Loading...
HomeMy WebLinkAboutRes 2024-12-1711 Project Specific Purchase Order for Wastewater System Master Plan UpdateCITY OF ANNA, TEXAS RESOLUTION NO.o�Ll - A RESOLUTION OF THE CITY OF ANNA, TEXAS AUTHORIZING THE CITY MANAGER TO EXECUTE A PROJECT SPECIFIC PURCHASE ORDER WITH KIMLEY-HORN AND ASSOCIATES, INCORPORATED, FOR PROFESSIONAL SERVICES PERTAINING TO AN UPDATE TO THE WASTEWATER SYSTEM MASTER PLAN, WITH AN EFFECTIVE DATE. WHEREAS. the City of Anna is experiencing record growth, including residential and commercial development. and:. WHEREAS, maintaining an updated Wastewater Master Plan is critical to ensure the continued ability of the City of Anna to meet the sanitary sewer needs of the community, and: WHEREAS, the City has multiple, large, master planned developments moving forward into design and construction, which will result in significant expansion of the public sewer system in the City of Anna, Texas, and: WHEREAS. the City Council finds that it is necessary to proactively prepare for the growing infrastructure needs of the community. and: WHEREAS, Kirnley-Horn and Associates. Incorporated.. has been pre -selected in the Utility Facility Engineering and Utility Collection & Distribution categories of the City of Anna Professional Services RFQ conducted in 2021. and; WHEREAS. Kimley-Horn and Associates prepared the Wastewater Master Plan in 2020. and is well positioned to efficiently work with City staff to update the plan, and; WHEREAS. the City has negotiated a scope of services and fee to provide the necessary professional engineering services required to update the Wastewater Master Plan for the City of Anna. Texas, and: NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated The recitals above are incorporated herein as if set forth in full for all purposes, Section 2. Authorization of Project Specific Purchase Order and Funding. The City Council of the City of Anna, Texas, authorizes the City Manager to execute the attached Project Specific Purchase Order. The City Council of the City of Anna, Texas, finds that funding for the Purchase Order shall come from Sewer Impact Fee Funds. PASSED AND APPROVED by the City Council of the City of Anna, Texas on this day of December 2024. ATTEST: City Secretary, Carrie Land Lq Wfiria TEXAS * � 19 1 - APPROVED: Mayor, Pete Cain Exhibit A (following Page) INDIVIDUAL PROJECT ORDER NUMBER 064512923 Describing a specific agreement between Kimley-Horn and Associates. Inc. (the Consultant). and the City of Anna (the Client) in accordance with the terms of the fblaster Agreement for Continuing Professional Services dated July 27"- 2021. which is incorporated herein by reference. Identification of Project: Project Name: Wastewater Master Plan Update KH Project Manager: David Perkins, P.E. Project Number: 064512923 Specific scope of basic Services: Project Understanding: This project consists of updating the existing wastewater master plan completed in 2022 Task 1 — Wastewater Master Plan Update Kick -Off Meeting: The Consultant will meet with the City for a formal kick-off meeting for the wastewater master plan. During this meeting, data collection. the scope for each task. and City contacts will be discussed. Data Collection: The Consultant will coordinate .with the City to obtain the following data: Wastewater Specific Data Collection Physical Data ■ Lift Stations: total capacity, number of pumps, flow and head range. pump curves, pump impeller elevation ■ Wastewater treatment plant average day and maximum day capacity • Wastewater discharge records — Previous five (5) years Current and historical population (annually) Current and historical number and type of water connections ("monthly) Wastewater treatment plant discharge (daily') Lift station discharge (daily) Specific commercial industrial meters (daily) System Operational Parameters and Controls Lift station pump control settings • Historical maintenance data Sanitary Sewer Overflow (SSO) History Maintenance problem areas Analvsis: This task shall consist of compiling existing infrastructure information and demographics to update the existing hydraulic sewer model for the Client. The model will be updated using industry standard sewer modeling software such as ' SewerCAD" by Bentley. The model will consist of 10-inch and largerwastewater lines. Consultant will use this model with the developed design criteria to identify infrastructure improvements required to alleviate existing deficiencies and to serve future growth. The scope is anticipated to be as follows: rev 2021 Existing System Analysis • Land Use Assumptions — Consultant will incorporate land use assumptions from the current Comprehensive Plan Update. • Design Criteria — Consultant will develop design criteria that meets Texas Commission on Environmental Quality (TCEQ) regulations and industry design standards for: Sewer line capacity Lift station and force main capacity • Existing Wastewater Demands — Consultant will utilize the City's existing wastewater discharge data and field data to calculate the Clients existing and historical wastewater discharges. Tasks will include: Calculate historical and current average day, dry weather wastewater discharges for the City and for the 10 wastewater basins. Calculate historical and current average day, dry weather wastewater discharges by each unique land use type. Calculate a representative diurnal wastewater demand curve for the City and for each wastewater basin. _ Calculate wet weather wastewater discharges for the City and for each wastewater basin for each unique rainfall event. • Wastewater System Model — Consultant will update the City's wastewater system model to represent the existing wastewater system and existing wastewater system demands. The model will utilize existing infrastructure information, system operational parameters, and available customer demand information. Tasks will include: Evaluate system connectivity. Confirm pipe and node parameters, such as pipe size, roughness factor, and node elevation. Confirm system components, such as lift stations, are shown in the model with the correct location, connectivity, and geometry. Confirm system operational parameters and controls. _ Evaluate the distribution of existing demands. • Model and Infrastructure Verification Consultant will calibrate the model using flow monitoring data provided by the Client. Consultant will coordinate with Client staff to verify that the existing infrastructure matches the wastewater system model. Perform a calibration analysis to compare model results with the recorded data. Capital Improvement Plan Wastewater System Analysis and Infrastructure Sizing — Consultant will utilize the wastewater system model to determine existing infrastructure that does not meet the design criteria and to size infrastructure to serve future growth. Tasks will include: Determine sewer shed boundaries for the service area and establish a 1071' major wastewater basin. Identify infrastructure needed to alleviate existing system deficiencies. Utilize future land use projections to prepare projected demand distributions and incorporate into the model. Execute the model to identify infrastructure improvements necessary to meet future demands. Develop flow rate or connection number triggers for each major wastewater projects with a projected improvement year. The following components will be evaluated and sized: ■ Transmission Lines • Lift Stations • Treatment Facilities Capital Improvement Plan — Consultant will develop a wastewater Capital Improvement Plan rev 1 02'. that identifies projects to be constructed. Tasks will Include: Develop capital improvements project list. _ Develop opinions of probable construction cost for each project. CIP Meeting The Consultant will meet with the City to discuss the proposed CIP and preliminary cost projections. Any comments will be incorporated into the final CIP and cost projections. Report: Consultant will update the Wastewater Master Plan report summarizing the findings of the analysis and the recommendations. • Prepare draft report for review and comment by Client. • Prepare final report based on Client comments. • The report is anticipated to include the following: Executive summary Introduction Description of existing infrastructure Design criteria and modeling methodology Existing wastewater system deficiencies _ Future land use and wastewater demand projections Analysis and recommendations Capital improvements plan ■ Opinion of probable construction cost • Project description Maps • Existing land use map ■ Ultimate land use map ■ Existing system infrastructure map ■ Capital Improvement Plan map Additional Services if required: Any services not specifically provided for in the above scope will be billed as additional services and performed at Kimley-Horn's then current hourly rate. Additional services Kimley-Horn can provide include, but are not limited to the following: - Flow monitoring - Rainfall monitoring - Survey services - Geotechnical engineering services - Preparing applications and supporting documents for government grants, loans, or planning advances, and providing data for detailed applications. - Any services no listed in the Scope of Services Schedule: The consultant will provide the services listed in the Scope of Services upon receipt of signed IPO within a length of time as mutually agreed to by both the client and consultant. Terms of Compensation: Kimley-Horn will perform the Scope of Service for the lump sum fee below: rev 1 2021 Task 1: Wastewater Master Plan Update $90.000 Lump sum fees will be invoiced monthly based upon the overall percentage of services performed. ACCEPTED: CITY OF ANNA BY: �% TITLE: ` � ""f d" � "��• /..c..� DATE: rev 1 2021 KIMLEY-HORN AND ASSOCIATES, INC. BY: TITLE: Senior Vice President DATE: 12109/2024