Loading...
HomeMy WebLinkAboutRes 2022-08-1233 Sherley Heritage Park Train project WOPAC Construction Inc.CITY OF ANNA, TEXAS RESOLUTION NO. (51 L: W= C! A RESOLUTION OF THE CITY OF ANNA, TEXAS AWARDING THE SUBGRADE CONSTRUCTION FOR THE SHERLEY HERITAGE PARK HISTORIC TRAIN PROJECT TO WOPAC CONSTRUCTION, INCORPORATED, IN THE AMOUNT NOT TO EXCEED SEVENTY EIGHT THOUSAND EIGHT HUNDRED SEVENTY-FIVE DOLLARS AND ZERO CENTS ($78,875.00); AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Sherley Heritage Park Historic Train Improvement Project is identified as a capital park improvement project in the City of Anna, Texas; and, WHEREAS, the City has identified funding for the project from the Park Development Fund; and, WHEREAS, Wopac Construction, Incorporated has a current contract with Collin County for paving improvements, which includes the construction of subgrade and installation of all materials required for the proposed work; and, WHEREAS, the City of Anna is utilizing the Collin County contract with Wopac Construction, Incorporated in accordance with the Collin County Purchasing Program; and, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS THAT. Section 1. Recitals Incorporated The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Authorization of Payment and Funding. That the City Council of the City of Anna hereby awards the Subgrade Construction for the Sherley Heritage Park Historic Train Project to WOPAC Construction, Incorporated, in an amount not to exceed $78,875.00, which includes $10,000 for contingency. That funding for the project shall come from the Park Development Fund. PASSED AND APPROVED by the City Council of the City of Anna, Texas on this day of August 2022, ATTEST: City Secretary, Carrie Land \``\\\,k\ n/a/,,,l. °y OF : 4''��, APPROVED: ayor, Nate Pike WQP1iC C©nst. Inc, P.ct. so::slc Pre:}er, 1:i?50?9 472.562Z315 ad a h: l e ac i m chpac p:ccor..t.cohi Quota To: Ciry ofA' rt ill N_ Powell Pla+v .4nev. TX 73409 Exhibit A Estimate Hs ti ma to No: Date: W OPAC 2211 $17r2022 �C'OP:iC: Ccnstniction Inc. her=matter called die company, offers to famish all labor, utaterials and equipntens required for d1e perfomtance of the follotting described wcrL Job and Location_ Prepare Subgrade for Train Tracks at Slvrley Park Item Description Quantity Unie Rate Amoun[ k.aE" vat=dirt tc a depth ch . Install Cercxnt Stabilization at a cepth of B' tsva 401G=_ 1 b_; S?x `=.0` i•'._`,5 I of Portland Cement per SY. 9nstn9 S' r Fexbase (S. b 6alast). Water, oompact and .OD 3rade. Install E' deep c` X ba last rock after tra r, tracks have been instated 1 LS S222791-0' q.?•3 ; 5.OD Graced Total S6S,S?e.CO WOPAC Const. Inc. P.O. Box 819 Prosper, TX 75078 972-562-8316 adamleachwopac@aol.com wopacconst.com Quote To: City ofAnna 111 N. Powell Pkwy Anna, TX 75409 Estimate Estimate No: Date: Mk MW AM%* 4WA 9 AWFA jawZAW 2211 8/ 17/2022 WOPAC Construction Inc. hereinafter called the company, o%rs to furnish all labor, materials and equipment required for the performance of the following described work. Job and Location: Prepare Subgrade for Train Tracks at Shirley Park. Item Description Quanti Unit Rate Amount 1Excavate dirt to a depth of 8". Install Cement Stabilization at a depth of 8" using 40lbs 1 LS $353500.0 $35,500,00 f Portland Cement per SY. Install 8" of Flexbase (Sub Ballast). Water, compact and Grade. 2 Install 8" deep of 3" ballast rock after train tracks have been installed. 1 LS $33237560 $33,375.00 Grand Total $68,875.00 By: