Loading...
HomeMy WebLinkAboutRes 2017-05-321 TASA Program CITY OF ANNA, TEXAS RESOLUTION NO. A RESOLUTION OF THE CITY OF ANNA, TEXAS APPROVING AND AUTHORIZING NOMINATION OF A TEXAS DEPARTMENT OF TRANSPORTATION, TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM PROJECT. WHEREAS, the Texas Department of Transportation (the Department or TxDOT) has issued a call for candidate projects for the Transportation Alternatives Set-Aside Program (TASA); and, WHEREAS, the City of Anna, Texas Public Works Department has worked together with the Planning & Development Department to develop the City of Anna Safe Routes to School Project; and, WHEREAS, children walking to school and general pedestrian activity would benefit from sidewalks where none exist today; and, WHEREAS, the project cited above would provide connectivity for pedestrians and bicycle traffic between important community destinations like schools, neighborhoods, employment centers, shopping, recreational areas and provide for safe routes to school; and, WHEREAS, the City of Anna City Council supports funding this project as described in the 2017 Transportation Alternatives Set-Aside Nomination Form (including construction budget, the Department's 15% administrative costs and the required local match) and is willing to commit to the project's development, implementation, construction, maintenance, management and financing, The City of Anna is willing and able to enter into an agreement with the Department by Resolution should the project be selected for TASA funding, and it is further understood that the City, if selected, is responsible for all cost overruns, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANNA, TEXAS, THAT: Section 1. Recitals Incorporated. The recitals above are incorporated herein as if set forth in full for all purposes. Section 2. Authorization. The City of Anna apply to the Texas Department of Transportation for a Transportation Alternatives Set-Aside Program grant for funding to complete sections of the Safe Routes to School Project as described above. Section 3. Project Costs. RESOLUTION:TA Set-Aside Project PAGE 1 OF 1 5/9/17 That if TxDOT approves funding through the Transportation Alternatives Set-Aside Program (TASA), the City of Anna will provide at least 15% in administrative costs and the 20% local match for construction. Section 4. Authorized Representative. The City Manager is hereby appointed as the designated representative, authorized and directed to execute all documents necessary to effectuate this nomination and acceptance, if awarded. PASSED AND APPROVED by the City Council of the City of Anna, Texas, on this 16th day of May 2017. ATTEST: APPROVED: v, City Secretary Carrie L. Smith NKYor Pro Tem Justin Burr O F ®®~\ • • Oil f r • a S q RESOLUTION:TA Set-Aside Project PAGE 2 OF 1 5/9/17 