!i;:' 1 :.:i.i I •:i,l.. -1'�::I11%,,._:,:;,.il1-'iii,'"'•Ir. 1.',I!i:'!171:.:..li.I!I,I:,Il;il,!)-:„ i'.V,II.I.Iii.'illi';�I+�." nll�:l!(i)ent,Or . . L. ,.1„ ..1711,. t . r.iunl:.I (. I:i11,!, iI1 . •!,,;�..:1 !1 tl; f1;. rlr..[<iluw 1 ;.u,.lii � {7:; :111. -T . i:.;�.Thi9 document was produced by AIA software at 11:00:33 ET on 04!0912020 under Order No. 3533993363 which expires on 01/02/2021, and Is not for resale. User Notes: (3B9ADA44) w O H U cn L Q p •4mJ p -N _ � 70 .� L U M W Ul p OC > O Q 4=�0 X � p ca w cin C: � C: -a ommom Q � c (1) }, >, o .n v O ,,Q3 -a N I�d`^ o a) 4- wo 0 3 cca m a) •� ' �_ L � a a+ 0 ° O N � E 3 amiBREMEN c 3 o° 0 a� 0 -o -a to + Cl) c c c }; '3 d1 C n �� c c BONBON BUMMER 0 0 '1"') jD U C �° O N to .0 E Nu OU +5+ O ow"opC a; M v L 4o of BO Np N rB0 c 'p ANNED BONBON 4,,J +,,PBBO +' ' V) ajU 41 > BBO L Q C 4J 3 C Q rm, O p tI1 U > v N O U u1 ca map O p �O O O p v Bloom) N O 4— O u- C a O u C) C aJ Nca V) Q. �O �' 0 0 Q L io L (0Q _O �U L fB ON N C O.O OU � AE L N (O C C) f6 c ML N No N Q Q)ammomm almool c O a� OLu M tN o E � �� o.w arc, Jo U N L U >' U N Nv O �� O� m 4-d N3 ..O C:N 4— c _J Ci U Qi 3 N N M O MAMMON C a) C MONOMER C U� U pSOMEONE BONBON '++ Q) mc o) =3+,,; (� M 0 -p a,N � 4=J4J C ul mc MIMEMP-a of 4— MO ° r -I U L L -p U N 0BBO a ' cu (0 N =0 C 0 —p 4,,J . L 'p Q • N ON C: N cLu QJ 0 E � +�-+ +, (a (O 4� N C (0 M .�' cB O t ccs �' N �c N c0 c U Y 4mJ L O,O N m.� to L O �. N 4 •c p U O aJ � 3 m a +B' "Bill ,G Vi N L V L '� 4T- J� v � Q LLA u >% Q ii v O� cn U H 3 m p �� vi Q p O EMEMMIN� ■ ■ ■ ■ a) ■ > ■ ■ ■ ■ sommomm ai O cn u- Ln w; ''3<. S4 to if u • Or N �� I f.re I op for 1 44,1 f,, v c v E 'E :G p O Q) � N — Q. Q)v U' L U ca E Ln o � O +v c6 O 4A *=' > c o �o c L Ln v c L tw •� Q) � L Q)N 4=J - Ln Mimi Q N a--+ L a' C cn U QJ c (B �►— �' -c4=JO }, ca > U Q ate- J c J } s- M +J }' c O 4. � c6 O v 4 co ; Q� N v v �m>� Z5 .� O v av—+ q E �► o u o v C Q Q O ° am -� U cn cz U a� O N ,_, v =_ �o EL a u w NONE NONE �NONE N i -J L O O `~- Ca � 4A (1) C MONO mail mail 0 N � aA C � O U L 10along O C Mao � N 4.1 Q �--' Q O U C6 U N U O 1 L Game n r1 W mommo 0) N monc 4mad mining laws 0 � � v O m OMONO U _Mal Q O LO Ln �o Ln 04mJ Q•:3 on o� Q L miso C6 M w I— N r -i ■ _> � .� •U fB o Mao U ONOMMOM L manic C L O m O U cn-� `n N E to• — O > �Manic Q +' O � O � N 70 O O Ca O LL cn N O Mao O •� E I� E�', 0 O mollo.0 4mJ 4J .a M .`� UO O p� tom- •1--J OU Sammis N D+, O t�A :3 i OLO awlsommil • — cn Ln cMa Ln O N O 4mommis MONO U 4J O cn o� QMC� E v o O p Ln U cn, N C o Q)� � ° E mail O u � .0 1) U tO p �— �O V7 m cn w O H V c� O EME4 ca .� a -J U O j CIN Ln m O QMao U X �4mmJ U U v vcaaaa� QL L Q O O `= U mommomi swo V) >..J a 4— _' O U v J O � O O N V 4.j M M O , 4mJ O O �2 O A� �U Mac L +mJ v m"o o .N p Salomon v o u � C v .+—' (� O �.., aa�c L cn ca U a ■ Flowable Fill for Pit Anna Municipal Complex Estimate Summary General Conditions 0 - - Permlt 1 0 1 1- 0 1 745233.00 Plowable Fill 74,233 1 0.91 S BTOTAL 74,233 74,233 0.91 Builder's Risk Insurance 158 0.00 General LiabilityInsurance 0.720% 534 0.01 Umbrella Liabilit Insurance 0.450% 334 0.00 on urgency o Subtotal 75,259 0.92 AGC Fee 77 0.02 Fee 2.200% 1,656 Do .:. 0,94 Payment and Performance Bond 2,115 F= Total 79,107 Lee Lewis Construction Page 1 of 1 $IZELOVE I gN$TR� r,"rIQl a c =c &-�.*=e :stn's: r .. wn 2247 —Anna Municipal Complex John Glowers Lee Lewis Return To Jason Lowrey Sizelove Construction 2148786310 2148786310 Jason@sizeloveconstruction.com Number: Revision Number: Date: Work Type: Days Valid: Plowable Fill Subject: Plowable FIII 2247-1 0 3/20/2020 Price / Proceed 30 Scope Of Work /Time Extension Request Please see the attached for the cost associated with providing flowable fill at the pit / vault. The add / deduct cost is $132.50 per cubic yard. Summary Total: $74,233.00 Reservation of Rights This pricing does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for any of these items. Jason Lowry Project Manager Dated: 3/20/2020 M M 0 0 y O O M r O (� 00 r � V M C C rn O 3 Cd O m aE Q 0 0 (5-6 N O C V dM. O L co) E {� 1+ O Q C N 7 0 a, W a co 2 O 'V O W 0- N O ,Q 3 Cl*, c Q d co m O. O .Q U) M p t4 C m o Q i C) �aoi oi r O O C c o cu E J Q U t Q! O O O N a. a N N L 00 d = O O O O CO r r O d0' F7 d W FMW C O G LM (••) H O E u W y (� CL E in Z m 0 S DLL Z m J d C C > mLL U U LL 0 0 y O O O O (� O O � V