Loading...
HomeMy WebLinkAboutRes 2025-01-1723 Purchase Order for Industrial Utility StudyCITY OF ANNA, TEXAS RESOLUTION NO. 2 0a5- c l - 11.13 A RESOLUTION OF THE CITY OF ANNA, TEXAS AUTHORIZING THE CITY MANAGER TO EXECUTE A PROJECT SPECIFIC PURCHASE ORDER WITH KIMLEY-HORN AND ASSOCIATES, INCORPORATED, FOR PROFESSIONAL SERVICES PERTAINING TO AN INDUSTRIAL UTILITY STUDY, WITH AN EFFECTIVE DATE. WHEREAS, the City of Anna is experiencing record growth, including residential and commercial development, and; WHEREAS, industrial development may provide the City with opportunities to diversify the tax base and provide employment opportunities for Anna neighbors, and; WHEREAS, industrial development often includes special requirements for water and wastewater utilities, and; WHEREAS, the City Council finds that it is necessary to proactively prepare for the infrastructure needs of potential industrial development, and; WHEREAS, Kimley-Horn and Associates, Incorporated, has been pre -selected in the Utility Facility Engineering and Utility Collection & Distribution categories of the City of Anna Professional Services RFQ conducted in 2021, and; WHEREAS, Kimley-Horn and Associates has a history of providing the City with successful professional engineering services regarding the analysis, planning, and design of public water and sewer infrastructure, and; WHEREAS, the City has negotiated a scope of services and fee to provide the necessary professional engineering services required to study the implications of future industrial development in Anna, Texas, and; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Authorization of Project Specific Purchase Order and Funding. The City Council of the City of Anna, Texas, authorizes the City Manager to execute the attached Project Specific Purchase Order. The City Council of the City of Anna, Texas, finds that funding for the Purchase Order shall come from the Contract Services line item in the Fiscal Year 2024-2025 Public Works Department, Sewer Division operating budget. PASSED AND APPROVED by the City Council of the City of Anna, Texas on this day of Becember-2024.* U aoaS ATTEST: *,APPROVED: TH& CITY OF City Secretary, Carrie Land * ayor, Pete Cain Exhibit A (following Page) INDIVIDUAL PROJECT ORDER NUMBER 064512921 Describing a specific agreement between Kimley-Horn and Associates, Inc. (the Consultant), and the City of Anna (the Client) in accordance with the terms of the Master Agreement for Continuing Professional Services dated July 27th, 2021, which is incorporated herein by reference. Identification of Project: Project Name: Hurricane Creek Industrial User Utility Study KH Project Manager: David Perkins, P.E. Project Number: 064512921 Specific Scope of Basic Services: Project Understanding: The City of Anna has requested Kimey-Horn to evaluate the water and wastewater demand on the existing City of Anna system with the addition of a data center or large industrial site (Industrial User or User) generally located north of the Hurricane Creek Regional Water Reclamation Facility (HCRWRF). The assumed water demand for this User is shown below: - Phase 1 - 1.2 MGD - Phase 2 - 3.5 MGD - Phase 3 - 7 MGD Wastewater demand design criteria will be evaluated with staff as a part of this study. This study will summarize the infrastructure improvements needed to the water system such as supply, pumping, storage, and transmission lines as well as the wastewater system such as treatment capacity and interceptor sizing associated with this User. This study will also evaluate the feasibility of re -use water from the HCRWRF and needed improvements for a non -potable water system to serve the User. Task 1 — Water Svstem Evaluation System Analysis: The existing City water model will be updated prior to this water system evaluation under a separate IPO. Kimley-Horn will perform an analysis of the water system and infrastructure sizing to incorporate an Industrial User. Kimley-Horn will utilize the existing water system model to size infrastructure to serve a future Industrial User. This analysis will include: A. Execution of the model to identify infrastructure improvements necessary to meet demands with the addition of an Industrial User. B. Execution of fire flow simulations to identify infrastructure improvements necessary to meet fire flow requirements with addition of an Industrial User. C. The following components will be evaluated and sized: a. Water lines b. Ground storage c. Elevated storage d. Pump stations e. Water supply rev 1/2021 Kimley-Horn will develop a Water Improvement Plan that identifies projects to be constructed for the addition of an Industrial User. This will Include: A. Development of project list. B. Development of opinions of probable construction cost for the water system improvements proposed in the water system evaluation. C. Updated Water System Map Task 2 — Wastewater System Evaluation System Analysis: The existing City wastewater model will be updated prior to this wastewater system evaluation under a separate IPO. Kimley-Horn will perform an analysis of the wastewater system and infrastructure sizing to incorporate an Industrial User. This analysis will include: A. Kimley-Horn will evaluate the phasing of the HCRWRF with the addition of an Industrial User. B. Kimley horn will evaluate the interceptor sizing to HCRWRF with the addition of an Industrial User. Kimley-Horn will develop a Wastewater Improvement Plan that identifies projects to be constructed for the addition of an Industrial User. This will Include: A. Development of project list. B. Development of opinions of probable construction cost for the wastewater improvements proposed in the wastewater system evaluation. C. Updated Wastewater System Map Task 3 — Re -Use Evaluation System Analysis: A. Re -use will be evaluated at the HCRWRF. Re -use options will be evaluated with the temporary treatment facility and the permanent treatment facility to be able to support the Industrial User. This will include the 30 TAC Chapter 210 re -use permit requirements and estimated time to obtain. Kimley-Horn will document the estimated water quality requirements necessary to obtain a 210 permit. B. Kimley-Horn will evaluate two (2) non -potable water storage and pumping alternatives and determine available re -use flow rate. Kimley-Horn will develop a Re -use Improvement Plan that identifies projects to be constructed for the addition of an Industrial User. This will Include: A. Development of project list. B. Development of opinions of probable construction cost for the re -use alternatives proposed in the system evaluation. C. Re -Use System Map Task 4 — Final Report Kimley-Horn will summarize results and findings from Tasks 1, 2, and 3 into a final report. Deliverables: a. Prepare draft report for review and comment by City b. Prepare final report based on city comments rev 1/2021 The report is anticipated to include the following: a. Executive summary b. Introduction c. Design criteria and modeling methodology d. Analysis and recommendations e. Proposed project lists i. Opinion of probable construction cost J. Project descriptions iii. Map of proposed water system projects iv. Map of proposed wastewater system projects v. Map of proposed re -use system projects Additional Services if required: Any services not specifically provided for in the above scope will be billed as additional services and performed at Kimley-Horn's then current hourly rate. Additional services Kimley-Horn can provide include, but are not limited to the following: - Flow monitoring - TCEQ permitting - Evaluation of additional Industrial User locations - Rainfall monitoring - Survey services - Geotechnical engineering services - Preparing applications and supporting documents for government grants, loans, or planning advances, and providing data for detailed applications. - Any services not listed in the Scope of Services Schedule: The consultant will provide the services listed in the Scope of Services upon receipt of signed IPO within a length of time as mutually agreed to by both the client and consultant. Terms of Compensation: Kimley-Horn will perform the Scope of Service for the lump sum fee below: Task 1: Water System Evaluation Task 2: Wastewater System Evaluation Task 3: Re -use Evaluation Task 4: Final Report $25, 000 $20, 000 $10,000 $5,000 Lump sum fees will be invoiced monthly based upon the overall percentage of services performed. rev 1/2021 ACCEPTED: CITY OF ANNA BY: r TITLE: V eL `� it oL J DATE: VV l rev 1/2021 KIMLEY-HORN AND ASSOCIATES, INC. WA TITLE: Senior Vice President DATE: 12/09/2024