HomeMy WebLinkAboutPZ Res 2024-10-0087 Shops at Foster Crossing, Block A, Lots 1-5, Preliminary Site PlanRETAIL
(17,045 S.F.)
F.F.E.= 704.00'
10
10108
7
6 8710
76
10
67
10104
9
98
25' B.S.
RETAIL
(19,000 S.F.)
F.F.E.= 705.00'RETAIL
(11,975 S.F.)
F.F.E.= 706.00'
OFFICE-3
(5,495 S.F.)
F.F.E.=706.00'
OFFICE-5
(6,414 S.F.)
F.F.E.= 705.00'
25' B.S.20' L.S.25' B.S25' B.S
10' B.S10' B.S
5' B.S5' B.SLOT 1, BLOCK A
67,596.90 S.F.
1.552 ACRES
LOT 2, BLOCK A
161,830.93 S.F.
3.72 ACRES
LOT 3, BLOCK A
74,079.57 S.F.
1.70 ACRESLOT 4, BLOCK A
68,344.67 S.F.
1.57 ACRES
LOT 5, BLOCK A
54,820.17 S.F.
1.26 ACRES
PROP. 30'
DRIVEWAY
273.5' TO NEXT DRIVEWAY
PROP 30'
DRIVEWAY 334.67' TO VAIL LANE PROP 30'DRIVEWAY178.65' TO NEXT DRIVEWAY232.1' TO E FOSTER CROSSING ROADPROP DUMPSTER ENCLOSURE
WITH 6' TALL MASONRY SCREENING
WALL AND METAL GATES
(TYP.)
PROP 6' TALL MASONRY
SCREENING WALL
SS
SS
///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX VAIL LANEEAST FOSTER CROSSING ROAD SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>
SAN>
SAN>
SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>SAN>W
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W
W
W
W
15' WATER LINE ESMT
VOLUME 1057, PAGE 11
D.R.C.C.T.
20' PERMANENT WATER LINE ESMT
INST. NO. 20160607000708690
O.P.R.C.C.T.
10' UTILITY ESMT
10' UTILITY ESMT
10' UTILITY ESMT
DALLAS AREA RAPID TRANSIT (DART)VOLUME 5443, PAGE 5532, D.R.C.C.T.HOUSTON & TEXAS CENTRAL RAILWAY COMPANY125' ROWVOLUME V, PAGE 603, D.R.C.C.T.REMAINDER OF 40 PGE, LTD.
VOLUME 5387, PAGE 468
O.P.R.C.C.T.
BLOCK C
ANNA CROSSING, PHASE 1C
LOT 1 LOT 2
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////
///
///
///
///
///
/
/
///////////////////////////////////////////////
/
/////////////////////////////////////PENN STREET
SA
N
>
SA
N
>
SA
N
>
SA
N
>
SAN>SAN>SAN>SS50' LONE STAR GAS ESMTVOLUME 280, PAGE 244D.R.C.C.T.//////////////////////////////////////////318.66'
20' L.S.10' L.S10' L.S
10
9 4
R30'R30'R30'R30'
R3
0
'
R30'
R3
0
'
R5
'
OFFICE-7
(4,737 S.F.)
F.F.E.= 705.00'
OFFICE-8
(4,571 S.F.)
F.F.E.= 705.00'
OFFICE-6
(7,462 S.F.)
F.F.E.= 705.00'
OFFICE-4
(4,323 S.F.)
F.F.E.=706.00'
OFFICE-1
(4,240 S.F.)
F.F.E. =706.00'
OFFICE-2
(4,240 S.F.)
F.F.E.=706.00'
9
4
9
10
96
7
108910
3
107910
10
8
5
108
99
30'F.A.U.D.E.20'20'30'F.A.U.D.E.20'20'30'F.A.U.D.E.20'20'20'
30'
F.A.U.D.E.
20'9'9'9'
9'9'9'9'9'9'9'9'9'9'9'9'9'9'9'
9'
30'
F.A.U.D.E.
9'30'F.A.U.D.E.30'F.A.U.D.E.30'F.A.U.D.E.30'F.A.U.D.E.30'F.A.U.D.E.30'F.A.U.D.E.30'F.A.U.D.E.9'9'
9'9'9'
9'
9'
30'
F.A.U.D.E.
40'
14'26'40'
14'26'
150'
1
1
.
7
1
'6'40'2
6
'
2
6
'40'2
6
'40'26'14'9'20'20'9'20'9'20'9'20'9'20'20'9'20'9'20'20'20'9'9'20'9'20'20'20'9'20'20'9'20'9'20'20'20'20'9'9'20'9'20'20'20'20'9'9'
20'9'9'20'9'9'20'10'6'6'5'6'6'
5'6'5.50'6.01'80'80'53'10'
72.27'53'90.87'10'94.38'53'112.99'
80'53'126.03'55'145.32'
122.53'57'102.54'
83.12'57'55'83.12'PROP. 30'DRIVEWAY10'
9
213.49'80'71.72'6'6'20'9'5'
9'
653'2
246.66' TO NEXT DRIVEWAY
PROP. 30'
DRIVEWAY
25' B.S.5' B.S5' B.S5' B.S5' B.S10' L.S
5' B.S5' B.S.5' B.S.
