HomeMy WebLinkAboutRes 2023-05-1440 Authorizing City Manager Execute Agreement with Grantham & AssociatesCITY OF ANNA, TEXAS
RESOLUTION NO. 2-4 � 3 - 0 5 - (y 4 d
A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING
THE CITY MANAGER TO EXECUTE A PROJECT SPECIFIC PURCHASE ORDER FOR
PROFESSIONAL SERVICES BY AND BETWEEN THE CITY OF ANNA, TEXAS AND
GRANTHAM & ASSOCIATES, INCORPORATED FOR ENGINEERING DESIGN
SERVICES RELATED TO THE SLATER CREEK ROAD WATER IMPROVEMENT
PROJECT, IN A FORM APPROVED BY THE CITY ATTORNEY, PER THE PROPOSAL
SHOWN IN EXHIBIT "A" ATTACHED HERETO, AND PROVIDING FOR AN EFFECTIVE
DATE.
WHEREAS, the City of Anna is the owner and operator of an undersized water main located in
a utility easement along Slater Creek Road; and,
WHEREAS, the undersized water main is in poor condition and must be replaced; and,
WHEREAS, the services provided by Grantham & Associates, Incorporated will be funded
through the Utility Department Funds in the Fiscal Year 2022-2023 Budget; and,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ANNA, TEXAS, THAT:
Section 1. Recitals Incorporated.
The recitals above are incorporated herein as if set forth in full for all purposes.
Section 2. Authorization.
A. That the funding shall be $90,115 in Utility Department Funds.
B. That the City Council hereby approves entering into and authorizes the City Manager to
execute a professional services agreement with Grantham & Associates, Incorporated for
the scope of services identified in Exhibit "A" attached hereto.
PASSED AND APPROVED
2023.
ATTEST:
by the City Council of the City of Anna, Texas, on this Q+ day of
FAIJ 100 1
City Secretary, Carrie L. Land \*\*/7ayor Nate Pike
191,
Water System Rehabilitation Project 2023-003
' t
r
s
77777
ff �
a
I1
lGrantham & Associates, Inc.
Civil Engineering & Surveying
April 12, 2023
Mr. Justin Clay, CPM
CIP Manager
City of Anna
3223 N. Powell Pkwy
Anna, TX 75409
Re: Slater Creek Road Water Improvements
Proposal for Engineering and Surveying Services
Dear Justin:
Pursuant to your request, Grantham & Associates, Inc. (G&A) has prepared this proposal for
engineering and surveying services associated with approximately 2,500 linear feet of water line
replacement in Slater Creek Road.
Scope of Services
The scope of services for this project has been separated into Basic and Special Services as
summarized below.
Basic Services
• Perform a topographic survey and property line survey of the corridor.
• Plot plats and deeds along the project corridor.
• Prepare 30%, 90%, and 100% plans for the improvements.
• Prepare a quantity take -off and Opinion of Probable Construction Cost (OPCC) with
each submittal.
• Prepare bid documents and assist the City in bidding the project.
• Provide construction support services to the City and prepare Record Drawings.
Snecial Services
• Prepare up to five (5) water easements.
• An unforeseen items allowance is provided for additional services that may be required,
such as subsurface utility engineering (SUE) potholes and TxDOT coordination.
Assumptions
• No field surveying will be performed in order to prepare Record Drawings; City and
Contractor plan markups will be used exclusively.
• G&A will prepare an Erosion Control Plan but the contractor will prepare a SWPPP.
Fee
The sheet count provided as Exhibit A was used to determine the design fee. The manhour
estimate provided in Exhibit B was used to determine the fees for all phases except the
engineering phase. The Opinion of Probable Construction Cost is included in Exhibit C.
Mr. Justin Clay, CPM
April 12, 2023
Page 2
Lump Sum (LS) fees are proposed except as noted as a Cost Plus (C+) reimbursable fee. The
Cost -Plus fees provided shall not be exceeded without prior written approval of the City.
Basic Services
• Engineering
• Set Survey Control Points
• ROW & Property Survey
• Topographic Survey
• Bidding Services
• Construction Services
• Reimbursables
Total Basic Services
Special Services
• Easement Preparation (5 @ $1,000 ea.)
• Unforeseen Items Allowance
Total Special Services
Total Fee
$ 44,000 (LS)
$ 2,205 (LS)
$ 93,455 (LS)
$ %135 (LS)
$ 31895 (LS)
$ 7,425 (C+)
$ 1,000 (LS)
$ 77,115
$ 5,000 (per each)
$ 8,000 (C+)
$ 13,000
90,115
Please contact me if you have any questions regarding this Task Authorization #1.
