Loading...
HomeMy WebLinkAboutRes 2013-06-03 Amending Change Orders 1 & 2 FM 455 Utility Relocation.pdfCog k yKel y_1 k, Ig EN i am RESOLUTION NO. 2013-06-03 A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING THE CITY MANAGER TO ACT ON THE CITY'S BEHALF IN EXECUTING AND APPROVING AN AMENDMENT TO CHANGE ORDER NO. 1 AND CHANGE ORDER NO. 2 TO THE CONTRACT WITH QUALITY EXCAVATION, LTD. FOR THE FM 455 UTILITY RELOCATION PROJECT. WHEREAS, On April 23, 2013 the City Council of the City of Anna, Texas (the "City Council") approved Change Order No. 1 and Change Order No. 2 to the FM 455 Utility Relocation Project Contract, and; WHEREAS, the amount for Change Order No. 1 was incorrectly calculated to be $152,905.50, and; WHEREAS, the actual amount for Change Order No. 1 is $157,265.50, and; WHEREAS, the amount of Change Order No. 2 was correctly calculated and reported at $69,829.25 and remains unchanged; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Approval of Amended Change Order No. 1 and Change Order No. 2. The City Council hereby approves the amended Change Order No. 1 and Change Order No. 2 to the contract with Quality Excavation, Ltd., attached hereto as Exhibit 1 and Exhibit 2 respectively; and authorizes, ratifies and approves the City Manager's execution of same. The City Manager is hereby authorized to execute all documents and to take all other actions necessary to finalize, act under, and enforce the Change Orders. PASSED AND APPROVED by the City Council of the City of Anna, Texas, on this 25th day of June, 2013. ATTEST: APPR OF N ha Wilkison; City Secretary ,��;P�"�llayor, Mike Crist RES. 2013-06-03 Amending Change Orders 1& 2 FM 4551jed Reloca #ion �� PAGE 1 OF 1 06-25-13 ���P Pp Pgg9i ��,� Date of Issuance: 06/11/2013 Effective Date: 06/18/2013 Owner: City of Anna, TX Project: FM 455 Utility Relocations Contract changes are approved as follows: Description of changes: Addition of valves, hydrants, fittings and connections of water line. Reason for Chane Order: Original TxDOT survey was an aerial survey and did not pick up all existing valves and hydrants. Development also occurred since the original survey was performed 7 years ago. Attachments: Memo to the City Manager CONTRACT PRICING Original Contract Amount including Add/Alternates $1,226,676.00 Net Increase from Previous Change Orders: $ 0.00 Contract Price Prior to this Change Order: $ 1,226,676.00 Net Increase/Decrease of this Change Order: $ 157,265.50 Contract Price with All Approved Change Orders: $ 1,383,941.50 City of Anna, TX By: Philip Sanders, City Manager Date: Please sign both copies; c/o Philip Sanders PO Box 776 Anna, TX 75409-0776 Quality Excavation, LTD By: Date: ry , / 7. return one copy to: City of Anna, TX Page 1 of 1 O G) 2 -M" m & 0 D Z m zD z v n p mDo -moi z 0 0m ,Am xm r 00 mn 0 vmto ;a 21 �{plIItt -+O N Oi b �a N� S y m Og < FieFie �m N+S; ANO mac m c5WCC C 00 1;�: Nl A w��0iC O 0s o � b �Nm m+mPN p ,y OVo VAN NO.+ �p O 4�H omct S- Na x � b r. O-�mj o JD -+A N1 CC G Ill p OwOI D �O O1 b O , c F o W � S NN wNw wlw NNIN w'wN wNl Nw wN M a1 C p o itl w-oe o g oI o 1� Sig'tf gg til a �$$ Ee E ¢go$ �t o�8o$a$oo;Eoo A D .ii CM m r wick ,1 f� Spo oog {{�� VX e'up I15;mwvdm'+I� ww www www w N www ww w w w ww w w w 0 0 O M m N mIplIJ{/ND�I Qpw fl pgW��py ID O y W A O(w� AID V SOON V Aw-�+I c (mcg 014W�6�� IJy Awa pa Dmp A t5 Se OOo 00 p 0008 ooee8 '6 ga geSg 88888g88SS6oS 7b� O G) 2 -M" m & 0 D Z m zD z v n p mDo -moi z 0 0m ,Am xm r 00 mn 0 vmto ;a 21 --T- Date of Issuance: 06/11/2013 Effective Date: 06/18/2013 Owner: City of Anna, TX Project: FM 455 Utility Relocations Contract changes are approved as follows: Description of changes: Relocation of approximately 900 feet of water line that is in conflict with the proposed noise wall construction adjacent to the Oak Hollow Subdivision. Reason for Change Order: TxDOT is constructing a noise wall along the ROW adjacent to the Oak Hollow subdivision as required by the environmental documentation. Attachments: Memo to the City Manager CONTRACT PRICING Original Contract Amount including Add/Alternates: $ 1,226,676.00 Net Increase from Previous Change Orders: $ 157,265.50 Contract Price Prior to this Change Order: $ 1,383,941.50 Net Increase/Decrease of this Change Order: $ 69,829.25 Contract Price with All Approved Change Orders: $ 1,453,770.75 City of Anna, TX By: Philip Sanders, City Manager Dater Quality Excavation, LTD �� X�L By: Date:, 7•�D/� Please sign both copies; return one copy to: City of Anna, TX c/o Philip Sanders PO Box 776 Anna, TX 75409-0776 Page 1 of 1 m z O Z -n m� vn zm zz z Od n o m�yo -10� 0 z O Wm n� z0 00 m> 60 m ai X 9