5' B.S.5' B.S5' B.S5' B.S5' B.S.
25' B.S.
5' B.S.
10
9
9'20'
9'20'9'20'20'L1L2L3 L4
L5
C1C2C3
L6L7L8L9L10L11
L12
L13L14L15
L16L17 L18L19
R30'
6'
10'
6'6'6'
EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT
R.R.
R.R.
R.R.
R.R.
PROPOSED D.D.EPROPOSED D.D.EPROPOSED D.D.E
PROPOSED D.D.E
PROPOSED
D.D.E
9'9'9'9'14'14'14'40'106'R30'R30'166.78' TO PENN STREET9'20'9'20'30.1'9'20'9'
4
20'9'9'
20'
9'
9'9'
OFFICE-9
(15,665 S.F.)
F.F.E.= 704.00'
9'9'
154.15'60'60'167'EXISTING LEGEND
BUILDING LINE
EASEMENT
BOUNDARY
CONCRETE
BRICK
STONE
WOOD DECK
GRAVEL
HIGHBANK LINE
PARKING STRIPE
BUILDING WALL
TILE
FIRE LANE STRIPE
PIPE RAIL FENCE
NO PARKING
HANDICAP SPACE
TELE. BOX
CABLE BOX
1/2" IR FOUND
1/2" IR SET
WATER METER
GAS METER
OHU OVERHEAD UTILITY LINE
BARBED WIRE FENCE
IRON FENCE
CHAINLINK FENCE
WOOD FENCE
X
A.C. PAD
UTILITY POLE
5/8" IR FOUND
ASPHALT
TRANS. BOX
60-D NAIL FOUND
ELECTRIC BOX
3/8" IR FOUND
SAN. SEW. CO.
PK NAIL SET
RETAINING WALL
STORM DRAIN MH.
SAN. SEW. MH.
IRRIGATION VALVE
WATER VALVE
FIRE HYDRANT
BRICK COLUMN
STONE COLUMN GUY WIRE ANCHOR
1/2" IP FOUND
BOLLARD POST
LIGHT POLE
COVERED AREA
GAS MARKER
1" IR FOUND
1" IP FOUND
POINT FOR CORNER
3/4" IP FOUND
CONC. MONUMENT
X-FOUND
X-SET
SITE LEGEND
CONCRETE CURB
SAW-CUT LINE
MONUMENT/PYLON SIGN
WHEEL STOPS
HANDICAP SIGN
HANDICAP LOGO
STRIPING
BOLLARD
FENCE
FIRE HYDRANT
RAMP
FIRE LANE
PARKING SPACES
DOUBLE DUMPSTER ENCLOSURE
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
SANITARY SEWER DOUBLE CLEANOUT
DOMESTIC WATER METER
IRRIGATION METER
GAS METER
TRANSFORMER
LIGHT POLE
X
RISER ROOM R.R.
LANDSCAPE AREA
SITE
VICINITY MAP
NOT TO SCALE
N
SITE GENERAL NOTES
1.ALL CONSTRUCTION SHALL BE IN STRICT
ACCORDANCE WITH THE CITY OR LOCAL
JURISDICTION STANDARDS.
2.THE LOCATION OF UNDERGROUND UTILITIES
INDICATED ON THE PLANS IS TAKEN FROM
AS-BUILTS, UTILITY PLANS OR SURVEY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO MAKE
ARRANGEMENTS WITH THE OWNERS OF SUCH
UNDERGROUND UTILITIES PRIOR TO WORKING IN
THE AREA TO CONFIRM THEIR EXACT LOCATION
AND TO DETERMINE WHETHER ANY ADDITIONAL
UTILITIES OTHER THAN THOSE SHOWN ON THE
PLANS MAY BE PRESENT. THE CONTRACTOR
SHALL PRESERVE AND PROTECT ALL
UNDERGROUND UTILITIES. IF EXISTING
UNDERGROUND UTILITIES ARE DAMAGED, THE
CONTRACTOR WILL BE RESPONSIBLE FOR THE
COST OF REPAIRING THE UTILITY.
3.WHERE EXISTING UTILITIES OR SERVICE LINES
ARE CUT, BROKEN OR DAMAGED, THE
CONTRACTOR SHALL REPLACE OR REPAIR THE
UTILITIES OR SERVICE LINES WITH THE SAME
TYPE OF ORIGINAL MATERIAL AND
CONSTRUCTION, OR BETTER, UNLESS
OTHERWISE SHOWN OR NOTED ON THE PLANS,
AT HIS OWN COST AND EXPENSE. THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
ENGINEER AT ONCE OF ANY CONFLICTS WITH
UTILITIES.