Very truly yours,
Bruce Grantham, P.E.
Attachments
H:IWPDOCSIPROPOSALIANNAISLATER CREEK & QUAIL CREEK RUN WATERITA FY23-GA-01 SLATER CREEK PROPOSAL.DOCX
EXHIBIT A - ENGINEERING COST
CITY OF ANNA - SLATER CREEK ROAD WATER LINE IMPROVEMENTS
TASK AUTHORIZATION #1
April 12, 2023
Summary of Sheets & Bid Documents
Sheet Index I No. Sheets I Cost per Sheet I Sheet Cost
Cover
1
$1,000
$1,000
R.O.W. & Dimensional Control Plan (1" = 40' scale)
2
$2,000
$4,000
Quantities & Project Notes
1
$4,500
$4,500
Erosion Control (1" = 40' scale)
2
$2,500
$5,000
Water Plan (6") Plan
3
$6,500
$19,500
Utility Crossing Profiles
1
$6,500
$6,500
Subtotal Plan Cost 10 $40,500
Bid Documents & OPCC's $3,500
Total Engineering Cost $44,000
Note: All sheets are 1" = 20' scale unless otherwise noted.
EXHIBIT B - MANHOUR PROJECTION
CITY OF ANNA - SLATER CREEK ROAD WATER IMPROVEMENTS
TASK AUTHORIZATION #1
4/12/2023
ESTIMATED MANHOURS
Project Project Design CADD Survey Survey 1 Man
Principal Manager Tech Tech Admin Manager Tech Survey TOTAL
$265 $170 $140 $90 $105 $210 $110 $155
BASIC SERVICES - TASK DESCRIPTION
SET SURVEY CONTROL POINTS
TIE INTO CITY SURVEY CONTROL
1
1
2
SET PROJECT SURVEY CONTROL
1
1
1
1
2
8
12
SUTOTAL CONTROL HOURS
0
1
1 0
1 0
1 0
1 2
2
9
14
SUTOTAL CONTROL COST
$0
$170
$0
1 $0
I $0
1 $420
1 $220
1 $1,395
1 $2,205
ROW AND PROPERTY SURVEY
OBTAIN & REVIEW PLATS AND DEEDS
1
2
6
9
LOCATE PROPERTY CORNERS
2
4
24
30
SET DOWN PROPERTIES IN CADD FILE
1
2
10
13
ADD OWNERSHIP INFORMATION AND ADDRESSES IN CAD FILE
1
1
1 2
1
1 1
1
1 4
PREPARE ROW AND PROPERTY STRIP MAP
1
1
8
1
1
1
1 12
SUTOTAL PROPERTY SURVEY HOURS
1
4
0
10
0
7
22
24
59
SUTOTAL PROPERTY SURVEY COST
$265
$680
$0
$900
$0
$1,470
$2,420
$3,720
$9,455
TOPOGRAPHIC SURVEY
CONTACT TEXAS811 AND SURVEY UTILITY MARKERS
1
3
4
TOPOGRAPHIC SURVEY
1
1
4
27
33
PROCESS SURVEY DATA
1
2
3
PREPARE PLAN BASE SHEETS
1
8
8
17
SUTOTAL TOPOGRAPHIC SURVEY HOURS
1
2
0
8
0
14
2
30
57
SUTOTAL TOPOGRAPHIC SURVEY COST
$265
$340
$0
$720
$0
$2,940
$220
$4,650
$9,135
BIDDING SERVICES
FURNISH PLANS AND BID DOCUMENTS TO CITY & PLAN ROOMS
1
1
1
3
ATTEND PRE -BID CONFERENCE
4
4
RESPOND TO CONTRACTOR BID QUESTIONS
2
2
PREPARE ADDENDA
1
2
1
4
2
9
TABULATE BIDS AND PREPARE CONTRACTOR RECOMMENDATION
4
1
1
5
PREPARE CONFORMED PROJECT MANUAL
2
1
2
4
SUBTOTAL BIDDING PHASE HOURS
1
15
1 0
5
6
0
0
0
27
SUBTOTAL BIDDING PHASE COST
$265
$2,550
$0
$450
$630
$0
$0
$0
$3,895
H:IWPDOCSIPROPOSALIAnnalSlater Creek & Quail Creek Run Water\TA FY22-GA-01 Slater Creek Exhibits.xlsx