ANNAHIGH SCHOOL ANNA MIDDLE SCHOOL txtna,„J.r,* w vai�x'ne 14�. s $ r � b „ i 9t 4a fta,'T. w Afiebr rPy, S n n 4farwgsa.f'.ix wU(kx.: � � WLt } � F..ntR.9F .W Sa'.Y Eartl 3iE tat 01 xwt B e;ea,� e s hirrta. i;' Gr:v+,ahm.nx � nab Nd"drim WJt '.K'nNti 9k NhFb i .. R urvu:dAr - ,;ku+vl+rt Y'Mh. X,4,wytux0.tl. =uxe tl u' Y.nnutva hx _. y i .. VC 5 SUE EVELYN RATTAN * ELEMENTARY SCHOOL 61, cA aav wear. u F z a. JflIaARfl,ta.C' t.M'hF'weU4 YVt' w e..Ift Y; YN�ttturrty np r" F" , M �n vtsn?'Par..Po. N'ta Mta.zvx vAnk ' A° :ii X9 ac a q'tt' a s.n1,x R x.� KKF z e.t '.id.;'ir W uiPrnC IM,aV u�� "p"' t-1 w Ra Gau' 4 Aa+t&r PECAN GROVE re0s"}''4'.tb Sources Esri,HERE,DeLorme,USGS,Inter—p,increment P Corp.,NRCAN,Esri'Japan,�METI, Esri China(Hong Kong),Earl(Thailand),Mapmylndia,®OpenStreetMap contnbutom,and the GIS User Community 2017 TxDOT TRANSPORTATION ALTERNATIVE Legend SET-ASIDE PROGRAM Powell Sidewalk POSSIBLE SIDEWALK LOCATIONS IQ CITY OF ANNA,TX -W.White St.Crossing I`IAYTER Pecan Grove Trail ENGINEERING, INC i'UPr#6:..J 5 i TUPLSaig32a6W Elementary School 0 1,000 2,000 444s5El.onp2961 sa;s,rA7546 Feet rptnrot a 0412017 PROJECT NO.:040001 FIGURE:1 W ANNA MIDDLE SCHOOL m:,rara,h,y� V'�gArt, n. X K rrzrid�k'p'r, }'�z ' i,,artirnp,Lri YGs',l ripse}1.Cs t n.yy»rwCC rir. n. tMvx!hmP"TMr�tt Uv W.5rp'a1 u '" Fnnr,m:ai cr Anna &ai,W,pe d�}f Acw.iu'Le a aouv +r +,«u .WmiY .ryr 45 fik:xfi,rogvay 1)e e 9x4k mt n llim .. :'.fi:FV:Yk �,. "5 tlrvclt�erm ea,. ' � 3 M s' , ti< GY.uxa-,s,.,n hi see J2 Ifxz .ro x..C.Yh;P[ cHy+tR!'C110 ee z, f ti+ Ogg tiA+limp Pr&r,tMnF.tt Nf4 uA Sources:Esri,HERE,DeLorme,USGS,IMertnap,increment P Corp.,NRCAN,Est Japan,MET], = Esri China(Hong Kong),Esri(Thailand),Mapmylndia,0 OpenStreetMap contributors and the GIS User Community 2017 TxDOT TRANSPORTATION ALTERNATIVE SET-ASIDE PROGRAM Legend POSSIBLE SIDEWALK LOCATIONS CITY OF ANNA,TX Powell Sidewalk HAYTER WW il W.White St.Crossing ENGINEERING, iNG TWC0-3651 TBPL�.S iPtZA 600 0 500 1,000 4445 SF t-60P 296e fr,v,rX 75460Feet Nnrrmgn�,>ri�,:I. 0 .1� ftO_u-000001 1—n E:2 a WI, w— n"Illy 7" FF�SUE EVELYN RATTAN ELEMENTARY SCHOOL rr —h- sh" �JjNjn axn 4� 10000000 00000 Nscss%� PECAN GROVE eo Sources Esri,HERE,DeLorme,USGS,Intenmap,increment P Corp.,NRCAN,Esri Japan,MET], Esn China(Hong Kong),Esn(Thailand),Mapmy1ndia,0 OpenStreetMap contributors,and the GIS User Community 2017 TxDOT TRANSPORTATION ALTERNATIVE SET-ASIDE PROGRAM Legend POSSIBLE SIDEWALK LOCATIONS CITY OF ANNA,TX —Pecan Grove Trail HAYTER —Elementary School ENGINEERING, SNC 0 500 1,000 Feet F---a,, PROJECT NO.:—01 Opinion of Probable Construction Cost TXDOT-TRANSPORTATION ALTERNATIVES SET-ASIDE(TASA)APPLICATION Sidewalk Improvements City of Anna April 2017 Item# Description Estimated I uNIT COST TOTALCOST Powell Sidewalk 1 10'Wide ROW/sub-grade prep/grading 920 LF $19.00 $17,480.00 2 10'wide,4"thick sidewalk 870 LF $73.00 $63,510.00 3 10'wide,S"thick sidewalk 50 LF $91.00 $4,550.00 4 Rock Driveway Repair 28 SY $16.00 $448.00 5 24"RCP Storm Sewer 20 LF $91.00 $1,820.00 6 Standard Curb Ramp 4 EA $4,460.00 $17,840.00 7 Crosswalk stripes(24"wide) 113 LF $11.00 $1,237.50 8 Standard pedestrian crossing sign(W11-2)with post and footing 6 EA $640.00 $3,840.00 9 Regrassing(Sod) 153 SY $8.10 $1,239.30 10 Traffic Control(TxDOT ROW) 1 LS $10,000.00 $10,000.00 11 Mobilization 1 LS $8,000.00 $8,000.00 Powell Sidewalk Total $129,965.04 W.White Street 1 Trail Clearing(Medium) 0.16 AC $12,725.00 $2,036.00 2 10'Wide ROW/sub-grade prep/grading 340 LF $19-00 $6,460.00 3 10'wide,5"thick sidewalk 415 LF $91.00 $37,765.00 4 Concrete Stairs 1 EA $13,780.00 $13,780.00 5 Variable Height wall for back slope 330 LF $100.00 $33,000.00 6 Handrail 200 LF $82.00 $16,400.00 7 Lighting under bridge 1 LS $35,000.00 $35,000.00 8 Sidewalk footing across rip rap,12"thick,5'deep 65 LF $219.00 $14,235.00 9 Bridge Approaches 2 EA $2,568.12 $5,136.25 10 Concrete bridge abutments and wingwalls 6 EA $7,003.97 $42,023.84 11 Bridge placement and anchoring 5 EA $10,505.96 $52,529.80 12 Prefabricated pedestrian bridge/handicap ramp 184 LF $2,000.00 $368,000.00 13 1 Regrassing(Sod) 0 SY $8.10 $0.00 14 Traffic Control(TxDOT ROW) 1 LS 1 $25,000.00 $25,000.00 15 IMobilization 1 LS 1 $20,000.00 1 $20,000.00 W.White Street Total $671,366.00 Pecan Grove 1 Trail clearing(Light) 0.34 AC $7,940.00 $2,699.60 2 Trail clearing(Medium) 0.34 AC $12,725.00 $4,326.50 3 10'Wide ROW/sub-grade prep/grading 4,130 LF $19.00 J $78,470.00 4 10'wide,4"thick sidewalk 4,130 LF $73.00 $301,490.00 5 Permanent Bollards 3 EA $475.00 $1,425.00 6 6'Chain Link Fence 60 LF $20.00 $1,200.00 7 1 Ranch Style Gate 1 EA $1,000.00 $1,000.00 8 Handrail at bridge approaches 180 LF $82.00 $14,760.00 9 Bridge Approaches 6 EA $2,570.00 $15,420.00 10 Concrete bridge abutments and wingwalls 6 EA $7,000.00 $42,000.00 11 Bridge placement and anchoring 3 EA $10,500.00 $31,500.00 12 Prefabricated pedestrian bridge(100'x 10') 3 EA $140,000.00 $420,000.00 13 Regrassing(Sod) 688 SY $8.10 $5,572.80 14 ITraffic Control(TxDOT ROW) 1 LS $6,000.00 $6,000.00 1S Mobilization 1 LS $20,000.00 $20,000.00 Pecan Grove Total $945,864.00 School 1 10'Wide ROW/sub-grade prep/grading 465 LF $19.00 $8,835.00 2 10'wide,4"thick sidewalk 465 LF $73.00 $33,945.00 3 Concrete Stairs 1 EA $6,890.00 $6,890.00 4 Variable Height wall for back slope 233 LF $100.00 $23,300.00 5 Regrassing(Sod) 78 SY $8.10 $631.80 6 Traffic Control(TxDOT ROW) 1 LS $2,500.00 $2,500.00 7 IMobilization 1 LS 1 $5,000.00 1 $5,000.00 School Total $81,102.00 Project Total $1,828,297.00 X:`040 Anna\040001-Anna\02_Application for Finance\Supporting Documentation\Excel\Anna 2017 TxDOTTASA SW OPCC 4-25-2017