4.ALL EXCAVATIONS, TRENCHING AND SHORING
OPERATIONS SHALL COMPLY WITH THE
REQUIREMENTS OF THE U. S. DEPARTMENT OF
LABOR, OSHA, CONSTRUCTION SAFETY AND
HEALTH REGULATIONS AND ANY AMENDMENTS
THERETO.
5.THE CONTRACTOR SHALL RESTORE ALL AREAS
DISTURBED BY CONSTRUCTION TO ORIGINAL
CONDITION OR BETTER. RESTORED AREAS
INCLUDE, BUT ARE NOT LIMITED TO TRENCH
BACKFILL, SIDE SLOPES, FENCES, DRAINAGE
DITCHES, DRIVEWAYS, PRIVATE YARDS AND
ROADWAYS.
6.ANY CHANGES NEEDED AFTER CONSTRUCTION
PLANS HAVE BEEN RELEASED, SHALL BE
APPROVED BY THE CITY ENGINEER. THESE
CHANGES MUST BE RECEIVED IN WRITING.
7.THE CONTRACTOR SHALL PROVIDE "RED LINED"
MARKED PRINTS TO THE ENGINEER PRIOR TO
FINAL INSPECTION INDICATING ALL
CONSTRUCTION WHICH DEVIATED FROM THE
PLANS OR WAS CONSTRUCTED IN ADDITION TO
THAT INDICATED ON THE PLANS.
8.ALL CURB RADIUS TO BE 10' OR 2' UNLESS
OTHERWISE NOTED ON THE SITE PLAN.
EASEMENT/SETBACK LEGEND
BUILDING SETBACK
DRAINAGE & DETENTION EASEMENT
SANITARY SEWER EASEMENT
SIDEWALK EASEMENT
UTILITY EASEMENT
FIRE LANE, ACCESS & UTILITY EASEMENT
WATER EASEMENT
ELECTRICAL EASEMENT
ACCESS EASEMENT
LANDSCAPE SETBACK
B.S.
L.S.
F.A.U.E.
A.E.
S.E.
W.E.
S.S.E.
E.E.
U.E.
D.D.E.
FIRE LANE, ACCESS & DRAINAGE EASEMENT F.A.D.E.
FIRE LANE, ACCESS, UTILITY & DRAINAGE EASEMENT F.A.U.D.E.
Know what's below.
Call before you dig.TX. P.E. FIRM #11525
T: 469.331.8566 F: 469.213.7145 E: info@triangle-engr.com
W: triangle-engr.com O: 1782 W. McDermott Drive, Allen, TX 75013
Planning Civil Engineering Construction Management
SHOPS AT FOSTER CROSSING
9.795 ACRES
G STARK SURVEY, ABS. A0798 TRACT 150
09/23/24
97534
KARTAVYA S. PATELSTATE O F T
E
X
A
SPROFE
S
SIONA L E N G INEERL
ICE N S E D
CITY OF ANNA, COLLIN COUNTY, TEXAS 75409
PREPARATION DATE: FEBRUARY 28, 2024
'PSP 24-0006'
BLOCK A, LOTS 1 - 5
Scale: 1" = 'Feet
0
60
120
C-3.0
PRELIMINARY SITE PLAN
APPROVAL BLOCK
PROJECT CONTACT LIST
ENGINEER
TRIANGLE ENGINEERING LLC
1782 W. McDERMOTT DRIVE
ALLEN, TEXAS 75013
CONTACT: KARTAVYA PATEL, P.E.
PHONE: 469-331-8566
OWNER/DEVELOPER
AKHANDA REALTY & PROPERTIES
5 COWBOYS WAY, STE 300
FRISCO, TEXAS 75034
CONTACT: SURESH MALEPATI
PHONE: 469-620-7712
SURVEYOR
TRAVERSE LAND SURVEYING
14200 MIDWAY ROAD, SUITE 130
DALLAS, TEXAS 75244
CONTACT: DAVID F. McCULLAH, RPLS
PHONE: 469-784-9321
ARCHITECT
TBD
TOTAL PARKING PROVIDED:
PROPOSED USE:
ZONING:
SITE ACREAGE:
BUILDING AREA:
HANDICAP PARKING PROVIDED:
IMPERVIOUS AREA:
BUILDING HEIGHT:
PERVIOUS/LANDSCAPE AREA:
REGULAR PARKING REQUIRED:
SITE DATA SUMMARY TABLE (LOT-1, BLOCK A)
NUMBER OF STORIES:
HANDICAP PARKING REQUIRED:
REGULAR PARKING PROVIDED:
BUILDING COVERAGE:
FLOOR AREA RATIO:
1.552 ACRES (67,596.90 S.F.)
C-2 (PD-787-2018)
OFFICE
15,665 S.F.