ESTIMATED MANHOURS
Project Project Design CADD Survey Survey 1 Man
Principal Manager Tech Tech Admin Manager Tech Survey TOTAL
$265 $170 $140 $90 $105 $210 $110 $155
CONSTRUCTION SERVICES
PREPARE FOR -CONSTRUCTION PLANS
1
1
4
6
PRECONSTRUCTION MEETING 1
4
4
REVIEW SHOP DRAWING SUBMITTALS
8
8
REVIEW CHANGE ORDERS & RFI'S
1
2
6
2
11
TRACK & LOG CHANGE ORDERS & SUBMITTALS
1
1
CONSTRUCTION SITE VISIT 1
4
4
FINAL WALK-THROUGH
i
4
4
RECORD DRAWINGS
1
1 2
12
15
SUBTOTAL CONSTRUCTION HOURS
1
1 25
1 9
16
1 2
0
0
0
53
SUBTOTAL CONSTRUCTION COST
$265
1 $4,250
1 $1,260
$1,440
1 $210
$0
$0
$0
$7,425
Basic Services Fee Summary
ENGINEERING
SET SURVEY CONTROL POINTS
ROW AND PROPERTY SURVEY
TOPOGRAPHIC SURVEY
BIDDING SERVICES
CONSTRUCTION SERVICES
REIMBURSABLES
Special Services Fee Summary
EASEMENTS (5 @ $1,000 EA.)
UNFORESEEN ITEM ALLOWANCE
HAWPDOCSIPROPOSALIAnna\Slater Creek & Quail Creek Run Water%TA FY22-GA-01 Slater Creek Exhibits.xlsx
$
44,000
$
2,205
$
9,455
$
9,135
$
3,895
$
7,425
$
1,000
Subtotal Basic Services $
77,115
$
5,000
$
8,000
Subtotal Special Services $
13,000
Total $ 90,115
EXHIBIT C
SLATER CREEK ROAD WATER IMPROVEMENTS
OPINION OF PROBABLE CONSTRUCTION COST
April 12.2023
ITEM NO.
DESCRIPTION
UNIT
QUANTITY
UNIT COST
TOTAL COST
1
SAWCUT, REMOVE & DISPOSE CONCRETE PAVEMENT
SY
25
$75.00
$1,875.00
2
REMOVE & DISPOSE GRAVEL STREET
SY
150
$55.00
$8,250.00
3
FURNISH & INSTALL 6" CONCRETE PAVEMENT (4,000 PSI)
SY
25
$90.00
$2,250.00
4
FURNISH & INSTALL GRAVEL STREET
SY
150
$40.00
$6,000.00
5
REMOVE & REPLACE BARRIER -FREE RAMP
EA
1
$2,500.00
$2,500.00
6
FURNISH & INSTALL WATER 6" DR-18 PVC
LF
2,500
$75.00
$187,500.00
7
FURNISH & INSTALL DUCTILE IRON FITTINGS
TN
1
$15,000.00
$15,000.00
8
FURNISH AND INSTALL 6" GATE VALVE
EA
7
$3,500.00
$24,500.00
9
FURNISH AND INSTALL 8" GATE VALVE
EA
1
$4,C00.00
$4,000.00
10
FURNISH AND INSTALL AUTOMATIC FLUSHING DEVICE
EA
1
$10,000.00
$10,000.00
11
FURNISH & INSTALL FIRE HYDRANT WITH 6" VALVE & 6" LEAD
EA
6
$8,500.00
$51,000.00
12
FURNISH & INSTALL 1" WATER SERVICE
EA
10
$2,200.00
$22,000.00
13
TRENCH SAFETY (FOR WATER)
LF
2,500
$2.00
$5,000.00
14
SODDING
SY
2,750
$10.00
$27,500.00
15
EROSION CONTROL
LS
1
$5,000.00
$5,000.00
16
MOBILIZATION
LS
1
$15,000.00
$15,000.00
17
FURNISH & INSTALLTRAFFIC CONTROL
LS
1
$7,500.00
$7,500.00
18
FURNISH AND INSTALL TEMPORARY CONSTRUCTION FENCE
LF
500
$20.00
$10,000.00
19
MATERIALS TESTING
LS
1
$5,000.00
$5,000.00
SUBTOTAL:j $409,875.00
CONTINGENCY (20%): $81,975.00
TOTAL:j $491,850.00