HomeMy WebLinkAboutRes 2013-05-01 Change Order 4- Parkscape.pdfCITY OF ANNA, TEXAS RESOLUTION NO. 2013-05-01 A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING THE CITY MANAGER TO ACT ON THE CITY'S BEHALF IN EXECUTING AND APPROVING CHANGE ORDER NO. 4 TO THE CONTRACT WITH PARKSCAPE CONSTRUCTION INC, FOR SLAYTER CREEK PARK PHASE 11. WHEREAS, on October 23, 2012, the City of Anna, Texas (the City) award a contract to Parkscape Construction Inc. for Slayter Creek Phase 11 (the "Project"), and; WHEREAS, during the course of construction City Staff has identified several changes that need to be made to the Project (Installation of additional concrete trails to make logical connections to splash pad, parking lot, tennis court, and an area of concrete between the ball fields. Other needed concrete includes an additional Disc Golf Tee Box and three picnic table pads. Other items within this change order includes an additional 20 feet of 21foot high fence, labor for a parking lot drainage basin, and the remodel of a low water crossing to facilitate storm water movement.), and the cost of these changes (Change Order No. 4) will be $39,336.00, and; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Approval of Change Order No. 4. The City Council hereby approves Change Order 4 with Parkscape Construction Inc., attached hereto as Exhibit 1 and Exhibit 2 respectively; and authorizes, ratifies and approves the City Manager's execution of same. The City Manager is hereby authorized to execute all documents and to take all other actions necessary to finalize, act under, and enforce the Change Orders. PASSED AND APPROVED by the City Council of the City of Anna, Texas, on this 14th day of May, 2013. ATTEST: 7/7/ :/} �- `\\�U%uuliilriu,,� OF /y N ha Wilkison, i y Secretary ? C�; a"�' Mayor, Mike Crist a p ; P RES. 2013-05-01 Change Order 4 — Parkscape — Slayter9 se 11 PAGE 1 OF 1 05-14-13 Item No. City Secretary's use only Date of Issuance: JEffective Date: Owner: City of Anna, TX Project: Slayter Creek Park Phase II Contract changes are approved as follows: Description of changes: Installation of additional concrete trails to make logical connections to splash pad, parking lot, tennis court, and an area of concrete between the ball fields. Other needed concrete includes an additional Disc Golf Tee Box and three picnic table pads. Other items within this change order includes an additional 20 feet of 21foot high fence, labor for a parking lot drainage basin, and the remodel of a low water crossing to facilitate storm water movement. Reason for Change Order: Park detailing to make the elements of Slayter Creek Park more functional. Attachments: Table detailing the description of the changes. CONTRACT PRICING Original Contract Amount including Add/Alternates: $ 1,190,713.10 Net Increase from Previous Change Orders: $ (133,620.66) Contract Price Prior to this Change Order: $ 1,057,092.44 Net Increase/Decrease of this Change Order: $ 39,336.00 Contract Price with All Approved Change Orders: $ 1,096,428.44 City of Anna, TX By: Philip Sanders, City Manager Date: Please sign both copies; return one copy to: c/o Maurice Schwanke PO Box 776 Anna, TX 75409-0776 Parkscape Construction, Inc. By: Cindy Craig Date: City of Anna, TX Item No. City Secretary's use only CHANGE ORDER No. 4 Slayter Creek Park Phase II Improvements City of Anna, Texas 5/8/2013 No. Description of Scope Change Cost 1 Install 1,332 sft. additional trail complete- $ 6,327.00 2 Install 4 ea. 8' ramps, with curb and trail connections as required- $ 4,900.00 3 Install 2 ea. 6' ramps, with curb and trail connections as required- $ 3,000.00 4 Labor to install 100 If. of 12" pipe with one basin- $ 3,125.00 5 Add 201f. of 21' tall fence- $ 1,780.00 6 Low water crossing as per detail, including demo, concrete headwall, $ 7,782.00 7 Install 3 ea. picnic table slabs, and 1 ea. disc golf tee slab- $ 1,740.00 8 Install 2,235 sft. of additional trail at Splash Park- $ 9,722.00 9 Bond- $ 960.00 TOTAL $ 39,336.00