1
TBD
23%
0.23
3 PER 1000 GFA
47 SPACES
45 SPACES
2 SPACES (1 VAN ACCESSIBLE)
2 SPACES (1 VAN ACCESSIBLE)
47 SPACES
41,662 S.F. (61.63%)
25,935 S.F. (38.37%)
TOTAL PARKING PROVIDED:
PROPOSED USE:
ZONING:
SITE ACREAGE:
BUILDING AREA:
HANDICAP PARKING PROVIDED:
IMPERVIOUS AREA:
BUILDING HEIGHT:
PERVIOUS/LANDSCAPE AREA:
REGULAR PARKING REQUIRED:
SITE DATA SUMMARY TABLE (LOT-4, BLOCK A)
NUMBER OF STORIES:
HANDICAP PARKING REQUIRED:
REGULAR PARKING PROVIDED:
BUILDING COVERAGE:
FLOOR AREA RATIO:
1.57 ACRES (68,344.67 S.F.)
C-2 (PD-787-2018)
RETAIL
19,000 S.F.
1
TBD
14.69%
0.15
4 PER 1000 GFA
76 SPACES
74 SPACES
4 SPACES (1 VAN ACCESSIBLE)
4 SPACES (1 VAN ACCESSIBLE)
78 SPACES
57,764 S.F. (84.39%)
10,671 S.F. (15.61%)
TOTAL PARKING PROVIDED:
PROPOSED USE:
ZONING:
SITE ACREAGE:
BUILDING AREA:
HANDICAP PARKING PROVIDED:
IMPERVIOUS AREA:
BUILDING HEIGHT:
PERVIOUS/LANDSCAPE AREA:
REGULAR PARKING REQUIRED:
SITE DATA SUMMARY TABLE (LOT-2, BLOCK A)
NUMBER OF STORIES:
HANDICAP PARKING REQUIRED:
REGULAR PARKING PROVIDED:
BUILDING COVERAGE:
FLOOR AREA RATIO:
3.72 ACRES (161,830.93 S.F.)
C-2 (PD-787-2018)
OFFICE
41,482 S.F.
1
TBD
25.63%
0.25
3 PER 1000 GFA
126 SPACES
121 SPACES
6 SPACES (1 VAN ACCESSIBLE)
12 SPACES (8 VAN ACCESSIBLE)
133 SPACES
126,248 S.F. (78.01%)
35,583 S.F. (21.99%)
TOTAL PARKING PROVIDED:
PROPOSED USE:
ZONING:
SITE ACREAGE:
BUILDING AREA:
HANDICAP PARKING PROVIDED:
IMPERVIOUS AREA:
BUILDING HEIGHT:
PERVIOUS/LANDSCAPE AREA:
REGULAR PARKING REQUIRED:
SITE DATA SUMMARY TABLE (LOT-5, BLOCK A)
NUMBER OF STORIES:
HANDICAP PARKING REQUIRED:
REGULAR PARKING PROVIDED:
BUILDING COVERAGE:
FLOOR AREA RATIO:
1.26 ACRES (54,820.17 S.F.)
C-2 (PD-787-2018)
RETAIL
11,975 S.F.
1
TBD
21.84%
0.21
4 PER 1000 GFA
48 SPACES
55 SPACES
3 SPACES (1 VAN ACCESSIBLE)
3 SPACES (1 VAN ACCESSIBLE)
58 SPACES
42,888 S.F. (78.23%)
11,932 S.F. (21.77%)
TOTAL PARKING PROVIDED:
PROPOSED USE:
ZONING:
SITE ACREAGE:
BUILDING AREA:
HANDICAP PARKING PROVIDED:
IMPERVIOUS AREA:
BUILDING HEIGHT:
PERVIOUS/LANDSCAPE AREA:
REGULAR PARKING REQUIRED:
SITE DATA SUMMARY TABLE (LOT-3, BLOCK A)
NUMBER OF STORIES:
HANDICAP PARKING REQUIRED:
REGULAR PARKING PROVIDED:
BUILDING COVERAGE:
FLOOR AREA RATIO:
1.70 ACRES (74,079.57 S.F.)
C-2 (PD-787-2018)
RETAIL
17,045 S.F.
1
TBD
23.00%
0.23
4 PER 1000 GFA
69 SPACES
93 SPACES
4 SPACES (2 VAN ACCESSIBLE)
5 SPACES (5 VAN ACCESSIBLE)
98 SPACES
62,237 S.F. (84.01%)
11,843 S.F. (15.99%)
EXHIBIT A
APPROVED
October 7, 2024
P&Z COMMISSION
CITY OF ANNA