Loading...
HomeMy WebLinkAboutRes 2023-05-1440 Authorizing City Manager Execute Agreement with Grantham & AssociatesCITY OF ANNA, TEXAS RESOLUTION NO. 2-4 � 3 - 0 5 - (y 4 d A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A PROJECT SPECIFIC PURCHASE ORDER FOR PROFESSIONAL SERVICES BY AND BETWEEN THE CITY OF ANNA, TEXAS AND GRANTHAM & ASSOCIATES, INCORPORATED FOR ENGINEERING DESIGN SERVICES RELATED TO THE SLATER CREEK ROAD WATER IMPROVEMENT PROJECT, IN A FORM APPROVED BY THE CITY ATTORNEY, PER THE PROPOSAL SHOWN IN EXHIBIT "A" ATTACHED HERETO, AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Anna is the owner and operator of an undersized water main located in a utility easement along Slater Creek Road; and, WHEREAS, the undersized water main is in poor condition and must be replaced; and, WHEREAS, the services provided by Grantham & Associates, Incorporated will be funded through the Utility Department Funds in the Fiscal Year 2022-2023 Budget; and, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Authorization. A. That the funding shall be $90,115 in Utility Department Funds. B. That the City Council hereby approves entering into and authorizes the City Manager to execute a professional services agreement with Grantham & Associates, Incorporated for the scope of services identified in Exhibit "A" attached hereto. PASSED AND APPROVED 2023. ATTEST: by the City Council of the City of Anna, Texas, on this Q+ day of FAIJ 100 1 City Secretary, Carrie L. Land \*\*/7ayor Nate Pike 191, Water System Rehabilitation Project 2023-003 ' t r s 77777 ff � a I1 lGrantham & Associates, Inc. Civil Engineering & Surveying April 12, 2023 Mr. Justin Clay, CPM CIP Manager City of Anna 3223 N. Powell Pkwy Anna, TX 75409 Re: Slater Creek Road Water Improvements Proposal for Engineering and Surveying Services Dear Justin: Pursuant to your request, Grantham & Associates, Inc. (G&A) has prepared this proposal for engineering and surveying services associated with approximately 2,500 linear feet of water line replacement in Slater Creek Road. Scope of Services The scope of services for this project has been separated into Basic and Special Services as summarized below. Basic Services • Perform a topographic survey and property line survey of the corridor. • Plot plats and deeds along the project corridor. • Prepare 30%, 90%, and 100% plans for the improvements. • Prepare a quantity take -off and Opinion of Probable Construction Cost (OPCC) with each submittal. • Prepare bid documents and assist the City in bidding the project. • Provide construction support services to the City and prepare Record Drawings. Snecial Services • Prepare up to five (5) water easements. • An unforeseen items allowance is provided for additional services that may be required, such as subsurface utility engineering (SUE) potholes and TxDOT coordination. Assumptions • No field surveying will be performed in order to prepare Record Drawings; City and Contractor plan markups will be used exclusively. • G&A will prepare an Erosion Control Plan but the contractor will prepare a SWPPP. Fee The sheet count provided as Exhibit A was used to determine the design fee. The manhour estimate provided in Exhibit B was used to determine the fees for all phases except the engineering phase. The Opinion of Probable Construction Cost is included in Exhibit C. Mr. Justin Clay, CPM April 12, 2023 Page 2 Lump Sum (LS) fees are proposed except as noted as a Cost Plus (C+) reimbursable fee. The Cost -Plus fees provided shall not be exceeded without prior written approval of the City. Basic Services • Engineering • Set Survey Control Points • ROW & Property Survey • Topographic Survey • Bidding Services • Construction Services • Reimbursables Total Basic Services Special Services • Easement Preparation (5 @ $1,000 ea.) • Unforeseen Items Allowance Total Special Services Total Fee $ 44,000 (LS) $ 2,205 (LS) $ 93,455 (LS) $ %135 (LS) $ 31895 (LS) $ 7,425 (C+) $ 1,000 (LS) $ 77,115 $ 5,000 (per each) $ 8,000 (C+) $ 13,000 90,115 Please contact me if you have any questions regarding this Task Authorization #1. Very truly yours, Bruce Grantham, P.E. Attachments H:IWPDOCSIPROPOSALIANNAISLATER CREEK & QUAIL CREEK RUN WATERITA FY23-GA-01 SLATER CREEK PROPOSAL.DOCX EXHIBIT A - ENGINEERING COST CITY OF ANNA - SLATER CREEK ROAD WATER LINE IMPROVEMENTS TASK AUTHORIZATION #1 April 12, 2023 Summary of Sheets & Bid Documents Sheet Index I No. Sheets I Cost per Sheet I Sheet Cost Cover 1 $1,000 $1,000 R.O.W. & Dimensional Control Plan (1" = 40' scale) 2 $2,000 $4,000 Quantities & Project Notes 1 $4,500 $4,500 Erosion Control (1" = 40' scale) 2 $2,500 $5,000 Water Plan (6") Plan 3 $6,500 $19,500 Utility Crossing Profiles 1 $6,500 $6,500 Subtotal Plan Cost 10 $40,500 Bid Documents & OPCC's $3,500 Total Engineering Cost $44,000 Note: All sheets are 1" = 20' scale unless otherwise noted. EXHIBIT B - MANHOUR PROJECTION CITY OF ANNA - SLATER CREEK ROAD WATER IMPROVEMENTS TASK AUTHORIZATION #1 4/12/2023 ESTIMATED MANHOURS Project Project Design CADD Survey Survey 1 Man Principal Manager Tech Tech Admin Manager Tech Survey TOTAL $265 $170 $140 $90 $105 $210 $110 $155 BASIC SERVICES - TASK DESCRIPTION SET SURVEY CONTROL POINTS TIE INTO CITY SURVEY CONTROL 1 1 2 SET PROJECT SURVEY CONTROL 1 1 1 1 2 8 12 SUTOTAL CONTROL HOURS 0 1 1 0 1 0 1 0 1 2 2 9 14 SUTOTAL CONTROL COST $0 $170 $0 1 $0 I $0 1 $420 1 $220 1 $1,395 1 $2,205 ROW AND PROPERTY SURVEY OBTAIN & REVIEW PLATS AND DEEDS 1 2 6 9 LOCATE PROPERTY CORNERS 2 4 24 30 SET DOWN PROPERTIES IN CADD FILE 1 2 10 13 ADD OWNERSHIP INFORMATION AND ADDRESSES IN CAD FILE 1 1 1 2 1 1 1 1 1 4 PREPARE ROW AND PROPERTY STRIP MAP 1 1 8 1 1 1 1 12 SUTOTAL PROPERTY SURVEY HOURS 1 4 0 10 0 7 22 24 59 SUTOTAL PROPERTY SURVEY COST $265 $680 $0 $900 $0 $1,470 $2,420 $3,720 $9,455 TOPOGRAPHIC SURVEY CONTACT TEXAS811 AND SURVEY UTILITY MARKERS 1 3 4 TOPOGRAPHIC SURVEY 1 1 4 27 33 PROCESS SURVEY DATA 1 2 3 PREPARE PLAN BASE SHEETS 1 8 8 17 SUTOTAL TOPOGRAPHIC SURVEY HOURS 1 2 0 8 0 14 2 30 57 SUTOTAL TOPOGRAPHIC SURVEY COST $265 $340 $0 $720 $0 $2,940 $220 $4,650 $9,135 BIDDING SERVICES FURNISH PLANS AND BID DOCUMENTS TO CITY & PLAN ROOMS 1 1 1 3 ATTEND PRE -BID CONFERENCE 4 4 RESPOND TO CONTRACTOR BID QUESTIONS 2 2 PREPARE ADDENDA 1 2 1 4 2 9 TABULATE BIDS AND PREPARE CONTRACTOR RECOMMENDATION 4 1 1 5 PREPARE CONFORMED PROJECT MANUAL 2 1 2 4 SUBTOTAL BIDDING PHASE HOURS 1 15 1 0 5 6 0 0 0 27 SUBTOTAL BIDDING PHASE COST $265 $2,550 $0 $450 $630 $0 $0 $0 $3,895 H:IWPDOCSIPROPOSALIAnnalSlater Creek & Quail Creek Run Water\TA FY22-GA-01 Slater Creek Exhibits.xlsx ESTIMATED MANHOURS Project Project Design CADD Survey Survey 1 Man Principal Manager Tech Tech Admin Manager Tech Survey TOTAL $265 $170 $140 $90 $105 $210 $110 $155 CONSTRUCTION SERVICES PREPARE FOR -CONSTRUCTION PLANS 1 1 4 6 PRECONSTRUCTION MEETING 1 4 4 REVIEW SHOP DRAWING SUBMITTALS 8 8 REVIEW CHANGE ORDERS & RFI'S 1 2 6 2 11 TRACK & LOG CHANGE ORDERS & SUBMITTALS 1 1 CONSTRUCTION SITE VISIT 1 4 4 FINAL WALK-THROUGH i 4 4 RECORD DRAWINGS 1 1 2 12 15 SUBTOTAL CONSTRUCTION HOURS 1 1 25 1 9 16 1 2 0 0 0 53 SUBTOTAL CONSTRUCTION COST $265 1 $4,250 1 $1,260 $1,440 1 $210 $0 $0 $0 $7,425 Basic Services Fee Summary ENGINEERING SET SURVEY CONTROL POINTS ROW AND PROPERTY SURVEY TOPOGRAPHIC SURVEY BIDDING SERVICES CONSTRUCTION SERVICES REIMBURSABLES Special Services Fee Summary EASEMENTS (5 @ $1,000 EA.) UNFORESEEN ITEM ALLOWANCE HAWPDOCSIPROPOSALIAnna\Slater Creek & Quail Creek Run Water%TA FY22-GA-01 Slater Creek Exhibits.xlsx $ 44,000 $ 2,205 $ 9,455 $ 9,135 $ 3,895 $ 7,425 $ 1,000 Subtotal Basic Services $ 77,115 $ 5,000 $ 8,000 Subtotal Special Services $ 13,000 Total $ 90,115 EXHIBIT C SLATER CREEK ROAD WATER IMPROVEMENTS OPINION OF PROBABLE CONSTRUCTION COST April 12.2023 ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST 1 SAWCUT, REMOVE & DISPOSE CONCRETE PAVEMENT SY 25 $75.00 $1,875.00 2 REMOVE & DISPOSE GRAVEL STREET SY 150 $55.00 $8,250.00 3 FURNISH & INSTALL 6" CONCRETE PAVEMENT (4,000 PSI) SY 25 $90.00 $2,250.00 4 FURNISH & INSTALL GRAVEL STREET SY 150 $40.00 $6,000.00 5 REMOVE & REPLACE BARRIER -FREE RAMP EA 1 $2,500.00 $2,500.00 6 FURNISH & INSTALL WATER 6" DR-18 PVC LF 2,500 $75.00 $187,500.00 7 FURNISH & INSTALL DUCTILE IRON FITTINGS TN 1 $15,000.00 $15,000.00 8 FURNISH AND INSTALL 6" GATE VALVE EA 7 $3,500.00 $24,500.00 9 FURNISH AND INSTALL 8" GATE VALVE EA 1 $4,C00.00 $4,000.00 10 FURNISH AND INSTALL AUTOMATIC FLUSHING DEVICE EA 1 $10,000.00 $10,000.00 11 FURNISH & INSTALL FIRE HYDRANT WITH 6" VALVE & 6" LEAD EA 6 $8,500.00 $51,000.00 12 FURNISH & INSTALL 1" WATER SERVICE EA 10 $2,200.00 $22,000.00 13 TRENCH SAFETY (FOR WATER) LF 2,500 $2.00 $5,000.00 14 SODDING SY 2,750 $10.00 $27,500.00 15 EROSION CONTROL LS 1 $5,000.00 $5,000.00 16 MOBILIZATION LS 1 $15,000.00 $15,000.00 17 FURNISH & INSTALLTRAFFIC CONTROL LS 1 $7,500.00 $7,500.00 18 FURNISH AND INSTALL TEMPORARY CONSTRUCTION FENCE LF 500 $20.00 $10,000.00 19 MATERIALS TESTING LS 1 $5,000.00 $5,000.00 SUBTOTAL:j $409,875.00 CONTINGENCY (20%): $81,975.00 TOTAL:j $491,850.00